Texas gas fieldField 43593500District 04Through August 2026
Hundido (Lobo)Zapata County
The Hundido field sold 506 million cubic feet of gas and 13 barrels of oil in the last 12 months, from 45 leases.
In this photoMeritVaras Energy Operating Company,Other operatorsSurface spot, no path on record
The story, from 404 months of reports
How Hundido (Lobo) went from 91 leases reporting to 1
Hundido (Lobo) is a gas field in Zapata County, and gas made more of its output than oil in every full calendar year from 1993 to 2025. Conoco Inc. first reported 29 leases here between 1993 and 1999. North Central Oil Corp., Pogo Producing Company and Aruba Petroleum, Inc. first reported leases from 2000 to 2009.
2001 was the full calendar year that produced the most gas here, at 8,785,700 mcf. Leases reporting reached 91 in 2007. The count fell to 5 in 2020 and to 1 in 2025. No lease first reported in 2010 or later.
Merit Energy Company runs 38 producing leases in the field, which is 87.5% of its output counted in barrels of oil equivalent. Its oldest producing lease, Rathmell, J.g., first reported in January 1993.
Not a forecast, not reserves.
Key moments
- 2001Gas reached 8,785,700 mcf, the most of any full calendar year.
- 2005Oil reached 337 bbl, the most of any full calendar year.
- 2020Leases reporting fell to 5, from 82 the year before.
SourceRailroad Commission production reports for every lease filed under field 43593500, January 1993 to August 2026. What the field has sold. Not a forecast, not reserves. Reported through August 2026.
Where the field sits
82 wells in Zapata County
Every well the State files under the Hundido, drawn where its records put it. A well with a recorded bottom hole has a line to it. Wells with only a surface location appear as points. Colour the map by the company that operates each well, by how deep it runs, or see where drilling is headed.
MeritVaras Energy Operating Company,
2 operators. Each has a colour. Tap a pad to see whose it is, or pick a county.
About 4 miles from west to east
What is on the map
Drilling locations: counted from the map as it loads
Leases by county
Open the full well map
- Drilling locations0Permits issued in the last two years
- Producing wells45On a lease reporting production now
- Not producing36Shut in, inactive or no lease on record
- Plugged1The state's wellbore record says plugged
Each dot is a well on a lease the Railroad Commission lists in the Hundido (Lobo) field, where its map puts it, or a drilling permit filed for the field in the last 24 months. Wells of other fields are not on this map. The picture is about 15 miles across. The thin brown lines are the original land surveys; where there is room, a survey carries its abstract number, the number deeds and division orders cite. Sources: Railroad Commission of Texas well layers, drilling permit files and survey lines.
Use this map on your site
You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.
<a href="https://royaltyclerk.com/texas/fields/hundido-lobo-43593500"><img src="https://royaltyclerk.com/maps/field-wells/hundido-lobo-43593500.svg" alt="Map of the wells of the Hundido (Lobo) field, Texas: 82 wells and 0 recent drilling locations, in a picture about 15 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/fields/hundido-lobo-43593500">Oil and gas wells of the Hundido (Lobo) field, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>SourcesWells, well paths, operators, permits and drilling dates: Railroad Commission of Texas. Map depth bands: true vertical depth from FracFocus. County lines: U.S. Census Bureau. The dashed line is drawn around the wells; the State keeps no outline for a field. Record dated November 17, 2026. Roll-up counted November 18, 2026.
Watch Private covers the land around yours: it tells you the day a permit or a frac lands within a mile.See Watch Private
From each well's Railroad Commission recordNew
Total depth along the wellbore
Total depth measures the full length of the drilled hole, including bends and horizontal sections. Each tick is one well's total depth on its completion record, shallowest first. The field summary has no true vertical depth from FracFocus.
82 wells have a total depth on record, from 9,950 to 12,200 feet as filed; the middle of them is 10,825 feet. Each tick is one well.
feet: the middle of the completed total depths on record, along the hole as filed. That is 2.05 miles of hole.
feet: the deepest completed total depth on record.
wells have a completed total depth on record: every well on the field's leases.
Why no rock names: the State's well records give a well's total depth in feet and file the well under its field, not under the rock layer it produces from. So the drawing marks depths, never formations.
SourcesCompleted depth: the total depth on each well's own Railroad Commission well record, matched by API number whatever lease lists the well, one per API number, in whole feet as filed. Completed August 26, 1976 to January 9, 2008 (the earliest completion date on each well's record). 82 of the field's 82 wells have a completed total depth on record; a well without one is not drawn.
For mineral owners, from the state record
What Hundido owners ask
- 01What is the Hundido field?
