Skip to content

Jones County, Texas

Jones County drilling permits: what the state recorded

  • 10drilling permits
  • 3completions
  • 1first-production report
  • in the last twelve months

Wells by coordinates

Oil wells and drilling locations in Jones County

Map of Jones County, Texas, with 1,513 oil and gas wells and 21 recent drilling locations as dots.
  • Drilling locations21Permits issued in the last two years
  • Producing wells641On a lease reporting production now
  • Not producing482Shut in, inactive or no lease on record
  • Plugged390The state's wellbore record says plugged

Sources: Railroad Commission of Texas well layers and permit files, US Census Bureau county outline, town points from GeoNames (CC BY 4.0), base map from USGS The National Map. A dot is a surface location; a horizontal well runs a mile or more from it.

See the whole Texas well map

1,513 wells with a location on the state's map and 21 drilling locations permitted in the last 24 months, each where the Railroad Commission puts it.

10 drilling permits, 3 completions and 1 first-production report in the last twelve months. Follow the county or one abstract and get one email a week when something new is recorded.

A permit is not a well.

Wells near each town in Jones County

Wells within 10 miles of each town, on either side of the county line.

Use this map on your site

You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.

Download the picture (WebP)
<a href="https://royaltyclerk.com/texas-well-watch/jones-county-tx"><img src="https://royaltyclerk.com/maps/county-wells/jones-county-tx.svg" alt="Map of Jones County, Texas, with 1,513 oil and gas wells and 21 recent drilling locations as dots." width="1000" height="1275" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas-well-watch/jones-county-tx">Jones County, Texas oil and gas wells</a> by Royalty Clerk, from Railroad Commission of Texas records</p>

The last twelve months

Month by month in Jones County

Drilling events by month in Jones County
MonthPermitsCompletionsFirst production
Sep 2026100
Aug 2026300
May 2026210
Apr 2026300
Jan 2026011
Dec 2025100
Nov 2025010

Counted from November 15, 2025 to September 14, 2026, so the first and last months are partial. Source: Railroad Commission of Texas data sets.

