Skip to content
Royalty Clerk

Texas gas well

Producing

UL 18 BENNY WEST F

Ul 18 Benny West F is a gas well in Ward County, Texas, operated by Apache Corporation in the Phantom (Wolfcamp) field.

1 well

454,513mcf gas, last 12 months
RRC lease
08-301228

Is your check right?

Check my statement

Where it sits

This county

Ward CountyWardWinklerCraneLovingReevesEctorWard County
Ward County
Oil, last 12 months
166,927 bbl
Gas in Jul 2026
59,395 mcf

Production by month

Gas output since Apr 2025

  • Gas (bars)
  • Oil (line)
Gas output since Apr 2025Monthly gas production and oil for UL 18 BENNY WEST F, Apr 2025 to Jul 2026. Gas output since Apr 2025. Monthly average of 49,690 mcf in the latest 3 months, against 0 mcf in the first 3.mcf per monthbbl per month0020k5,00040k10k60k15k80k20kApr 25JulOctJan 26AprJul
Gas output since Apr 2025Monthly gas production and oil for UL 18 BENNY WEST F, Apr 2025 to Jul 2026. Gas output since Apr 2025. Monthly average of 49,690 mcf in the latest 3 months, against 0 mcf in the first 3.mcf per monthbbl per month0020k5,00040k10k60k15k80k20kJul 25Jan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

Where the gas went

99% of the gas went to a transmission line in the last 12 months

  • Transmission line (2)
  • Lease fuel (1)
  • Flared (4)
99% of the gas went to a transmission line in the last 12 monthsShare of UL 18 BENNY WEST F gas by disposition code each month, Apr 2025 to Jul 2026. 99% of the gas went to a transmission line in the last 12 months.Share of the lease’s gas by disposition code, per month0%50%100%Apr 25JulOctJan 26AprJul
99% of the gas went to a transmission line in the last 12 monthsShare of UL 18 BENNY WEST F gas by disposition code each month, Apr 2025 to Jul 2026. 99% of the gas went to a transmission line in the last 12 months.Share of gas by disposition code0%50%100%Jul 25Jan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

  • Transmission line (2)

    99% · 450,870 mcf

  • Flared (4)

    0.8% · 3,555 mcf

  • Lease fuel (1)

    0.0% · 88 mcf

0.8% of the gas flared in the last 12 months. No month above 3%.

1 well on this lease

Wells on UL 18 BENNY WEST F
API numberWell no.Status
42-475-388656HActive

SourceTexas Railroad Commission Wellbore Query.

Buyers and gatherers

Companies named on the Form P-4, by product
CompanyProductRoleShare%From
Energy Transfer CompanyCondensateGathers100Apr 28, 2025
Brazos Midstream Operating, LLCGas-well gasBuys50Apr 28, 2025
Scm Ops, LLCGas-well gasBuys50Apr 28, 2025
Brazos Midstream Operating, LLCGas-well gasGathers50Apr 28, 2025
Scm Ops, LLCGas-well gasGathers50Apr 28, 2025

SourceRailroad Commission Form P-4 file, Sep 24, 2026 (source).

1,211.14 acres on the newest permit

  • Worth asking

    An allocation well is on this lease

    A well drilled across several tracts shares its production by an allocation formula, so the decimal is not always your acres over the unit acres. Ask the operator for the allocation formula and the tract factor for your land.

Check your decimal on this lease
Permits for Ul 18 Benny West F
API numberWell no.Acreson the permit
42-475-388656H1,211.14

SourceRailroad Commission drilling permits, Oct 3, 2026 (source 1, source 2).

What APA Corporation told investors it received

Apache Corporation is linked to APA Corporation (APA).
Realized prices reported by APA Corporation
QuarterOil$ per bblFiling
Q2 2026$98.24SEC filing
Q1 2026$78.69SEC filing
Q4 2025$61.03SEC filing
Q3 2025$67.43SEC filing
Q2 2025$65.58SEC filing
Q1 2025$73.73SEC filing

SourceAPA Corporation quarterly reports, SEC EDGAR, company-wide averages before hedging.

Estimate your royalty

16 months, newest first

Ledger for UL 18 BENNY WEST F
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3FlaredmcfWTI$/bblHenry Hub$/MMBtu
Jul 202618,89418,88859,39559,173222$80.46$2.89
Jun 202613,81413,80845,52145,334187$84.81$3.15
May 202614,34014,34044,15543,979176$102.13$2.94
Apr 202613,57113,57739,15039,07377$100.32$2.77
Mar 202615,96616,01139,78539,641144$91.38$3.04
Feb 202616,41216,42736,95036,83891$64.51$3.62
Jan 202618,91718,88843,14342,293826$60.04$7.72
Dec 202512,73312,71734,98534,831139$57.97$4.26
Nov 20258,3358,36924,61324,291311$60.06$3.79
Oct 202510,66010,70629,11628,596503$60.89$3.19
Sep 202515,23115,26341,00340,617386$63.96$2.97
Aug 20258,0547,90616,69716,204493$64.86$2.91
Jul 202500000$68.39$3.20
Jun 202500000$68.17$3.02
May 202500000$62.17$3.12
Apr 202500000$63.54$3.42

SourceTexas Railroad Commission Production Data Query, through Jul 2026. Prices: EIA, through Aug 2026. Updated Oct 2, 2026.

How to check your stub against this lease Checks stopped on this lease? See the likely reasons

Do your checks match this lease?

Nearby

Leases within 10 km

Drilling permits within 10 km