Skip to content
Royalty Clerk

Texas oil lease

Producing

JOLLY JUMPER 48-21-28 2B10

Jolly Jumper 48-21-28 2B10 is an oil lease in Pecos County, Texas, operated by XTO Energy Inc. in the Hoefs T-K (Wolfcamp) field.

1 well

11,004bbl oil, last 12 months−1% vs prior year
RRC lease
08-55013

Is your check right?

Check my statement

Where it sits

This county

Pecos CountyPecosUptonCranePecos County
Pecos County
Gas, last 12 months
24,937 mcf
Oil in Jul 2026
703 bbl

Production by month

Oil output held steady over the last 12 months

  • Oil (bars)
  • Gas (line)
  • Last 12 months
Oil output held steady over the last 12 monthsMonthly oil production and gas for JOLLY JUMPER 48-21-28 2B10, Aug 2023 to Jul 2026. Oil output held steady over the last 12 months. 11,004 bbl in the 12 months through Jul 2026, against 11,133 bbl in the 12 months before.Last 12 months: 11,004 bblbbl per monthmcf per month005001,0001,0002,0001,5003,0002,0004,000Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output held steady over the last 12 monthsMonthly oil production and gas for JOLLY JUMPER 48-21-28 2B10, Aug 2023 to Jul 2026. Oil output held steady over the last 12 months. 11,004 bbl in the 12 months through Jul 2026, against 11,133 bbl in the 12 months before.Last 12 monthsbbl per monthmcf per month005001,0001,0002,0001,5003,0002,0004,000Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

Where the gas went

Over 99% of the gas went to a processing plant in the last 12 months

Flaring peaked at 36.8% of the gas in Jan 2024.

  • Processing plant (3)
  • Flared (4)
Over 99% of the gas went to a processing plant in the last 12 monthsShare of JOLLY JUMPER 48-21-28 2B10 gas by disposition code each month, Aug 2023 to Jul 2026. Over 99% of the gas went to a processing plant in the last 12 months. Flaring peaked at 36.8% of the gas in Jan 2024.Share of the lease’s gas by disposition code, per month0%50%100%Flared 36.8%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Over 99% of the gas went to a processing plant in the last 12 monthsShare of JOLLY JUMPER 48-21-28 2B10 gas by disposition code each month, Aug 2023 to Jul 2026. Over 99% of the gas went to a processing plant in the last 12 months. Flaring peaked at 36.8% of the gas in Jan 2024.Share of gas by disposition code0%50%100%Flared 36.8%Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

  • Processing plant (3)

    100% · 24,843 mcf

  • Flared (4)

    0.4% · 94 mcf

0.4% of the gas flared in the last 12 months. 8 months above 3%.

1 well on this lease

Wells on JOLLY JUMPER 48-21-28 2B10
API numberWell no.Status
42-371-40131310HActive

SourceTexas Railroad Commission Wellbore Query.

Buyers and gatherers

Companies named on the Form P-4, by product
CompanyProductRoleShare%FromUntil
Xto Energy Inc.OilGathers100Aug 22, 2020–
Brazos Midstream Operating, LLCCasinghead gasBuys100Nov 1, 2020–
Brazos Midstream Operating, LLCCasinghead gasGathers100Nov 1, 2020–
Xto Energy Inc.Casinghead gasGathers100Aug 22, 2020Nov 1, 2020
Xto Energy Inc.Casinghead gasBuys100Aug 22, 2020Nov 1, 2020

SourceRailroad Commission Form P-4 file, Sep 24, 2026 (source).

1,293.10 acres on the newest permit

  • Worth asking

    An allocation well is on this lease

    A well drilled across several tracts shares its production by an allocation formula, so the decimal is not always your acres over the unit acres. Ask the operator for the allocation formula and the tract factor for your land.

  • Worth asking

    A Rule 37 case is listed

    The RRC permit records list a Rule 37 case. This does not establish your royalty share. Ask for the permit and unit plat for your well.

Check your decimal on this lease
Permits for Jolly Jumper 48-21-28 2B10
API numberWell no.Acreson the permit
42-371-40131310H1,293.10

SourceRailroad Commission drilling permits, Oct 3, 2026 (source 1, source 2).

Estimate your royalty

36 months, newest first

Ledger for JOLLY JUMPER 48-21-28 2B10
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3FlaredmcfWTI$/bblHenry Hub$/MMBtu
Jul 20267037212,4172,39324$80.46$2.89
Jun 20261,2351,2212,5742,53440$84.81$3.15
May 20267697722,1502,1491$102.13$2.94
Apr 20268037972,6082,6071$100.32$2.77
Mar 20268108211,8461,8442$91.38$3.04
Feb 20268478472,1692,1663$64.51$3.62
Jan 20269949972,8622,8584$60.04$7.72
Dec 20251,0081,0032,5812,5756$57.97$4.26
Nov 20251,1621,1662,9092,9036$60.06$3.79
Oct 20251,6271,6171,8261,8224$60.89$3.19
Sep 20257687595675652$63.96$2.97
Aug 20252782844284271$64.86$2.91
Jul 20258268268618610$68.39$3.20
Jun 20257707698968942$68.17$3.02
May 20259319439529493$62.17$3.12
Apr 20251,0521,0461,5261,5206$63.54$3.42
Mar 20258338356746740$68.24$4.12
Feb 20258828756406400$71.53$4.19
Jan 20251,1951,19365650$75.74$4.13
Dec 20241,0461,05375873721$70.12$3.01
Nov 20241,0841,09396893632$69.95$2.12
Oct 202465864099698412$71.99$2.20
Sep 20246486551,0801,0791$70.24$2.28
Aug 20241,2081,20490287428$76.68$1.99
Jul 20249409413,1863,16521$81.80$2.07
Jun 20249149193,3583,208150$79.77$2.54
May 20241,1281,1333,2493,149100$80.02$2.12
Apr 20249539452,3892,36920$85.35$1.60
Mar 20241,0371,0302,0592,04316$81.28$1.49
Feb 20241,0951,0961,1091,1045$77.25$1.72
Jan 2024738734552349203$74.15$3.18
Dec 20231,3031,3011,0361,02412$71.90$2.52
Nov 20231,2121,21280877434$77.69$2.71
Oct 20231,2131,220923793130$85.64$2.98
Sep 20231,4941,4961,014740274$89.43$2.64
Aug 20231,4111,4001,0591,04316$81.39$2.58

Flared above 3%

SourceTexas Railroad Commission Production Data Query, through Jul 2026. Prices: EIA, through Aug 2026. Updated Oct 2, 2026.

How to check your stub against this lease Checks stopped on this lease? See the likely reasons

Do your checks match this lease?

Nearby

Leases within 10 km

Drilling permits within 10 km