Free, no sign-in

The newest drilling permits in Jones County

The 44 newest W-1 permits the Railroad Commission issued here, through September 14, 2026.
The newest drilling permits issued in Jones County
IssuedLease and well
2026-09-14ABILENE 2.0 SE CR 306 & FM 1982 01new drill · verticalEnergy Transfer CompanyAPI 42-253-35754 · permit 091850332.53276, -99.65644420 ft
2026-08-12BAUCUM 3new drill · verticalStar Production, Inc.API 42-253-35753 · permit 091773932.72984, -99.74756drilling began 2026-08-17 · 3,500 ft
2026-08-07PITTARD 1new drill · verticalDelta Oil & Gas Ltd.API 42-253-35752 · permit 091762632.74317, -99.92898drilling began 2026-08-25 · 5,000 ft
2026-08-05HF SINCLAIR T015MPnew drill · verticalWbi Energy Midstream, LLCAPI 42-253-35751 · permit 091602532.75042, -99.67406drilling began 2026-08-24 · 350 ft
2026-05-27HALL 40 1new drill · verticalStar Production, Inc.API 42-253-35750 · permit 091581232.74155, -99.74107drilling began 2026-07-21 · 3,500 ft
2026-05-27BAUCUM 2new drill · verticalStar Production, Inc.API 42-253-35749 · permit 091579632.73122, -99.74757drilling began 2026-08-03 · 3,750 ft
2026-04-21TP #1.75 1new drill · verticalEnergy Transfer CompanyAPI 42-253-35748 · permit 091472532.70724, -99.81813400 ft
2026-04-20TP #9 1new drill · verticalEnergy Transfer CompanyAPI 42-253-35746 · permit 091454732.95266, -99.84142400 ft
2026-04-20TP #9.75 1new drill · verticalEnergy Transfer CompanyAPI 42-253-35747 · permit 091454332.94101, -99.84060400 ft
2025-12-11SWANN, W.D. 10new drill · verticalSojourner Drilling CorporationAPI 42-253-35745 · permit 091209932.57176, -100.13023drilling began 2026-03-25 · 5,000 ft
2025-09-30JAY (CANYON LIME) UNIT 212new drill · verticalSojourner Drilling CorporationAPI 42-253-35744 · permit 091076932.56030, -100.13362drilling began 2025-10-25 · 4,700 ft
2025-08-21OLIVER SWENSON 1recompletion · verticalIcs Energy LLCAPI 42-253-35726 · permit 090973132.89877, -99.69314drilling began 2024-04-11 · 5,500 ft
2025-08-11BIRDIE UNIT 1new drill · verticalSojourner Drilling CorporationAPI 42-253-35743 · permit 090977732.59567, -100.08838drilling began 2025-08-14 · 3,500 ft
2025-08-06TNT 2new drill · verticalHadaway Consult and Engineer,llcAPI 42-253-35742 · permit 090972432.74295, -100.128176,500 ft
2025-04-21MANLY 1new drill · verticalGeosurveys, Inc.API 42-253-35741 · permit 090746032.57496, -99.61648drilling began 2025-05-16 · 2,000 ft
2025-04-14U-104 1new drill · verticalAtmos Energy Corp., Mid-Tex Div.API 42-253-35740 · permit 090735232.91513, -100.02127drilling began 2026-05-29 · 325 ft
2025-04-11BAUCUM 1new drill · verticalStar Production, Inc.API 42-253-35739 · permit 090731532.73067, -99.74479drilling began 2025-06-17 · 3,500 ft
2025-04-10STEELE 1new drill · verticalStar Production, Inc.API 42-253-35738 · permit 090731032.77532, -99.70299drilling began 2025-06-25 · 3,500 ft
2025-02-13WHITE 1new drill · verticalIcs Energy LLCAPI 42-253-35737 · permit 090591132.77467, -100.03194drilling began 2025-02-25 · 3,900 ft
2025-01-27BROWN 1new drill · verticalIcs Energy LLCAPI 42-253-35736 · permit 090544332.79646, -100.03498drilling began 2025-01-28 · 3,700 ft
2024-12-06OLIVER SWENSON 3new drill · verticalIcs Energy LLCAPI 42-253-35735 · permit 090445032.90112, -99.69176drilling began 2024-12-23 · 5,200 ft
2024-10-25OLIVER SWENSON 2new drill · verticalIcs Energy LLCAPI 42-253-35734 · permit 090355932.89856, -99.68918drilling began 2024-11-13 · 5,400 ft
2024-10-25HUDSPETH, W.R. 'D' 6new drill · verticalSojourner Drilling CorporationAPI 42-253-35733 · permit 090355332.61559, -100.14432drilling began 2025-03-15 · 5,500 ft
2024-10-25HUDSPETH, W.R. 'D' 5new drill · verticalSojourner Drilling CorporationAPI 42-253-35732 · permit 090355232.61766, -100.14252drilling began 2025-02-26 · 5,500 ft
2024-09-19LYTLE 1new drill · verticalProduction Operators of TX, LLCAPI 42-253-35731 · permit 090274132.75677, -99.97907drilling began 2024-09-30 · 3,500 ft
2024-07-03HEP14 1new drill · verticalHolly Energy Partners-Op, L.P.API 42-253-35730 · permit 090082832.60173, -99.76206350 ft
2024-06-27DUSTY FARMER 1recompletion · verticalSojourner Drilling CorporationAPI 42-253-35687 · permit 090072932.56498, -100.094165,000 ft
2024-06-03IRVIN FEE 1new drill · verticalSojourner Drilling CorporationAPI 42-253-35729 · permit 090009432.61186, -100.07135drilling began 2024-06-07 · 3,000 ft
2024-05-08LEAVITT 2new drill · verticalIcs Energy LLCAPI 42-253-35728 · permit 089959032.85660, -99.75054drilling began 2024-07-12 · 2,300 ft
2024-04-15ATE565 1new drill · verticalAtmos Pipeline - TexasAPI 42-253-35727 · permit 089878932.94264, -99.82693450 ft
2024-04-05OLIVER SWENSON 1new drill · verticalIcs Energy LLCAPI 42-253-35726 · permit 089859732.89877, -99.69314drilling began 2024-04-11 · 5,500 ft
2024-04-02BAUCUM 1Anew drill · verticalS.b. Street Operating, Inc.API 42-253-35725 · permit 0898456drilling began 2024-07-16 · 3,999 ft
2024-03-18LEAVITT 1new drill · verticalIcs Energy LLCAPI 42-253-35724 · permit 089821632.85528, -99.74996drilling began 2024-03-20 · 2,500 ft
2024-03-18HP 1new drill · verticalHadaway Consult and Engineer,llcAPI 42-253-35723 · permit 089792232.74945, -100.13199drilling began 2025-03-10 · 6,500 ft
2024-03-12IRVIN FEE 1re-entry · verticalSojourner Drilling CorporationAPI 42-253-00049 · permit 089800632.61178, -100.071323,000 ft
2024-03-08BAGLEY 3new drill · verticalJQL Energy, LLCAPI 42-253-35722 · permit 089791932.84338, -99.72605drilling began 2024-04-30 · 2,999 ft
2024-02-13TNT 1new drill · verticalHadaway Consult and Engineer,llcAPI 42-253-35721 · permit 089725032.74728, -100.12508drilling began 2024-03-09 · 6,500 ft
2024-01-25ECT208 1new drill · verticalSunoco Pipeline L.P.API 42-253-35720 · permit 089671132.57348, -99.90632400 ft
2024-01-24BRAUN 1new drill · verticalM. E. Operating & Services, Inc.API 42-253-35719 · permit 089666232.70005, -99.81720drilling began 2024-06-23 · 3,500 ft
2024-01-19OMAN ACSELL 1new drill · verticalIcs Energy LLCAPI 42-253-35718 · permit 089662432.89870, -99.68104drilling began 2024-01-31 · 5,500 ft
2023-12-04MCCASLIN 1new drill · verticalStar Production, Inc.API 42-253-35717 · permit 089566332.85506, -99.78522drilling began 2023-12-12 · 5,700 ft
2023-12-04RISLEY 'B' 7new drill · verticalNBX Energy, LLCAPI 42-253-35632 · permit 089550932.95759, -99.98978drilling began 2023-12-11 · 6,000 ft
2023-10-03MUELLER 1new drill · verticalDelta Oil & Gas Ltd.API 42-253-35716 · permit 089427632.92994, -99.98734drilling began 2024-03-02 · 4,000 ft
2014-09-12DAVIS 4new drill · verticalIcs Energy LLCAPI 42-253-35414 · permit 079448432.87048, -99.67772drilling began 2015-01-27 · 2,900 ft

