Skip to content
Royalty Clerk

Texas oil lease

Producing

STATE STEWART 1-12 UJ

State Stewart 1-12 Uj is an oil lease in Pecos County, Texas, operated by Blue Arrow Operating, LLC in the Hoefs T-K (Wolfcamp) field.

1 well

85bbl oil, last 12 months
RRC lease
08-59136

Is your check right?

Check my statement

Where it sits

This county

Pecos CountyPecosUptonCranePecos County
Pecos County
Gas, last 12 months
1,767 mcf
Oil in Jul 2026
85 bbl

Checks stopped on this lease?

  • Operator

    Operator changed: Blue Arrow Operating, LLC took over from Diamondback E&P LLC in Jun 2026.

SourceRailroad Commission production, P-5 and P-4 records, data through Jul 2026.

See why checks stop on this lease
First check

Production started July 2026; the first check is due by about November 28, 2026 (estimate).

When is my first royalty check due?

Production by month

Oil output over the last 12 months

3 months were not reported.

  • Oil (bars)
  • Gas (line)
  • Last 12 months
Oil output over the last 12 monthsMonthly oil production and gas for STATE STEWART 1-12 UJ, Aug 2023 to Jul 2026. Oil output over the last 12 months. 85 bbl in the 12 months through Jul 2026, against 0 bbl in the 12 months before.Last 12 months: 85 bblbbl per monthmcf per month0025500501,000751,5001002,000Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output over the last 12 monthsMonthly oil production and gas for STATE STEWART 1-12 UJ, Aug 2023 to Jul 2026. Oil output over the last 12 months. 85 bbl in the 12 months through Jul 2026, against 0 bbl in the 12 months before.Last 12 monthsbbl per monthmcf per month0025500501,000751,5001002,000Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

Where the gas went

54% of the gas went to a processing plant in the only month reported

Flaring peaked at 40.9% of the gas in Jul 2026.

  • Processing plant (3)
  • Lease fuel (1)
  • Flared (4)
54% of the gas went to a processing plant in the only month reportedShare of STATE STEWART 1-12 UJ gas by disposition code each month, Aug 2023 to Jul 2026. 54% of the gas went to a processing plant in the only month reported. Flaring peaked at 40.9% of the gas in Jul 2026.Share of the lease’s gas by disposition code, per month0%50%100%Flared 40.9%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
54% of the gas went to a processing plant in the only month reportedShare of STATE STEWART 1-12 UJ gas by disposition code each month, Aug 2023 to Jul 2026. 54% of the gas went to a processing plant in the only month reported. Flaring peaked at 40.9% of the gas in Jul 2026.Share of gas by disposition code0%50%100%Flared 40.9%Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

  • Processing plant (3)

    54% · 957 mcf

  • Flared (4)

    41% · 722 mcf

  • Lease fuel (1)

    5.0% · 88 mcf

40.9% of the gas flared in the only month reported. One month above 3%.

Who has run this lease

The operator changed once, most recently in Jun 2026

Operators of this lease over timeDiamondback E&P LLC, Feb 2023 to Feb 2026; Blue Arrow Operating, LLC, Jun 2026 to Jul 2026202420252026Changed Jun 2026Diamondback E&P LLCFeb 2023 to Feb 2026Blue Arrow Operating, LLCJun 2026 to now
Operators of this lease over timeDiamondback E&P LLC, Feb 2023 to Feb 2026; Blue Arrow Operating, LLC, Jun 2026 to Jul 2026202420252026Changed Jun 2026Diamondback E&P LLCFeb 2023 to Feb 2026Blue Arrow Operating, LLCJun 2026 to now

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

1 well on this lease

Wells on STATE STEWART 1-12 UJ
API numberWell no.Status
42-371-403252BSShut-in

SourceTexas Railroad Commission Wellbore Query.

