Texas gas fieldField 25858220District 06Through August 2026
Douglass (James Lime)Nacogdoches County
The Douglass field sold 8.63 million cubic feet of gas and 10 barrels of oil in the last 12 months, from 2 leases.
In this photoTexianSideways well, surface spot to bottom hole
The story, from 257 months of reports
Douglass (James Lime): three leases, one operator now
Douglass (James Lime) is a gas field in Nacogdoches County with three leases and two horizontal gas wells. Gas made more of the field's output than oil in every full calendar year from 2005 to 2025.
Texian Operating Company, LLC is the only operator in the field now, and it runs both producing leases.
The biggest full calendar year was 2006, with 174 barrels of oil and 199,323 mcf of gas. Leases reporting dropped to one in 2021, and one lease still reported in 2025.
Not a forecast, not reserves.
Key moments
- 2005Douglass Gu 6, the oldest producing lease, first reports production.
- 2006Biggest full calendar year: 174 bbl of oil and 199,323 mcf of gas.
- 2020Leases reporting fall to two, from three the year before.
- 2021Only one lease reports production, with 2 bbl of oil.
- 2024Oil rises to 41 bbl and gas to 16,771 mcf, both from one lease.
SourceRailroad Commission production reports for every lease filed under field 25858220, April 2005 to August 2026. What the field has sold. Not a forecast, not reserves. Reported through August 2026.
Where the field sits
3 wells in Nacogdoches County
Every well the State files under the Douglass, drawn where its records put it. A well with a recorded bottom hole has a line to it. Wells with only a surface location appear as points. Colour the map by the company that operates each well, by how deep it runs, or see where drilling is headed.
Texian
1 operator. It has a colour. Tap a pad to see whose it is, or pick a county.
About 7 miles from west to east
What is on the map
Drilling locations: counted from the map as it loads
Leases by county
Wells near a town
Open the full well map
- Drilling locations0Permits issued in the last two years
- Producing wells2On a lease reporting production now
- Not producing1Shut in, inactive or no lease on record
- Plugged0The state's wellbore record says plugged
Each dot is a well on a lease the Railroad Commission lists in the Douglass (James Lime) field, where its map puts it, or a drilling permit filed for the field in the last 24 months. Wells of other fields are not on this map. The picture is about 11 miles across. The thin brown lines are the original land surveys; where there is room, a survey carries its abstract number, the number deeds and division orders cite. Sources: Railroad Commission of Texas well layers, drilling permit files and survey lines.
Use this map on your site
You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.
<a href="https://royaltyclerk.com/texas/fields/douglass-james-lime-25858220"><img src="https://royaltyclerk.com/maps/field-wells/douglass-james-lime-25858220.svg" alt="Map of the wells of the Douglass (James Lime) field, Texas: 3 wells and 0 recent drilling locations, in a picture about 11 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/fields/douglass-james-lime-25858220">Oil and gas wells of the Douglass (James Lime) field, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>SourcesWells, well paths, operators, permits and drilling dates: Railroad Commission of Texas. Map depth bands: true vertical depth from FracFocus. County lines: U.S. Census Bureau. The dashed line is drawn around the wells; the State keeps no outline for a field. Record dated November 17, 2026. Roll-up counted November 18, 2026.
Watch Private covers the land around yours: it tells you the day a permit or a frac lands within a mile.See Watch Private
From each well's Railroad Commission recordNew
Total depth along the wellbore
Total depth measures the full length of the drilled hole, including bends and horizontal sections. Each tick is one well's total depth on its completion record, shallowest first. The field summary has no true vertical depth from FracFocus.
3 wells have a total depth on record, from 8,608 to 8,687 feet as filed; the middle of them is 8,630 feet. Each tick is one well.
feet: the middle of the completed total depths on record, along the hole as filed. That is 1.63 miles of hole.
feet: the deepest completed total depth on record.
wells have a completed total depth on record: every well on the field's leases.
Why no rock names: the State's well records give a well's total depth in feet and file the well under its field, not under the rock layer it produces from. So the drawing marks depths, never formations.
SourcesCompleted depth: the total depth on each well's own Railroad Commission well record, matched by API number whatever lease lists the well, one per API number, in whole feet as filed. Completed April 25, 2005 to July 20, 2006 (the earliest completion date on each well's record). 3 of the field's 3 wells have a completed total depth on record; a well without one is not drawn.
