Skip to content
Royalty Clerk

Texas oil lease

Producing

WARWINK UNIVERSITY 18-34-33

Warwink University 18-34-33 is an oil lease in Ward County, Texas, operated by Apache Corporation in the Phantom (Wolfcamp) field.

1 well

56,349bbl oil, last 12 months−19% vs prior year
RRC lease
08-59305

Is your check right?

Check my statement

Where it sits

This county

Ward CountyWardWinklerCraneLovingReevesEctorWard County
Ward County
Gas, last 12 months
118,833 mcf
Oil in Jul 2026
3,873 bbl

Production by month

Oil output fell 19% over the last 12 months

  • Oil (bars)
  • Gas (line)
  • Last 12 months
Oil output fell 19% over the last 12 monthsMonthly oil production and gas for WARWINK UNIVERSITY 18-34-33, Aug 2023 to Jul 2026. Oil output fell 19% over the last 12 months. 56,349 bbl in the 12 months through Jul 2026, against 69,944 bbl in the 12 months before.Last 12 months: 56,349 bblbbl per monthmcf per month005,00010k10k20k15k30k20k40k25k50kOct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output fell 19% over the last 12 monthsMonthly oil production and gas for WARWINK UNIVERSITY 18-34-33, Aug 2023 to Jul 2026. Oil output fell 19% over the last 12 months. 56,349 bbl in the 12 months through Jul 2026, against 69,944 bbl in the 12 months before.Last 12 monthsbbl per monthmcf per month005,00010k10k20k15k30k20k40k25k50kJan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

Where the gas went

Since May 2025 the lease's gas goes to a transmission line instead of lease fuel

Flaring peaked at 8.1% of the gas in Jun 2026.

  • Processing plant (3)
  • Transmission line (2)
  • Lease fuel (1)
  • Flared (4)
Since May 2025 the lease's gas goes to a transmission line instead of lease fuelShare of WARWINK UNIVERSITY 18-34-33 gas by disposition code each month, Aug 2023 to Jul 2026. Since May 2025 the lease's gas goes to a transmission line instead of lease fuel. Flaring peaked at 8.1% of the gas in Jun 2026.Share of the lease’s gas by disposition code, per month0%50%100%May 2025: fuel to lineFlared 8.1%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Since May 2025 the lease's gas goes to a transmission line instead of lease fuelShare of WARWINK UNIVERSITY 18-34-33 gas by disposition code each month, Aug 2023 to Jul 2026. Since May 2025 the lease's gas goes to a transmission line instead of lease fuel. Flaring peaked at 8.1% of the gas in Jun 2026.Share of gas by disposition code0%50%100%May 25: fuel to lineFlared 8.1%Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

  • Transmission line (2)

    98% · 116,009 mcf

  • Flared (4)

    1.2% · 1,465 mcf

  • Lease fuel (1)

    1.1% · 1,359 mcf

1.2% of the gas flared in the last 12 months. 2 months above 3%.

Who has run this lease

The operator changed once, most recently in Aug 2024

Operators of this lease over timeCallon Petroleum Operating Co, May 2023 to Jul 2024; Apache Corporation, Aug 2024 to Jul 2026202420252026Changed Aug 2024Callon Petroleum Operating CoMay 2023 to Jul 2024Apache CorporationAug 2024 to now
Operators of this lease over timeCallon Petroleum Operating Co, May 2023 to Jul 2024; Apache Corporation, Aug 2024 to Jul 2026202420252026Changed Aug 2024Callon Petroleum Operating CoMay 2023 to Jul 2024Apache CorporationAug 2024 to now

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

1 well on this lease

Wells on WARWINK UNIVERSITY 18-34-33
API numberWell no.Status
42-475-3835413SBActive

SourceTexas Railroad Commission Wellbore Query.

Buyers and gatherers

Companies named on the Form P-4, by product
CompanyProductRoleShare%FromUntil
Energy Transfer CompanyOilGathers80Oct 1, 2023–
Energy Transfer Marketing & TermOilGathers10Oct 1, 2023–
Rio Energy International, Inc.OilGathers10Oct 1, 2023–
Targa Midstream Services LLCCasinghead gasBuys100May 20, 2023–
Targa Midstream Services LLCCasinghead gasGathers100May 20, 2023–
Etp Crude LLCOilGathers80May 20, 2023Oct 1, 2023
Rio Energy International, Inc.OilGathers20May 20, 2023Oct 1, 2023

SourceRailroad Commission Form P-4 file, Sep 24, 2026 (source).

641.67 acres on the newest permit

  • Worth asking

    An allocation well is on this lease

    A well drilled across several tracts shares its production by an allocation formula, so the decimal is not always your acres over the unit acres. Ask the operator for the allocation formula and the tract factor for your land.