Buyers and gatherers

Companies named on the Form P-4, by product
CompanyProductRoleShare%FromUntil
Oryx Delaware Oil Transport LLCOilGathers100Mar 11, 2026–
Brazos Midstream Operating, LLCCasinghead gasBuys100Feb 2, 2023–
Brazos Midstream Operating, LLCCasinghead gasGathers100Feb 2, 2023–
Diamondback E&P LLCOilGathers50Feb 2, 2023Mar 11, 2026
Shell Trading (Us) CompanyOilGathers50Feb 2, 2023Mar 11, 2026

SourceRailroad Commission Form P-4 file, Sep 24, 2026 (source).

646.02 acres on the newest permit

  • Worth asking

    An allocation well is on this lease

    A well drilled across several tracts shares its production by an allocation formula, so the decimal is not always your acres over the unit acres. Ask the operator for the allocation formula and the tract factor for your land.

  • Worth asking

    A Rule 37 case is listed

    The RRC permit records list a Rule 37 case. This does not establish your royalty share. Ask for the permit and unit plat for your well.

Check your decimal on this lease
Permits for State Stewart 1-12 Uj
API numberWell no.Acreson the permit
42-371-403252BS646.02

SourceRailroad Commission drilling permits, Oct 3, 2026 (source 1, source 2).

Estimate your royalty

36 months, newest first

Ledger for STATE STEWART 1-12 UJ
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3FlaredmcfWTI$/bblHenry Hub$/MMBtu
Jul 2026Blue Arrow85821,767957722$80.46$2.89
Jun 2026Blue Arrow00000$84.81$3.15
May 2026No report–––––$102.13$2.94
Apr 2026No report–––––$100.32$2.77
Mar 2026No report–––––$91.38$3.04
Feb 2026Diamondback E&P00000$64.51$3.62
Jan 2026Diamondback E&P00000$60.04$7.72
Dec 2025Diamondback E&P00000$57.97$4.26
Nov 2025Diamondback E&P00000$60.06$3.79
Oct 2025Diamondback E&P00000$60.89$3.19
Sep 2025Diamondback E&P00000$63.96$2.97
Aug 2025Diamondback E&P00000$64.86$2.91
Jul 2025Diamondback E&P00000$68.39$3.20
Jun 2025Diamondback E&P00000$68.17$3.02
May 2025Diamondback E&P00000$62.17$3.12
Apr 2025Diamondback E&P00000$63.54$3.42
Mar 2025Diamondback E&P00000$68.24$4.12
Feb 2025Diamondback E&P00000$71.53$4.19
Jan 2025Diamondback E&P00000$75.74$4.13
Dec 2024Diamondback E&P00000$70.12$3.01
Nov 2024Diamondback E&P00000$69.95$2.12
Oct 2024Diamondback E&P00000$71.99$2.20
Sep 2024Diamondback E&P00000$70.24$2.28
Aug 2024Diamondback E&P00000$76.68$1.99
Jul 2024Diamondback E&P00000$81.80$2.07
Jun 2024Diamondback E&P00000$79.77$2.54
May 2024Diamondback E&P00000$80.02$2.12
Apr 2024Diamondback E&P00000$85.35$1.60
Mar 2024Diamondback E&P00000$81.28$1.49
Feb 2024Diamondback E&P00000$77.25$1.72
Jan 2024Diamondback E&P00000$74.15$3.18
Dec 2023Diamondback E&P00000$71.90$2.52
Nov 2023Diamondback E&P00000$77.69$2.71
Oct 2023Diamondback E&P00000$85.64$2.98
Sep 2023Diamondback E&P00000$89.43$2.64
Aug 2023Diamondback E&P00000$81.39$2.58

No report filed Flared above 3%

SourceTexas Railroad Commission Production Data Query, through Jul 2026. Prices: EIA, through Aug 2026. Updated Oct 2, 2026.

How to check your stub against this lease Checks stopped on this lease? See the likely reasons

Do your checks match this lease?

Nearby

Leases within 10 km

Drilling permits within 10 km