A permit is permission to drill, not a well. Source: Railroad Commission of Texas drilling permit files.

Email me the new ones

Year by year

Drilling permits issued in Jones County, by year

Drilling permits issued in Jones County by year
YearPermits issued
2026 so far9
202511
202420
20233
20141

Counted from the permit files we hold, which start in 2014; that first year may be partial. Source: Railroad Commission of Texas drilling permit files.

The latest

The most recent records

The latest drilling records in Jones County
DateWhat, who and where
2026-09-14Permit issued: Energy Transfer CompanyABILENE 2.0 SE CR 306 & FM 1982 · A-1035 · permit 0918503
2026-08-12Permit issued: Star Production, Inc.BAUCUM · A-1517 · permit 0917739
2026-08-07Permit issued: Delta Oil & Gas Ltd.PITTARD · A-353 · permit 0917626
2026-08-05Permit issued: Wbi Energy Midstream, LLCHF SINCLAIR · A-508 · permit 0916025
2026-05-27Permit issued: Star Production, Inc.HALL 40 · A-1900 · permit 0915812
2026-05-27Permit issued: Star Production, Inc.BAUCUM · A-1517 · permit 0915796
2026-05-17Completed: Sojourner Drilling CorporationSWANN, W.D. · A-268 · permit 0912099
2026-04-21Permit issued: Energy Transfer CompanyTP #1.75 · A-360 · permit 0914725
2026-04-20Permit issued: Energy Transfer CompanyTP #9.75 · A-33 · permit 0914543
2026-04-20Permit issued: Energy Transfer CompanyTP #9 · A-1914 · permit 0914547
2026-01-28Completed: Star Production, Inc.BAUCUM · A-1517 · permit 0907315
2026-01-01First production: Star Production, Inc.Baucum · A-1517 · permit 0907315
2025-12-11Permit issued: Sojourner Drilling CorporationSWANN, W.D. · A-268 · permit 0912099
2025-11-21Completed: Sojourner Drilling CorporationJAY (CANYON LIME) UNIT · A-268 · permit 0910769

Follow it

Watch Jones County, or one abstract

Pick the whole county or search your abstract. One email a week at most.

What do you want to follow?

Where the land is. Your deed or lease names it.

For example A-1119, or Bush, or T&P 38. Your deed or the tax bill has it.

All of Jones County: leases, operators and production

FAQ

Questions people ask

How many wells were permitted in Jones County in the last year?

The Railroad Commission issued 10 drilling permits in Jones County in the twelve months to September 14, 2026, and recorded 3 completions and 1 first-production report. A permit is permission to drill, not a well.

How do I get an alert when a permit is issued near my land in Jones County?

Choose your abstract on this page, or the whole county, and sign in. You get one email a week, only when something new is recorded after you sign up. The alert says whether an event is on an interest in your Mineral File, on a place you follow, or only nearby.

When is my first royalty check due after a new well?

Natural Resources Code section 91.402(a) says on or before 120 days after the end of the month of first sale of production from the well. The state's first-production month is the closest public marker, so the date on this page is the earliest, not a certainty.

Work out the first-check date

Got a new well on your land?

The first check is due within 120 days after the end of the month of first sale.