For mineral owners, from the state record
What Douglass owners ask
- 01What is the Douglass field?
- Douglass (James Lime) is the name the Railroad Commission files these leases under: field 25858220, district 06. The State files every lease under a field. The field on your statement names the rock your wells produce from, not the town they are near.
- Source: Railroad Commission of Texas field list, field 25858220, district 06.
- See wellbore depths
- 02Is my lease in the Douglass?
- 2 leases report to this field, in Nacogdoches County. A lease can report to two fields when its wells reach different rock, and then it has a page under each. Another 1 lease is on record and not producing. Search the lease name on your check stub to see which fields it reports to.
- Source: Railroad Commission production reports, field of record for each lease.
- Find my lease
- 03Who pays royalties in the Douglass?
- 1 operator reported production from the field in the last 12 months. The one that pays you is the company named on your check stub. Texian Operating Company, LLC runs all 2 producing leases.
- Source: Railroad Commission production reports, operator of record.
- See the operator
- 04Why did my Douglass check go down?
- Oil sold▼ 54.5%Oil price▲ 10.4%Gas sold▼ 42.0%Gas price▲ 14.3%
- Across the field, oil sold is down 54.5% on the 12 months before and the oil price is up 10.4%. In the same months gas sold is down 42.0% and the gas price up 14.3%. A check can move with the field's volume and the price with nothing wrong on the lease. The statement check tells the two apart.
- Source: Railroad Commission production reports; U.S. Energy Information Administration prices.
- Why is my check lower?
- 05Who operates the leases in this field now?
- Texian Operating Company, LLC is the only operator in the field now. It runs both producing leases, which hold two wells, both horizontal. Its name appears on the state reports for those leases.
- 06How much has the field's gas changed since 2006?
- The biggest full calendar year was 2006, with 199,323 mcf of gas. In 2025 the field reported 11,004 mcf of gas, from one lease. The state reports show gas and oil for each full year back to 2005.
- Gas royalty calculator
- 07Are the wells in this field horizontal?
- The state record counts two wells on the producing leases, and both are horizontal. The horizontal share is 100.0% of the field's wells. Owners can compare this with the page for the oldest producing lease, Douglass Gu 6.
- 08Which lease in this field has produced the longest?
- Douglass Gu 6, lease number 211304, is the oldest producing lease in the field. Its first monthly report is for April 2005. Texian Operating Company, LLC is its operator.
257 months against seven other recordsNew
How oil and gas moved year by year since 2005
The whole field is the line on top. Under it, on the same clock: the weather, the price, how many leases reported, new wells, takeovers, State cut-offs and leases that went silent. Move across it.
Gas averaged $2.78 an mcf · 2 leases reporting
- PriceThe oil price fell 19.8% the month before, to $80.46 a barrel.
Move the pointer or drag across the chart. The numbered buttons jump to each month.
Monthly gas sold from the Douglass (James Lime) field since April 2005, with the record tracks beneath it on the same clock. 257 months from April 2005 to August 2026. The most in one month: 36,532 mcf, June 2005. The newest month: 699 mcf. Moments marked: 1, Sep 2005; 2, Dec 2005; 3, Oct 2006; 4, Feb 2007; 5, Jul 2008; 6, Mar 2017.
SourcesProduction, leases, new wells, takeovers, cut-offs and silent leases: Railroad Commission of Texas. Weather: NOAA Storm Events (file dated Oct 26, 2026) and NOAA daily county lows observed through Feb 21, 2026. Prices: U.S. Energy Information Administration (WTI for oil, Henry Hub for gas). A record in the same month is not proof of a cause. Reported through August 2026. Roll-up counted November 18, 2026.
Royalty Watch tells you the month your own lease starts to drop, with the records from that month.See Royalty Watch
22 years of state records, 2005 to 2026
Sold since April 2005
$6.3 million
What the field's oil and gas sold for at each month's public prices, before tax and the operators' deductions.
