Navarro County, Texas
Navarro County drilling permits: what the state recorded
- 5drilling permits
- 0completions
- 0first-production reports
- in the last twelve months
Wells by coordinates
Oil wells and drilling locations in Navarro County
- Drilling locations15Permits issued in the last two years
- Producing wells533On a lease reporting production now
- Not producing293Shut in, inactive or no lease on record
- Plugged839The state's wellbore record says plugged
Sources: Railroad Commission of Texas well layers and permit files, US Census Bureau county outline, town points from GeoNames (CC BY 4.0), base map from USGS The National Map. A dot is a surface location; a horizontal well runs a mile or more from it.
1,665 wells with a location on the state's map and 15 drilling locations permitted in the last 24 months, each where the Railroad Commission puts it.
A permit is not a well.
Wells near each town in Navarro County
Wells within 10 miles of each town, on either side of the county line.
Use this map on your site
You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.
<a href="https://royaltyclerk.com/texas-well-watch/navarro-county-tx"><img src="https://royaltyclerk.com/maps/county-wells/navarro-county-tx.svg" alt="Map of Navarro County, Texas, with 1,665 oil and gas wells and 15 recent drilling locations as dots." width="1000" height="1033" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas-well-watch/navarro-county-tx">Navarro County, Texas oil and gas wells</a> by Royalty Clerk, from Railroad Commission of Texas records</p>The last twelve months
Month by month in Navarro County
| Month | Permits | Completions | First production |
|---|---|---|---|
| Oct 2026 | 3 | 0 | 0 |
| Sep 2026 | 1 | 0 | 0 |
| Jun 2026 | 1 | 0 | 0 |
Counted from November 15, 2025 to October 30, 2026, so the first and last months are partial. Source: Railroad Commission of Texas data sets.
Free, no sign-in
The newest drilling permits in Navarro County
| Issued | Lease and well | Operator | Drilling began | Depth, ft | API number | Coordinates | Permit |
|---|---|---|---|---|---|---|---|
| 2026-10-30 | LEWIS-SIMPSON RANCH 7re-entry · verticalDomestic Drilling & Operating LLAPI 42-349-34578 · permit 091978832.23673, -96.257893,500 ft | Domestic Drilling & Operating LL | |||||
| 2026-10-30 | LEWIS-SIMPSON RANCH 6re-entry · verticalDomestic Drilling & Operating LLAPI 42-349-34355 · permit 091978932.23885, -96.253753,600 ft | Domestic Drilling & Operating LL | |||||
| 2026-10-29 | CASTON 2re-entry · verticalMud Creek Operating, LLCAPI 42-349-33777 · permit 091954132.01934, -96.193114,193 ft | Mud Creek Operating, LLC | |||||
| 2026-09-02 | ATMOS NAVARRO V-61 1new drill · verticalAtmos Pipeline - TexasAPI 42-349-35069 · permit 091792231.97195, -96.64356550 ft | Atmos Pipeline - Texas | |||||
| 2026-06-23 | RLS08 JC NOLAN 12'' 1new drill · verticalEnergy Transfer CompanyAPI 42-349-35068 · permit 091653231.98693, -96.35439400 ft | Energy Transfer Company | |||||
| 2025-10-08 | ATE506 01new drill · verticalPipeline Integrity Resources, inAPI 42-349-35066 · permit 090903432.01275, -96.65878550 ft | Pipeline Integrity Resources, in | |||||
| 2025-07-29 | EAST HOUSTON TO CORSICANA 5new drill · verticalMagellan Crude Oil PL Co, L.P.API 42-349-35057 · permit 090383931.99463, -96.44953350 ft | Magellan Crude Oil PL Co, L.P. | |||||
| 2025-05-22 | MP 233.525 233new drill · verticalEnterprise Products Texas Op LLCAPI 42-349-35065 · permit 090810232.12775, -96.36719400 ft | Enterprise Products Texas Op LLC | |||||
| 2025-05-20 | FLEMING 3new drill · verticalWalker Operating CompanyAPI 42-349-35064 · permit 090807032.01175, -96.144104,500 ft | Walker Operating Company | |||||
| 2025-05-20 | FLEMING 2new drill · verticalWalker Operating CompanyAPI 42-349-35063 · permit 090806932.00961, -96.141264,500 ft | Walker Operating Company | |||||
| 2025-03-25 | BECK 1Anew drill · verticalWalker Operating CompanyAPI 42-349-35062 · permit 090686532.12301, -96.146453,700 ft | Walker Operating Company | |||||