- Hundido (Lobo) is the name the Railroad Commission files these leases under: field 43593500, district 04. The State files every lease under a field. The field on your statement names the rock your wells produce from, not the town they are near.
- Source: Railroad Commission of Texas field list, field 43593500, district 04.
- See wellbore depths
- 02Is my lease in the Hundido?
- 45 leases report to this field, in Zapata County. A lease can report to two fields when its wells reach different rock, and then it has a page under each. Another 37 leases are on record and not producing. Search the lease name on your check stub to see which fields it reports to.
- Source: Railroad Commission production reports, field of record for each lease.
- Find my lease
- 03Who pays royalties in the Hundido?
- Merit Energy Company38Varas Energy Operating Company,8
- 2 operators reported production from the field in the last 12 months. The one that pays you is the company named on your check stub. Merit Energy Company runs the most leases, 38 of the 45.
- Source: Railroad Commission production reports, operator of record.
- See all 2 operators
- 04Why did my Hundido check change?
- Oil sold▲ 333%Oil price▲ 10.4%Gas sold▲ 7.39%Gas price▲ 14.3%
- Across the field, oil sold is up 333% on the 12 months before and the oil price is up 10.4%. In the same months gas sold is up 7.39% and the gas price up 14.3%. A check can move with the field's volume and the price with nothing wrong on the lease. The statement check tells the two apart.
- Source: Railroad Commission production reports; U.S. Energy Information Administration prices.
- Why is my check lower?
- 05Who runs the leases in Hundido (Lobo) now?
- The state record shows two operators in this field now. Merit Energy Company runs 38 producing leases, which is 87.5% of the field's output counted in barrels of oil equivalent. Varas Energy Operating Company runs 7 producing leases, and its share is 12.5%.
- 06How many leases have reported production since 2020?
- Leases reporting fell from 82 in 2019 to 5 in 2020, and to 1 in 2025. In 2026, through July, 4 leases reported production. Four leases stopped in 2020 or later, and 25 stopped before 2020.
- 07Is this field a gas field or an oil field?
- It is a gas field. Gas made more of the output than oil in every full calendar year from 1993 to 2025. Oil reached its highest full calendar year at 337 bbl in 2005, while gas reached 8,785,700 mcf in 2001.
- Gas royalty calculator
- 08Which lease in this field is the oldest?
- Rathmell, J.g., lease number 099141, is the oldest producing lease in the field. Merit Energy Company is its operator. Its first reported month is January 1993.
404 months against seven other recordsNew
How much gas and oil has this field made each year?
The whole field is the line on top. Under it, on the same clock: the weather, the price, how many leases reported, new wells, takeovers, State cut-offs and leases that went silent. Move across it.
Gas averaged $2.78 an mcf · 45 leases reporting
- PriceThe oil price fell 19.8% the month before, to $80.46 a barrel.
Move the pointer or drag across the chart. The numbered buttons jump to each month.
Monthly gas sold from the Hundido (Lobo) field since January 1993, with the record tracks beneath it on the same clock. 404 months from January 1993 to August 2026. The most in one month: 918,996 mcf, December 1997. The newest month: 43,239 mcf. Moments marked: 1, Apr 1995; 2, Mar 1996; 3, Mar 1998; 4, Nov 1998; 5, Mar 2001; 6, Jan 2002.
SourcesProduction, leases, new wells, takeovers, cut-offs and silent leases: Railroad Commission of Texas. Weather: NOAA Storm Events (file dated Oct 26, 2026) and NOAA daily county lows observed through Feb 21, 2026. Prices: U.S. Energy Information Administration (WTI for oil, Henry Hub for gas). A record in the same month is not proof of a cause. Reported through August 2026. Roll-up counted November 18, 2026.
Royalty Watch tells you the month your own lease starts to drop, with the records from that month.See Royalty Watch
34 years of state records, 1993 to 2026
Sold since January 1993
$527.1 million
What the field's oil and gas sold for at each month's public prices, before tax and the operators' deductions.
