Skip to content
Royalty Clerk

Texas oil lease

Producing

GUITAR SOUTH 1-5-F

Guitar South 1-5-F is an oil lease in Howard County, Texas, operated by Pioneer Natural Res. USA, Inc. in the Spraberry (Trend Area) field.

1 well

9,731bbl oil, last 12 months−18% vs prior year
RRC lease
08-53994

Is your check right?

Check my statement

Where it sits

This county

Howard CountyHowardMitchellMartinScurryDawsonBordenHoward County
Howard County
Gas, last 12 months
23,751 mcf
Oil in Jul 2026
919 bbl

Checks stopped on this lease?

  • Buyer

    Buyer changed: ET GATHERING & PROCESSING LLC replaced ETC GAS PROCESSING, LLC as the buyer of this lease's gas from oil wells on Mar 1, 2026.

SourceRailroad Commission production, P-5 and P-4 records, data through Jul 2026.

See why checks stop on this lease

Production by month

Oil output fell 18% over the last 12 months

  • Oil (bars)
  • Gas (line)
  • Last 12 months
Oil output fell 18% over the last 12 monthsMonthly oil production and gas for GUITAR SOUTH 1-5-F, Aug 2023 to Jul 2026. Oil output fell 18% over the last 12 months. 9,731 bbl in the 12 months through Jul 2026, against 11,896 bbl in the 12 months before.Last 12 months: 9,731 bblbbl per monthmcf per month005002,5001,0005,0001,5007,5002,00010kOct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output fell 18% over the last 12 monthsMonthly oil production and gas for GUITAR SOUTH 1-5-F, Aug 2023 to Jul 2026. Oil output fell 18% over the last 12 months. 9,731 bbl in the 12 months through Jul 2026, against 11,896 bbl in the 12 months before.Last 12 monthsbbl per monthmcf per month005002,5001,0005,0001,5007,5002,00010kJan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

Where the gas went

77% of the gas went to a processing plant in the last 12 months

Flaring peaked at 43.8% of the gas in Mar 2026.

  • Processing plant (3)
  • Lease fuel (1)
  • Flared (4)
77% of the gas went to a processing plant in the last 12 monthsShare of GUITAR SOUTH 1-5-F gas by disposition code each month, Aug 2023 to Jul 2026. 77% of the gas went to a processing plant in the last 12 months. Flaring peaked at 43.8% of the gas in Mar 2026.Share of the lease’s gas by disposition code, per month0%50%100%Flared 43.8%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
77% of the gas went to a processing plant in the last 12 monthsShare of GUITAR SOUTH 1-5-F gas by disposition code each month, Aug 2023 to Jul 2026. 77% of the gas went to a processing plant in the last 12 months. Flaring peaked at 43.8% of the gas in Mar 2026.Share of gas by disposition code0%50%100%Flared 43.8%Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

  • Processing plant (3)

    77% · 18,266 mcf

  • Lease fuel (1)

    17% · 4,012 mcf

  • Flared (4)

    6.2% · 1,473 mcf

6.2% of the gas flared in the last 12 months. 20 months above 3%.

Who has run this lease

The operator changed once, most recently in Feb 2021

Operators of this lease over timeParsley Energy Operations, LLC, Jan 2020 to Jan 2021; Pioneer Natural Res. USA, Inc., Feb 2021 to Jul 20262020202120222023202420252026Changed Feb 2021Parsley Energy Operations, LLCJan 2020 to Jan 2021Pioneer Natural Res. USA, Inc.Feb 2021 to now
Operators of this lease over timeParsley Energy Operations, LLC, Jan 2020 to Jan 2021; Pioneer Natural Res. USA, Inc., Feb 2021 to Jul 20262020202120222023202420252026Changed Feb 2021Parsley Energy Operations, LLCJan 2020 to Jan 2021Pioneer Natural Res. USA, Inc.Feb 2021 to now

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

1 well on this lease

Wells on GUITAR SOUTH 1-5-F
API numberWell no.Status
42-227-399254311HActive

SourceTexas Railroad Commission Wellbore Query.

Buyers and gatherers

Companies named on the Form P-4, by product
CompanyProductRoleShare%FromUntil
Energy Transfer CompanyOilGathers100Feb 1, 2025–
Et Gathering & Processing LLCCasinghead gasBuys100Mar 1, 2026–
Energy Transfer CompanyCasinghead gasGathers100Dec 1, 2024–
Etc Gas Processing, LLCCasinghead gasBuys100Dec 1, 2024Mar 1, 2026
Nustar Permian Trans and Stg,llcOilGathers100Jun 21, 2019Feb 1, 2025
Wtg Gas Processing, LLCCasinghead gasGathers100Jan 1, 2022Dec 1, 2024
Wtg Gas Processing, LLCCasinghead gasBuys100Jan 1, 2022Dec 1, 2024
Wtg Gas Processing, L.p.Casinghead gasGathers100Jun 21, 2019Jan 1, 2022
Wtg Gas Processing, L.p.Casinghead gasBuys100Jun 21, 2019Jan 1, 2022

SourceRailroad Commission Form P-4 file, Sep 24, 2026 (source).

