Skip to content
Royalty Clerk

Texas oil lease

Producing

MISTER ED 48-18-7 WA3

Mister Ed 48-18-7 Wa3 is an oil lease in Pecos County, Texas, operated by XTO Energy Inc. in the Hoefs T-K (Wolfcamp) field.

1 well

29,255bbl oil, last 12 months−34% vs prior year
RRC lease
08-57610

Is your check right?

Check my statement

Where it sits

This county

Pecos CountyPecosUptonCranePecos County
Pecos County
Gas, last 12 months
27,308 mcf
Oil in Jul 2026
2,115 bbl

Production by month

Oil output fell 34% over the last 12 months

  • Oil (bars)
  • Gas (line)
  • Last 12 months
Oil output fell 34% over the last 12 monthsMonthly oil production and gas for MISTER ED 48-18-7 WA3, Aug 2023 to Jul 2026. Oil output fell 34% over the last 12 months. 29,255 bbl in the 12 months through Jul 2026, against 44,510 bbl in the 12 months before.Last 12 months: 29,255 bblbbl per monthmcf per month002,0002,0004,0004,0006,0006,0008,0008,000Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output fell 34% over the last 12 monthsMonthly oil production and gas for MISTER ED 48-18-7 WA3, Aug 2023 to Jul 2026. Oil output fell 34% over the last 12 months. 29,255 bbl in the 12 months through Jul 2026, against 44,510 bbl in the 12 months before.Last 12 monthsbbl per monthmcf per month002,0002,0004,0004,0006,0006,0008,0008,000Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

Where the gas went

96% of the gas went to a processing plant in the last 12 months

Flaring peaked at 31.6% of the gas in Jan 2024.

  • Processing plant (3)
  • Lease fuel (1)
  • Flared (4)
96% of the gas went to a processing plant in the last 12 monthsShare of MISTER ED 48-18-7 WA3 gas by disposition code each month, Aug 2023 to Jul 2026. 96% of the gas went to a processing plant in the last 12 months. Flaring peaked at 31.6% of the gas in Jan 2024.Share of the lease’s gas by disposition code, per month0%50%100%Flared 31.6%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
96% of the gas went to a processing plant in the last 12 monthsShare of MISTER ED 48-18-7 WA3 gas by disposition code each month, Aug 2023 to Jul 2026. 96% of the gas went to a processing plant in the last 12 months. Flaring peaked at 31.6% of the gas in Jan 2024.Share of gas by disposition code0%50%100%Flared 31.6%Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

  • Processing plant (3)

    96% · 26,157 mcf

  • Lease fuel (1)

    2.8% · 770 mcf

  • Flared (4)

    1.4% · 381 mcf

1.4% of the gas flared in the last 12 months. 9 months above 3%.

1 well on this lease

Wells on MISTER ED 48-18-7 WA3
API numberWell no.Status
42-371-40340703HActive

SourceTexas Railroad Commission Wellbore Query.

Buyers and gatherers

Companies named on the Form P-4, by product
CompanyProductRoleShare%From
Xto Energy Inc.OilGathers100Jun 27, 2022
Brazos Midstream Operating, LLCCasinghead gasBuys100Jun 27, 2022
Brazos Midstream Operating, LLCCasinghead gasGathers100Jun 27, 2022

SourceRailroad Commission Form P-4 file, Sep 24, 2026 (source).

1,285 acres on the newest permit

  • Worth asking

    An allocation well is on this lease

    A well drilled across several tracts shares its production by an allocation formula, so the decimal is not always your acres over the unit acres. Ask the operator for the allocation formula and the tract factor for your land.

  • Worth asking

    A Rule 37 case is listed

    The RRC permit records list a Rule 37 case. This does not establish your royalty share. Ask for the permit and unit plat for your well.

Check your decimal on this lease
Permits for Mister Ed 48-18-7 Wa3
API numberWell no.Acreson the permit
42-371-40340703H1,285

SourceRailroad Commission drilling permits, Oct 3, 2026 (source 1, source 2).

Estimate your royalty

36 months, newest first

Ledger for MISTER ED 48-18-7 WA3
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3FlaredmcfWTI$/bblHenry Hub$/MMBtu
Jul 20262,1152,1111,7661,69410$80.46$2.89
Jun 20261,8781,8821,2051,11621$84.81$3.15
May 20262,4222,4122,0481,93217$102.13$2.94
Apr 20262,4252,4303,1913,07311$100.32$2.77
Mar 20262,4372,4392,3042,13065$91.38$3.04
Feb 20262,3432,3371,7591,72813$64.51$3.62
Jan 20262,5292,5331,9801,93716$60.04$7.72
Dec 20252,3072,3141,7451,70129$57.97$4.26
Nov 20252,4742,4732,4862,39852$60.06$3.79
Oct 20252,7732,7693,1753,05579$60.89$3.19
Sep 20252,4702,4712,7232,64454$63.96$2.97
Aug 20253,0823,1092,9262,74914$64.86$2.91
Jul 20253,0052,9953,8073,63618$68.39$3.20
Jun 20253,1053,1004,3384,22224$68.17$3.02
May 20253,4133,4064,6234,342128$62.17$3.12
Apr 20253,8743,8863,8783,69268$63.54$3.42
Mar 20252,7842,7633,3163,03677$68.24$4.12
Feb 20251,2201,2433,0763,0420$71.53$4.19
Jan 20253,2973,3123,9413,519268$75.74$4.13
Dec 20244,8284,8105,3175,2260$70.12$3.01
Nov 20245,4995,4885,1874,96429$69.95$2.12
Oct 20243,8993,9046,8026,442163$71.99$2.20
Sep 20244,5634,5877,0576,702132$70.24$2.28
Aug 20245,0235,0367,3107,004102$76.68$1.99
Jul 20246,3826,3436,6436,46437$81.80$2.07
Jun 20243,8573,8265,1414,664350$79.77$2.54
May 20242622782041907$80.02$2.12
Apr 20242,1792,19372366532$85.35$1.60
Mar 20242,8172,8081,9581,79563$81.28$1.49
Feb 20243,0343,0243,0782,9699$77.25$1.72
Jan 20241,3861,404800520253$74.15$3.18
Dec 20234,5314,5413,2943,18821$71.90$2.52
Nov 20234,4994,4853,9153,694142$77.69$2.71
Oct 20235,1505,1634,9324,148711$85.64$2.98
Sep 20234,0944,1004,2193,513618$89.43$2.64
Aug 20235,1215,0985,3035,15175$81.39$2.58

Flared above 3%

SourceTexas Railroad Commission Production Data Query, through Jul 2026. Prices: EIA, through Aug 2026. Updated Oct 2, 2026.

How to check your stub against this lease Checks stopped on this lease? See the likely reasons

Do your checks match this lease?

Nearby

Leases within 10 km

Drilling permits within 10 km