Skip to content
Royalty Clerk

Texas oil lease

Producing

SILVER 48-20-29 WB8

Silver 48-20-29 Wb8 is an oil lease in Pecos County, Texas, operated by XTO Energy Inc. in the Hoefs T-K (Wolfcamp) field.

1 well

28,304bbl oil, last 12 months−8% vs prior year
RRC lease
08-53810

Is your check right?

Check my statement

Where it sits

This county

Pecos CountyPecosUptonCranePecos County
Pecos County
Gas, last 12 months
70,401 mcf
Oil in Jul 2026
2,207 bbl

Production by month

Oil output fell 8% over the last 12 months

  • Oil (bars)
  • Gas (line)
  • Last 12 months
Oil output fell 8% over the last 12 monthsMonthly oil production and gas for SILVER 48-20-29 WB8, Aug 2023 to Jul 2026. Oil output fell 8% over the last 12 months. 28,304 bbl in the 12 months through Jul 2026, against 30,914 bbl in the 12 months before.Last 12 months: 28,304 bblbbl per monthmcf per month001,0005,0002,00010k3,00015k4,00020k5,00025kOct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output fell 8% over the last 12 monthsMonthly oil production and gas for SILVER 48-20-29 WB8, Aug 2023 to Jul 2026. Oil output fell 8% over the last 12 months. 28,304 bbl in the 12 months through Jul 2026, against 30,914 bbl in the 12 months before.Last 12 monthsbbl per monthmcf per month001,0005,0002,00010k3,00015k4,00020k5,00025kJan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

Where the gas went

99% of the gas went to a processing plant in the last 12 months

Flaring peaked at 38.5% of the gas in Nov 2023.

  • Processing plant (3)
  • Flared (4)
99% of the gas went to a processing plant in the last 12 monthsShare of SILVER 48-20-29 WB8 gas by disposition code each month, Aug 2023 to Jul 2026. 99% of the gas went to a processing plant in the last 12 months. Flaring peaked at 38.5% of the gas in Nov 2023.Share of the lease’s gas by disposition code, per month0%50%100%Flared 38.5%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
99% of the gas went to a processing plant in the last 12 monthsShare of SILVER 48-20-29 WB8 gas by disposition code each month, Aug 2023 to Jul 2026. 99% of the gas went to a processing plant in the last 12 months. Flaring peaked at 38.5% of the gas in Nov 2023.Share of gas by disposition code0%50%100%Flared 38.5%Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

  • Processing plant (3)

    99% · 69,784 mcf

  • Flared (4)

    0.9% · 617 mcf

0.9% of the gas flared in the last 12 months. 10 months above 3%.

1 well on this lease

Wells on SILVER 48-20-29 WB8
API numberWell no.Status
42-371-39972808HActive

SourceTexas Railroad Commission Wellbore Query.

Buyers and gatherers

Companies named on the Form P-4, by product
CompanyProductRoleShare%FromUntil
Xto Energy Inc.OilGathers100Jan 1, 2020–
Brazos Midstream Operating, LLCCasinghead gasBuys100Jan 1, 2020–
Xto Energy Inc.Casinghead gasGathers100Jan 13, 2020–
Brazos Midstream Operating, LLCCasinghead gasGathers100Jan 1, 2020Jan 13, 2020

SourceRailroad Commission Form P-4 file, Sep 24, 2026 (source).

1,293 acres on the newest permit

  • Worth asking

    An allocation well is on this lease

    A well drilled across several tracts shares its production by an allocation formula, so the decimal is not always your acres over the unit acres. Ask the operator for the allocation formula and the tract factor for your land.

  • Worth asking

    A Rule 37 case is listed

    The RRC permit records list a Rule 37 case. This does not establish your royalty share. Ask for the permit and unit plat for your well.

Check your decimal on this lease
Permits for Silver 48-20-29 Wb8
API numberWell no.Acreson the permit
42-371-39972808H1,293

SourceRailroad Commission drilling permits, Oct 3, 2026 (source 1, source 2).

Estimate your royalty

36 months, newest first

Ledger for SILVER 48-20-29 WB8
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3FlaredmcfWTI$/bblHenry Hub$/MMBtu
Jul 20262,2072,2101,2531,2476$80.46$2.89
Jun 20261,9992,0145,3415,217124$84.81$3.15
May 20262,4302,3807,2137,18528$102.13$2.94
Apr 20269889722,1592,1509$100.32$2.77
Mar 20264835498238194$91.38$3.04
Feb 20262,8032,7896,2796,19782$64.51$3.62
Jan 20262,9432,9597,1027,05646$60.04$7.72
Dec 20254,3374,3097,9507,843107$57.97$4.26
Nov 20251,5511,5653,5333,49043$60.06$3.79
Oct 20252,4312,4516,7546,67381$60.89$3.19
Sep 20253,0813,1209,4589,43424$63.96$2.97
Aug 20253,0513,03412,53612,47363$64.86$2.91
Jul 20253,1653,15811,46811,4635$68.39$3.20
Jun 20252,8102,8635,8805,713167$68.17$3.02
May 20253,0943,0025,5995,5918$62.17$3.12
Apr 20251,3871,4634,2804,26713$63.54$3.42
Mar 20253,5203,49013,26113,111150$68.24$4.12
Feb 20253,0353,0719,9789,850128$71.53$4.19
Jan 20254,7614,81311,85811,681177$75.74$4.13
Dec 20244,9664,92512,67112,183488$70.12$3.01
Nov 20243,8323,6809,4849,133351$69.95$2.12
Oct 202486891,9701,94228$71.99$2.20
Sep 20241341342,5302,49832$70.24$2.28
Aug 20241241272,2882,141147$76.68$1.99
Jul 2024257326000$81.80$2.07
Jun 20242,8362,8632,7002,69010$79.77$2.54
May 20242,3452,3183,2062,972234$80.02$2.12
Apr 20242,3042,3014,0163,99719$85.35$1.60
Mar 20242,4272,4114,1183,951167$81.28$1.49
Feb 20242,7562,7533,5533,304249$77.25$1.72
Jan 20242,3172,3102,3731,530843$74.15$3.18
Dec 20232,5162,5132,3992,36237$71.90$2.52
Nov 20232,1382,1351,9711,213758$77.69$2.71
Oct 20232,3082,3152,0001,514486$85.64$2.98
Sep 20231,7901,7991,8291,532297$89.43$2.64
Aug 20232,4052,3973,3653,32738$81.39$2.58

Flared above 3%

SourceTexas Railroad Commission Production Data Query, through Jul 2026. Prices: EIA, through Aug 2026. Updated Oct 2, 2026.

How to check your stub against this lease Checks stopped on this lease? See the likely reasons

Do your checks match this lease?

Nearby

Leases within 10 km

Drilling permits within 10 km