Skip to content

Texas field · RRC field 46058333 · District 09

Jefferson, Ne. (Caddo Lime)

12 producing leases run by 4 operators in 1 Texas county. The field reported 108,538 barrels of oil and 137,511 mcf of gas in the 12 months through Jul 2026.

Field dossier · 1 county

108,538bbl oil, last 12 months−10% vs prior year
Producing leases
12
Operators
4
Counties
1
Biggest operator
Bridwell Oil Co.

Own minerals in this field?

Upload a royalty check stub or a phone photo. We compare each month with the state numbers for your lease and tell you what to ask your operator.

Where the field sits

This county

Archer County: 12 producing leasesArcherBaylorJackClayWilbargerWichitaArcher County
1 countyClick a county to open it
Gas, last 12 months
137,511 mcf
RRC field no.
46058333
RRC district
09
Data through
Jul 2026

Production

Five years of output in Jefferson, Ne. (Caddo Lime)

Monthly totals across the leases the Railroad Commission assigns to this field.

Oil output in the Jefferson, Ne. (Caddo Lime) field fell 10% over the last 12 months

106k bbl in the 12 months through Jul 2026, against 118k bbl in the 12 months before. Peak month: Aug 2024, 13.1k bbl.

Oil output in the Jefferson, Ne. (Caddo Lime) field fell 10% over the last 12 months106k bbl in the 12 months through Jul 2026, against 118k bbl in the 12 months before. Peak month: Aug 2024, 13.1k bbl.Oil, bbl per month05,00010k15kPeak 13.1k (Aug 24)7,92620222023202420252026
Oil output in the Jefferson, Ne. (Caddo Lime) field fell 10% over the last 12 months106k bbl in the 12 months through Jul 2026, against 118k bbl in the 12 months before. Peak month: Aug 2024, 13.1k bbl.Oil, bbl per month05,00010k15kPeak 13.1k (Aug 24)7,926'22'23'24'25'26

Gas output in the Jefferson, Ne. (Caddo Lime) field rose 10% over the last 12 months

136k mcf in the 12 months through Jul 2026, against 124k mcf in the 12 months before. Peak month: Sep 2025, 13.6k mcf.

Gas output in the Jefferson, Ne. (Caddo Lime) field rose 10% over the last 12 months136k mcf in the 12 months through Jul 2026, against 124k mcf in the 12 months before. Peak month: Sep 2025, 13.6k mcf.Gas, mcf per month05,00010k15kPeak 13.6k (Sep 25)11.8k20222023202420252026
Gas output in the Jefferson, Ne. (Caddo Lime) field rose 10% over the last 12 months136k mcf in the 12 months through Jul 2026, against 124k mcf in the 12 months before. Peak month: Sep 2025, 13.6k mcf.Gas, mcf per month05,00010k15kPeak 13.6k (Sep 25)11.8k'22'23'24'25'26

SourceTexas Railroad Commission, Production Data Query, summed over the leases assigned to field 46058333. Reported through Jul 2026, file dated Sep 18, 2026. The newest month is often revised as operators file late.

Leases

Leases in the Jefferson, Ne. (Caddo Lime) field

Ranked by last-12-month output. Filter by operator, and open any lease for its month-by-month ledger.

Showing 12 of 12.

SourceTexas Railroad Commission, Production Data Query. Ranked by an approximate value of last-12-month output, so oil and gas wells sort together.

In the Jefferson, Ne. (Caddo Lime) field

Who operates here, and where

Each operator and county links to its own page, so you can see the rest of what they run.

Recent drilling permits in the Jefferson, Ne. (Caddo Lime) field

For owners

What a field is, and why it matters to your check

RRC field number
46058333
RRC district
09
Leases on record
12
Producing leases
12

The Railroad Commission assigns each lease to a field: the underground pool or formation it produces from. A field can cross county lines and hold leases from many operators. Leases in the same field often move together, because they draw on the same rock.

That makes the field a fair yardstick. If your lease fell sharply and the rest of Jefferson, Ne. (Caddo Lime) did not, that is worth a question to your operator. If the whole field fell, the cause is probably geology or price, not your check.

The field trend above sums every lease in the field, so it is a good comparison for the lease page of any lease listed here.