- Oil sold
- 2,624barrels
- Gas sold
- 132 billioncubic feet
- Best year
- 2008$45.4 million sold
| Year | Oil, dollars | Gas, dollars | Total |
|---|---|---|---|
| 1993 | $3,000 | $7.4 million | $7.4 million |
| 1994 | $2,000 | $13.4 million | $13.4 million |
| 1995 | $0 | $13.8 million | $13.8 million |
| 1996 | $0 | $16.1 million | $16.1 million |
| 1997 | $0 | $17.5 million | $17.5 million |
| 1998 | $1,000 | $18 million | $18 million |
| 1999 | $0 | $15.8 million | $15.8 million |
| 2000 | $0 | $38 million | $38 million |
| 2001 | $0 | $34.4 million | $34.4 million |
| 2002 | $0 | $23.7 million | $23.7 million |
| 2003 | $1,000 | $34.4 million | $34.4 million |
| 2004 | $6,000 | $42.8 million | $42.8 million |
| 2005 | $18,000 | $43.6 million | $43.6 million |
| 2006 | $15,000 | $30.4 million | $30.4 million |
| 2007 | $12,000 | $43.1 million | $43.1 million |
| 2008 | $6,000 | $45.4 million | $45.4 million, sold the most |
| 2009 | $2,000 | $14.8 million | $14.8 million |
| 2010 | $2,000 | $13.4 million | $13.4 million |
| 2011 | $1,000 | $10.7 million | $10.7 million |
| 2012 | $0 | $5.3 million | $5.3 million |
| 2013 | $2,000 | $6.5 million | $6.5 million |
| 2014 | $1,000 | $6.5 million | $6.5 million |
| 2015 | $1,000 | $3 million | $3 million |
| 2016 | $1,000 | $2.7 million | $2.7 million |
| 2017 | $1,000 | $3.2 million | $3.2 million |
| 2018 | $2,000 | $3.2 million | $3.2 million |
| 2019 | $9,000 | $2.3 million | $2.3 million |
| 2020 | $6,000 | $1.6 million | $1.6 million |
| 2021 | $13,000 | $3.2 million | $3.2 million |
| 2022 | $14,000 | $5.5 million | $5.5 million |
| 2023 | $5,000 | $1.7 million | $1.7 million |
| 2024 | $0 | $1.2 million | $1.2 million |
| 2025 | $0 | $1.7 million | $1.7 million |
| 2026, to August | $1,000 | $1.1 million | $1.1 million |
For research and teaching
Royalty Clerk. “Hundido (Lobo) field, Texas.” Data through August 2026, from Railroad Commission of Texas filings. royaltyclerk.com/texas/fields/hundido-lobo-43593500.
SourcesRailroad Commission Production Data Query, every monthly report since January 1993. EIA monthly WTI and Henry Hub prices. 2026 is part of a year, drawn lighter. Not a forecast, not reserves. Reported through August 2026.
Lease output over 12 months
Which leases here are old, and which have stopped?
Most reporting leases are in the smaller size groups. The bars show 46 leases that reported oil or gas during the 12 months through August 2026, grouped by gas output. Pick a lease in the table to highlight its group. The table draws from the 45 leases counted as currently producing based on recent state filings.
Showing 25 of 45.
Search every Texas leaseSourceTexas Railroad Commission Production Data Query, field 43593500, through August 2026, file dated Oct 20, 2026. 37 more leases are on record and not producing.
2 operators, one county
Who runs the leases in Hundido (Lobo) and where
Each box is one operator's gas from one county in the last 12 months, drawn to size. The two biggest operators keep the colours they have on the map.
By gas in the last 12 months
- 1Merit Energy Company443,111mcf38 leases · 87.5% of the field's gas · Zapata
- 2Varas Energy Operating Company,63,323mcf8 leases · 12.5% of the field's gas · Zapata
SourceTexas Railroad Commission Production Data Query, operator of record for each lease, through August 2026. Record dated October 20, 2026.
Gas prices and taxNew
The State approved a lower tax on 45 of the 45 leases
an mcf, Henry Hub, the average of the 12 months through August 2026, up 14.3% on the 12 before.
The tax office's price for each lease of this field shows here once the Comptroller's records for it arrive. Leases sell at different points and qualities, so their prices differ from the market for ordinary reasons too.
Lower tax approvals in this field
- LOW PRODUCING WELLS
- 45 leases
- Newest approval
- September 2020
100% of the field's producing leases
On those leases the tax line on a statement should show the lower rate. Each lease page says which wells and until when.
Henry Hub, the 12 months through August 2026
No operator here reports a price to investors on file.
Not on file here yet. It shows once the Comptroller's records for this field arrive.
The price on your own check stub, set beside these three. Check my statement
SourcesMarket: U.S. Energy Information Administration, Henry Hub. Tax approvals: Texas Comptroller. A lease shows only where the Comptroller's records have arrived. Reported through October 2026. Roll-up counted November 18, 2026.
Watch Plus sets these prices beside the price on each of your statements, every month.See Watch Plus
Who buys the gasNew
82 leases with a gas purchaser on file
Each bar is one operator's gas allocated to its current buyer rows, split by buyer. Shares use reported production and the State's Form P-4.
No company filing on file here names a buyer and its operator in the same company, so whether they share an owner is unknown, not none. Buyers as of the Form P-4 record dated Oct 24, 2026.
