Skip to content

Texas field · RRC field 05166888 · District 08

Bakke (Wolfcamp)

4 producing leases run by 1 operator in 1 Texas county. The field reported 124,129 barrels of oil and 165,787 mcf of gas in the 12 months through Jul 2026.

Field dossier · 1 county

124,129bbl oil, last 12 months+54% vs prior year
Producing leases
4of 6 on record
Operators
1
Counties
1
Biggest operator
Hilcorp Energy Company

Own minerals in this field?

Upload a royalty check stub or a phone photo. We compare each month with the state numbers for your lease and tell you what to ask your operator.

Where the field sits

This county

Andrews County: 4 producing leasesAndrewsMartinGainesDawsonAndrews County
1 countyClick a county to open it
Gas, last 12 months
165,787 mcf
RRC field no.
05166888
RRC district
08
Data through
Jul 2026

Production

Five years of output in Bakke (Wolfcamp)

Monthly totals across the leases the Railroad Commission assigns to this field.

Oil output in the Bakke (Wolfcamp) field rose 54% over the last 12 months

124k bbl in the 12 months through Jul 2026, against 80.5k bbl in the 12 months before. Peak month: Dec 2021, 15.5k bbl.

Oil output in the Bakke (Wolfcamp) field rose 54% over the last 12 months124k bbl in the 12 months through Jul 2026, against 80.5k bbl in the 12 months before. Peak month: Dec 2021, 15.5k bbl.Oil, bbl per month05,00010k15k20kPeak 15.5k (Dec 21)10.6k20222023202420252026
Oil output in the Bakke (Wolfcamp) field rose 54% over the last 12 months124k bbl in the 12 months through Jul 2026, against 80.5k bbl in the 12 months before. Peak month: Dec 2021, 15.5k bbl.Oil, bbl per month05,00010k15k20kPeak 15.5k (Dec 21)10.6k'22'23'24'25'26

Gas output in the Bakke (Wolfcamp) field rose 23% over the last 12 months

166k mcf in the 12 months through Jul 2026, against 134k mcf in the 12 months before. Peak month: Nov 2021, 33.5k mcf.

Gas output in the Bakke (Wolfcamp) field rose 23% over the last 12 months166k mcf in the 12 months through Jul 2026, against 134k mcf in the 12 months before. Peak month: Nov 2021, 33.5k mcf.Gas, mcf per month010k20k30k40kPeak 33.5k (Nov 21)12.9k20222023202420252026
Gas output in the Bakke (Wolfcamp) field rose 23% over the last 12 months166k mcf in the 12 months through Jul 2026, against 134k mcf in the 12 months before. Peak month: Nov 2021, 33.5k mcf.Gas, mcf per month010k20k30k40kPeak 33.5k (Nov 21)12.9k'22'23'24'25'26

SourceTexas Railroad Commission, Production Data Query, summed over the leases assigned to field 05166888. Reported through Jul 2026, file dated Sep 18, 2026. The newest month is often revised as operators file late.

Leases

Leases in the Bakke (Wolfcamp) field

Ranked by last-12-month output. Filter by operator, and open any lease for its month-by-month ledger.

SourceTexas Railroad Commission, Production Data Query. Ranked by an approximate value of last-12-month output, so oil and gas wells sort together.

In the Bakke (Wolfcamp) field

Who operates here, and where

Each operator and county links to its own page, so you can see the rest of what they run.

Operators in this field, by oil

Hilcorp Energy leads

  1. Hilcorp Energy Company4 producing leases here124kbbl

Counties in this field, by oil

Andrews County leads

  1. Andrews County4 producing leases124kbbl

Recent drilling permits in the Bakke (Wolfcamp) field

No recent drilling permits in this field are in our data yet.

For owners

What a field is, and why it matters to your check

RRC field number
05166888
RRC district
08
Leases on record
6
Producing leases
4

The Railroad Commission assigns each lease to a field: the underground pool or formation it produces from. A field can cross county lines and hold leases from many operators. Leases in the same field often move together, because they draw on the same rock.

That makes the field a fair yardstick. If your lease fell sharply and the rest of Bakke (Wolfcamp) did not, that is worth a question to your operator. If the whole field fell, the cause is probably geology or price, not your check.

The field trend above sums every lease in the field, so it is a good comparison for the lease page of any lease listed here.