- Oil sold
- 1,079barrels
- Gas sold
- 1.07 billioncubic feet
- Best year
- 2005$1.6 million sold
| Year | Oil, dollars | Gas, dollars | Total |
|---|---|---|---|
| 2005, to August | $12,000 | $1.6 million | $1.6 million |
| 2006 | $11,000 | $1.3 million | $1.3 million, sold the most |
| 2007 | $5,000 | $854,000 | $860,000 |
| 2008 | $5,000 | $723,000 | $728,000 |
| 2009 | $8,000 | $261,000 | $269,000 |
| 2010 | $6,000 | $244,000 | $251,000 |
| 2011 | $4,000 | $190,000 | $195,000 |
| 2012 | $4,000 | $114,000 | $118,000 |
| 2013 | $1,000 | $147,000 | $149,000 |
| 2014 | $2,000 | $152,000 | $154,000 |
| 2015 | $1,000 | $69,000 | $70,000 |
| 2016 | $1,000 | $37,000 | $38,000 |
| 2017 | $1,000 | $92,000 | $94,000 |
| 2018 | $0 | $72,000 | $72,000 |
| 2019 | $1,000 | $47,000 | $48,000 |
| 2020 | $0 | $33,000 | $33,000 |
| 2021 | $0 | $56,000 | $56,000 |
| 2022 | $1,000 | $95,000 | $96,000 |
| 2023 | $1,000 | $34,000 | $36,000 |
| 2024 | $3,000 | $36,000 | $39,000 |
| 2025 | $0 | $41,000 | $41,000 |
| 2026, to August | $0 | $20,000 | $21,000 |
For research and teaching
Royalty Clerk. “Douglass (James Lime) field, Texas.” Data through August 2026, from Railroad Commission of Texas filings. royaltyclerk.com/texas/fields/douglass-james-lime-25858220.
SourcesRailroad Commission Production Data Query, every monthly report since April 2005. EIA monthly WTI and Henry Hub prices. 2026 is part of a year, drawn lighter. Not a forecast, not reserves. Reported through August 2026.
Lease output over 12 months
Which three leases make up this field
Most reporting leases are in the smaller size groups. The bars show 2 leases that reported oil or gas during the 12 months through August 2026, grouped by gas output. Pick a lease in the table to highlight its group. The table draws from the 2 leases counted as currently producing based on recent state filings.
| Lease | Operator | County | Gas soldmcf, 12 months to Aug 2026 | Changeon the 12 before | 24 months | Also on record |
|---|---|---|---|---|---|---|
| DOUGLASS GU 7BTexian Operating Company, LLC · Nacogdoches | Texian Operating Company, LLC | Nacogdoches | 5,301 | ▼ 47.6% | Lower tax | |
| DOUGLASS GU 6Texian Operating Company, LLC · Nacogdoches | Texian Operating Company, LLC | Nacogdoches | 3,326 | ▼ 28.8% | 19 silent months, 2015Lower tax |
Showing 2 of 2.
Search every Texas leaseSourceTexas Railroad Commission Production Data Query, field 25858220, through August 2026, file dated Oct 20, 2026. 1 more lease is on record and not producing.
1 operator, one county
Who has operated this field and where
Texian Operating Company, LLC operates every lease that reported gas in the last 12 months, all in Nacogdoches County.
By gas in the last 12 months
- 1Texian Operating Company, LLC8,627mcf2 leases · 100% of the field's gas · Nacogdoches
SourceTexas Railroad Commission Production Data Query, operator of record for each lease, through August 2026. Record dated October 20, 2026.
Gas prices and taxNew
The State approved a lower tax on 2 of the 2 leases
an mcf, Henry Hub, the average of the 12 months through August 2026, up 14.3% on the 12 before.
The tax office's price for each lease of this field shows here once the Comptroller's records for it arrive. Leases sell at different points and qualities, so their prices differ from the market for ordinary reasons too.
Lower tax approvals in this field
- LOW PRODUCING WELLS
- 2 leases
- Newest approval
- January 2013
100% of the field's producing leases
On those leases the tax line on a statement should show the lower rate. Each lease page says which wells and until when.
Henry Hub, the 12 months through August 2026
No operator here reports a price to investors on file.
Not on file here yet. It shows once the Comptroller's records for this field arrive.
The price on your own check stub, set beside these three. Check my statement
SourcesMarket: U.S. Energy Information Administration, Henry Hub. Tax approvals: Texas Comptroller. A lease shows only where the Comptroller's records have arrived. Reported through October 2026. Roll-up counted November 18, 2026.
Watch Plus sets these prices beside the price on each of your statements, every month.See Watch Plus
Who buys the gasNew
3 leases with a gas purchaser on file
Each bar is one operator's gas allocated to its current buyer rows, split by buyer. Shares use reported production and the State's Form P-4.