Form P-4 filings and how the shares are calculated
Each lease's reported production over the field's last 12 months is allocated by the buyer's percent on the Form P-4; where no percent is filed, the lease's current buyers are given equal shares, an estimate. This is an allocation, not a sales record or a metered volume: where a lease has some percents filed and some missing, its allocations can add to more than its production. A lease with no current buyer on file is not counted, so these shares are of the 506,434 mcf allocated across current buyer rows, not of the whole field.
Gas purchasers
82 leases across 82 current entries on Form P-4.
- LOBO PIPELINE COMPANY L.P. · 52 leases
- ENERGY TRANSFER COMPANY · 11 leases
- HOUSTON PIPE LINE COMPANY LP · 8 leases
- KINDER MORGAN TEXAS PIPELINE LLC · 8 leases
- MERIT ENERGY COMPANY · 2 leases
Common ownership with the operator is unconfirmed in the company records checked.
Latest P-4 source dateGas purchasers buy casinghead gas or gas-well gas. Oil gatherers collect oil for transport. Each lease counts once in each role, even if several companies or gas products are listed. The company lists show up to five parties by lease count. A lease can appear under more than one company.
SourcesAllocation bars: Railroad Commission Form P-4 current purchaser rows, with each lease's reported production over the last 12 months (Railroad Commission production reports) allocated by the buyer's filed percent, or an equal split of the lease where none is filed; only gas on leases with a current buyer on file is counted. An allocation, not a sales record. Ownership: U.S. Securities and Exchange Commission filings and State organization reports. Record dated October 24, 2026. Roll-up counted November 18, 2026.
Royalty Watch tells you the day the buyer of your oil or gas changes.See Royalty Watch
Seen from space, 2025New
No matched night observations on file for the field's leases
Weather satellites pass over Texas every night and record heat on the ground. No night observation in 2025 is matched to this field's leases on file here, and the satellites' coverage of these wells is unverified, so this is not a finding that there was no heat.
Where the field's gas went in 2025, as operators reported it
SourcesHeat: VIIRS active fire readings at night from NOAA-20, NOAA-21 and Suomi NPP (NOAA open data), matched to a lease's wells; a GOES-East reading alone never counts as a night. Satellite record read to Nov 17, 2026. Reported flaring and gas use: Railroad Commission production reports. Cloud hides heat, so the count is a floor. The satellite records heat. It does not say what burned. Roll-up counted November 18, 2026.
Watch Plus checks whether you were paid on gas in the months heat was seen at your lease.See Watch Plus
Well stages
Wells between permit and first production
A comparison of permits, drilling and fracs is unavailable for this field. No drilling permit for this field is among the State permit records read here.
SourceRailroad Commission drilling permits and FracFocus. Checked for the Hundido field. Source date unavailable. Roll-up counted November 18, 2026.
Royalty Watch tells you the day a well on your lease moves to its next stage.See Royalty Watch
Do your Hundido checks match the State?
Own minerals here? Add your leases to My leases and see your share of every month.
Example
A whole month was never paid
The State shows 28,175 barrels of oil sold from the lease in the month its operator changed from Operator A to Operator B, so the owner's share is 27.51 barrels. No statement covers that month.
Ask Operator B's owner relations: is that month held in suspense after the change of operator?
$2,277oil and gas
A sample finding, from our example check.
Around this field
Nearby
Fields nearby
- LA Perla (Lobo Cons.)370 leases
- Haynes (Middle Wilcox Cons.)263 leases
- Roleta (Wilcox Consolidated)212 leases
- Jennings Ranch (Lobo Cons.)203 leases
- Exsun (Lobo Cons.)186 leases
Operators here
- Merit Energy Company38 leases
- Varas Energy Operating Company,7 leases
Related pages
- Merit Energy CompanyMerit runs 38 of this field's 45 producing leases.
- Varas Energy Operating Company,Varas runs 7 producing leases here, with 12.5% of the field's output.
- Zapata CountyZapata is the only county this field sits in.
- Rathmell, J.g.The field's oldest producing lease, first reported in January 1993.
More
- Texas fields, A to ZEvery field with producing leases in Railroad Commission records.
- Check a stub against a leaseMatch the barrels and mcf on your stub to the state record.
Where this page comes from
- Railroad Commission of Texas production, Form P-4, permits, wells, completions, cut-offs
- Texas Comptroller tax approvals
- U.S. Energy Information Administration prices
- NOAA storms and cold
- NOAA open data VIIRS night heat (NOAA-20, NOAA-21, Suomi NPP)
- U.S. Geological Survey photo from the air
- U.S. Census Bureau county shapes