482 acres on the newest permit

  • Worth asking

    An allocation well is on this lease

    A well drilled across several tracts shares its production by an allocation formula, so the decimal is not always your acres over the unit acres. Ask the operator for the allocation formula and the tract factor for your land.

  • Worth asking

    A Rule 37 case is listed

    The RRC permit records list a Rule 37 case. This does not establish your royalty share. Ask for the permit and unit plat for your well.

Check your decimal on this lease
Permits for Guitar South 1-5-F
API numberWell no.Acreson the permit
42-227-399254311H482

SourceRailroad Commission drilling permits, Oct 3, 2026 (source 1, source 2).

Estimate your royalty

36 months, newest first

Ledger for GUITAR SOUTH 1-5-F
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3FlaredmcfWTI$/bblHenry Hub$/MMBtu
Jul 2026Pioneer Natural9199224,4863,4060$80.46$2.89
Jun 2026Pioneer Natural8378243,0162,38027$84.81$3.15
May 2026Pioneer Natural6496542,7582,1156$102.13$2.94
Apr 2026Pioneer Natural8909003,0602,344457$100.32$2.77
Mar 2026Pioneer Natural4244621,931802846$91.38$3.04
Feb 2026Pioneer Natural8157751,9751,7447$64.51$3.62
Jan 2026Pioneer Natural5956081,9291,69224$60.04$7.72
Dec 2025Pioneer Natural1,1401,1038677319$57.97$4.26
Nov 2025Pioneer Natural72474565654729$60.06$3.79
Oct 2025Pioneer Natural91388864650022$60.89$3.19
Sep 2025Pioneer Natural9919855434920$63.96$2.97
Aug 2025Pioneer Natural8348291,8841,51346$64.86$2.91
Jul 2025Pioneer Natural7267432,4991,911149$68.39$3.20
Jun 2025Pioneer Natural5615502,2741,78524$68.17$3.02
May 2025Pioneer Natural5655552,5221,84893$62.17$3.12
Apr 2025Pioneer Natural22926847333810$63.54$3.42
Mar 2025Pioneer Natural7557781,4411,007111$68.24$4.12
Feb 2025Pioneer Natural1,1041,1434,6673,217359$71.53$4.19
Jan 2025Pioneer Natural1,3911,3485,7694,182188$75.74$4.13
Dec 2024Pioneer Natural1,6091,5945,8184,558149$70.12$3.01
Nov 2024Pioneer Natural1,4171,4188,3446,213682$69.95$2.12
Oct 2024Pioneer Natural1,4031,3906,3544,513776$71.99$2.20
Sep 2024Pioneer Natural1,2031,1965,1893,553743$70.24$2.28
Aug 2024Pioneer Natural9339403,3331,944771$76.68$1.99
Jul 2024Pioneer Natural1,2771,2904,9364,007173$81.80$2.07
Jun 2024Pioneer Natural1,5511,5466,2925,201243$79.77$2.54
May 2024Pioneer Natural1,2741,2884,4783,439377$80.02$2.12
Apr 2024Pioneer Natural1,4081,4125,6264,378409$85.35$1.60
Mar 2024Pioneer Natural1,6401,6297,2076,07326$81.28$1.49
Feb 2024Pioneer Natural1,6061,6235,8664,88164$77.25$1.72
Jan 2024Pioneer Natural1,5741,5776,1404,423649$74.15$3.18
Dec 2023Pioneer Natural1,8631,8907,5466,3930$71.90$2.52
Nov 2023Pioneer Natural1,7361,6797,7176,389191$77.69$2.71
Oct 2023Pioneer Natural1,7071,7077,4876,125349$85.64$2.98
Sep 2023Pioneer Natural1,6441,6407,0116,02027$89.43$2.64
Aug 2023Pioneer Natural1,4701,4836,9225,712228$81.39$2.58

Flared above 3%

SourceTexas Railroad Commission Production Data Query, through Jul 2026. Prices: EIA, through Aug 2026. Updated Oct 2, 2026.

How to check your stub against this lease Checks stopped on this lease? See the likely reasons

Do your checks match this lease?

Nearby

Pioneer Natural Res. USA, Inc. in Howard County

All Pioneer Natural Res. USA, Inc. leases →

Spraberry (Trend Area) field

All leases in this field →

Leases within 10 km

Drilling permits within 10 km