No company filing on file here names a buyer and its operator in the same company, so whether they share an owner is unknown, not none. Buyers as of the Form P-4 record dated Oct 24, 2026.
Form P-4 filings and how the shares are calculated
Each lease's reported production over the field's last 12 months is allocated by the buyer's percent on the Form P-4; where no percent is filed, the lease's current buyers are given equal shares, an estimate. This is an allocation, not a sales record or a metered volume: where a lease has some percents filed and some missing, its allocations can add to more than its production. A lease with no current buyer on file is not counted, so these shares are of the 8,627 mcf allocated across current buyer rows, not of the whole field.
Gas purchasers
3 leases across 3 current entries on Form P-4.
- KINDER MORGAN TEJAS PIPELINE LLC · 3 leases
Common ownership with the operator is unconfirmed in the company records checked.
Latest P-4 source dateGas purchasers buy casinghead gas or gas-well gas. Oil gatherers collect oil for transport. Each lease counts once in each role, even if several companies or gas products are listed. The company lists show up to five parties by lease count. A lease can appear under more than one company.
SourcesAllocation bars: Railroad Commission Form P-4 current purchaser rows, with each lease's reported production over the last 12 months (Railroad Commission production reports) allocated by the buyer's filed percent, or an equal split of the lease where none is filed; only gas on leases with a current buyer on file is counted. An allocation, not a sales record. Ownership: U.S. Securities and Exchange Commission filings and State organization reports. Record dated October 24, 2026. Roll-up counted November 18, 2026.
Royalty Watch tells you the day the buyer of your oil or gas changes.See Royalty Watch
Seen from space, 2025New
No matched night observations on file for the field's leases
Weather satellites pass over Texas every night and record heat on the ground. No night observation in 2025 is matched to this field's leases on file here, and the satellites' coverage of these wells is unverified, so this is not a finding that there was no heat.
Where the field's gas went in 2025, as operators reported it
SourcesHeat: VIIRS active fire readings at night from NOAA-20, NOAA-21 and Suomi NPP (NOAA open data), matched to a lease's wells; a GOES-East reading alone never counts as a night. Satellite record read to Nov 17, 2026. Reported flaring and gas use: Railroad Commission production reports. Cloud hides heat, so the count is a floor. The satellite records heat. It does not say what burned. Roll-up counted November 18, 2026.
Watch Plus checks whether you were paid on gas in the months heat was seen at your lease.See Watch Plus
Well stages
Wells between permit and first production
A comparison of permits, drilling and fracs is unavailable for this field. No drilling permit for this field is among the State permit records read here.
SourceRailroad Commission drilling permits and FracFocus. Checked for the Douglass field. Source date unavailable. Roll-up counted November 18, 2026.
Royalty Watch tells you the day a well on your lease moves to its next stage.See Royalty Watch
Do your Douglass checks match the State?
Own minerals here? Add your leases to My leases and see your share of every month.
Example
A whole month was never paid
The State shows 28,175 barrels of oil sold from the lease in the month its operator changed from Operator A to Operator B, so the owner's share is 27.51 barrels. No statement covers that month.
Ask Operator B's owner relations: is that month held in suspense after the change of operator?
$2,277oil and gas
A sample finding, from our example check.
Around this field
Nearby
Fields nearby
- Douglass, W. (Travis Peak)253 leases
- Trawick (Pettit-TP Cons.)224 leases
- Carthage (Haynesville Shale)199 leases
- Naconiche Creek (Rod.-TP Cons.)66 leases
- Kendrick (James)39 leases
Towns
- Nacogdoches2 wells within 10 miles
Related pages
- Nacogdoches CountyNacogdoches County page, where this field sits.
- Douglass Gu 6Oldest producing lease here, with its first report in April 2005.
More
- Texas fields, A to ZEvery field with producing leases in Railroad Commission records.
- Check a stub against a leaseMatch the barrels and mcf on your stub to the state record.
Where this page comes from
- Railroad Commission of Texas production, Form P-4, permits, wells, completions, cut-offs
- Texas Comptroller tax approvals
- U.S. Energy Information Administration prices
- NOAA storms and cold
- NOAA open data VIIRS night heat (NOAA-20, NOAA-21, Suomi NPP)
- U.S. Geological Survey photo from the air
- U.S. Census Bureau county shapes