  • Worth asking

    A Rule 37 case is listed

    The RRC permit records list a Rule 37 case. This does not establish your royalty share. Ask for the permit and unit plat for your well.

Check your decimal on this lease
Permits for Warwink University 18-34-33
API numberWell no.Acreson the permit
42-475-3835413SB641.67

SourceRailroad Commission drilling permits, Oct 3, 2026 (source 1, source 2).

What APA Corporation told investors it received

Apache Corporation is linked to APA Corporation (APA).
Realized prices reported by APA Corporation
QuarterOil$ per bblFiling
Q2 2026$98.24SEC filing
Q1 2026$78.69SEC filing
Q4 2025$61.03SEC filing
Q3 2025$67.43SEC filing
Q2 2025$65.58SEC filing
Q1 2025$73.73SEC filing

SourceAPA Corporation quarterly reports, SEC EDGAR, company-wide averages before hedging.

Estimate your royalty

36 months, newest first

Ledger for WARWINK UNIVERSITY 18-34-33
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3FlaredmcfWTI$/bblHenry Hub$/MMBtu
Jul 2026Apache Corporation3,8733,8487,6867,192494$80.46$2.89
Jun 2026Apache Corporation4,0734,0658,6057,907698$84.81$3.15
May 2026Apache Corporation3,9443,9058,4928,378114$102.13$2.94
Apr 2026Apache Corporation4,2064,1509,0019,0010$100.32$2.77
Mar 2026Apache Corporation4,3864,4539,7539,7530$91.38$3.04
Feb 2026Apache Corporation4,3384,5119,0848,8320$64.51$3.62
Jan 2026Apache Corporation4,4294,5548,2137,9340$60.04$7.72
Dec 2025Apache Corporation4,6874,69610,2679,829159$57.97$4.26
Nov 2025Apache Corporation5,0104,94810,35310,0830$60.06$3.79
Oct 2025Apache Corporation5,0124,95910,49010,2110$60.89$3.19
Sep 2025Apache Corporation5,5415,99312,71712,7170$63.96$2.97
Aug 2025Apache Corporation6,8506,23914,17214,1720$64.86$2.91
Jul 2025Apache Corporation6,3636,40510,75510,7550$68.39$3.20
Jun 2025Apache Corporation4,3114,4908,5818,5810$68.17$3.02
May 2025Apache Corporation6,1055,66110,98610,9860$62.17$3.12
Apr 2025Apache Corporation4,0614,5025,2238710$63.54$3.42
Mar 2025Apache Corporation5,7646,0764,66200$68.24$4.12
Feb 2025Apache Corporation5,6605,5433,6523,4000$71.53$4.19
Jan 2025Apache Corporation6,6976,77813,71313,4340$75.74$4.13
Dec 2024Apache Corporation6,8516,41313,65913,3800$70.12$3.01
Nov 2024Apache Corporation6,9287,20412,76212,4920$69.95$2.12
Oct 2024Apache Corporation8,9649,05314,29314,0140$71.99$2.20
Sep 2024Apache Corporation3,9593,2824,7184,7180$70.24$2.28
Aug 2024Apache Corporation4,2814,5436,3386,3380$76.68$1.99
Jul 2024Callon Petroleum6,3866,32810,20810,2080$81.80$2.07
Jun 2024Callon Petroleum7,0487,08411,51411,5140$79.77$2.54
May 2024Callon Petroleum7,7758,25113,77313,7730$80.02$2.12
Apr 2024Callon Petroleum8,6078,06015,83915,722117$85.35$1.60
Mar 2024Callon Petroleum9,0229,12015,67015,6700$81.28$1.49
Feb 2024Callon Petroleum9,0089,34114,52814,5280$77.25$1.72
Jan 2024Callon Petroleum11,36611,57221,49521,44946$74.15$3.18
Dec 2023Callon Petroleum10,3229,91416,49916,40297$71.90$2.52
Nov 2023Callon Petroleum13,76213,70626,16225,909101$77.69$2.71
Oct 2023Callon Petroleum16,63716,73730,51530,145109$85.64$2.98
Sep 2023Callon Petroleum18,58818,74329,48729,22316$89.43$2.64
Aug 2023Callon Petroleum20,43419,81929,99429,7400$81.39$2.58

Flared above 3%

SourceTexas Railroad Commission Production Data Query, through Jul 2026. Prices: EIA, through Aug 2026. Updated Oct 2, 2026.

How to check your stub against this lease Checks stopped on this lease? See the likely reasons

Do your checks match this lease?

Nearby

Apache Corporation in Ward County

All Apache Corporation leases →

Leases within 10 km

Drilling permits within 10 km