| 2025-03-24 | BECK 1new drill · verticalWalker Operating CompanyAPI 42-349-35061 · permit 090686432.12290, -96.146584,500 ft | Walker Operating Company | |||||
| 2025-02-10 | FLEMING 1new drill · verticalWalker Operating CompanyAPI 42-349-35060 · permit 090574632.00953, -96.140994,500 ft | Walker Operating Company | |||||
| 2025-01-27 | TRINITY 2new drill · verticalWalker Operating CompanyAPI 42-349-35059 · permit 090546132.13199, -96.126354,500 ft | Walker Operating Company | |||||
| 2025-01-27 | TRINITY 1new drill · verticalWalker Operating CompanyAPI 42-349-35058 · permit 090546032.13052, -96.127964,500 ft | Walker Operating Company | |||||
| 2024-11-01 | SEAW400C-114 1new drill · verticalPhillips 66 Pipeline LLCAPI 42-349-35056 · permit 090367731.99575, -96.71965300 ft | Phillips 66 Pipeline LLC | |||||
| 2024-05-16 | M20-2 CP UNIT 1new drill · verticalAtmos Pipeline - TexasAPI 42-349-35055 · permit 089963631.88291, -96.41207440 ft | Atmos Pipeline - Texas | |||||
| 2024-01-18 | WW-7.61 CR 2300 SANDLIN 1new drill · verticalOneok Westex Transmission,l.l.c.API 42-349-35054 · permit 089652431.84689, -96.50069250 ft | Oneok Westex Transmission,l.l.c. |
A permit is permission to drill, not a well. Source: Railroad Commission of Texas drilling permit files.
Year by year
Drilling permits issued in Navarro County, by year
| Year | Permits issued |
|---|---|
| 2026 so far | 5 |
| 2025 | 10 |
| 2024 | 3 |
Counted from the permit files we hold, which start in 2024; that first year may be partial. Source: Railroad Commission of Texas drilling permit files.
The latest
The most recent records
| Date | What, who and where |
|---|---|
| 2026-10-30 | Permit issued: Domestic Drilling & Operating LLLEWIS-SIMPSON RANCH · A-328 · permit 0919789 |
| 2026-10-30 | Permit issued: Domestic Drilling & Operating LLLEWIS-SIMPSON RANCH · A-784 · permit 0919788 |
| 2026-10-29 | Permit issued: Mud Creek Operating, LLCCASTON · A-633 · permit 0919541 |
| 2026-09-02 | Permit issued: Atmos Pipeline - TexasATMOS NAVARRO V-61 · A-43 · permit 0917922 |
| 2026-06-23 | Permit issued: Energy Transfer CompanyRLS08 JC NOLAN 12'' · A-671 · permit 0916532 |
Follow it
Watch Navarro County, or one abstract
What do you want to follow?
Where the land is. Your deed or lease names it.
For example A-1119, or Bush, or T&P 38. Your deed or the tax bill has it.
Other counties
Drilling activity in other counties
Related
Related
- ToolTexas well watchPermit, completion, first production and when the first check is due.
- ToolIs this buyout offer fair?The offer as months of your income, what the acres mean, and the questions to ask.
- ToolIs this lease offer good?Bonus and royalty against the county, and a scan of the lease's clauses.
- Texas dataTexas operator changesWho took over whose leases in the last 24 months.
- ToolLate payment interestDeadlines and the interest a late payment earns.
- Texas dataTexas oil and gas atlas254 counties, every lease, operator and field.
FAQ
Questions people ask
How many wells were permitted in Navarro County in the last year?
The Railroad Commission issued 5 drilling permits in Navarro County in the twelve months to October 30, 2026, and recorded 0 completions and 0 first-production reports. A permit is permission to drill, not a well.
How do I get an alert when a permit is issued near my land in Navarro County?
Choose your abstract on this page, or the whole county, and sign in. You get one email a week, only when something new is recorded after you sign up. The alert says whether an event is on an interest in your Mineral File, on a place you follow, or only nearby.
When is my first royalty check due after a new well?
Natural Resources Code section 91.402(a) says on or before 120 days after the end of the month of first sale of production from the well. The state's first-production month is the closest public marker, so the date on this page is the earliest, not a certainty.
Got a new well on your land?
The first check is due within 120 days after the end of the month of first sale.
Sources
Primary sources, opened on 29 September 2026. Statute text is the current version on statutes.capitol.texas.gov.