Skip to content
MOBEETIE OP UNIT R/A -A-N1 mile35.5179° N 100.4584° W · 2 MILES OF THE FIELD · PHOTO: U.S. GEOLOGICAL SURVEY

Texas gas fieldField 62243284District 10Through August 2026

Mobeetie (Douglas)Wheeler County

The Mobeetie field sold 24.1 million cubic feet of gas and 15,131 barrels of oil in the last 12 months, from 2 leases.

Each mark on the photo is one well’s surface spot

Is your lease in the Mobeetie?

Email me when a Mobeetie lease changes

In this photoSandlot Oil &Surface spot, no path on recordHollow: plugged

Gas, last 12 months
24.1 million cu ft
Oil, last 12 months
15,131 bbl
Producing leases
2 of 4
Producing wells
2
Wells on the way
1
Operator
1
Eight things the public record says about this field. Each one sets two records side by side, and one that finds nothing still shows and says so. Photo: U.S. Geological Survey.

The story, from 404 months of reports

One operator and one lease reporting since 2020

Gas sold each month since January 1993
5,00010K15,000 mcf a month199520002005201020152020202512Sold the mostDEC 1993

Mobeetie (Douglas) is a Wheeler County field in Railroad Commission District 10. Gas has made more of the field's output than oil in every full calendar year from 1993 to 2025, except 2014 and 2015, when there was no output.

Shannon Energy operated all three leases that reported on the first records back to January 1993. Unit R/A -A-, is run today by Sandlot Oil & Gas LLC, the field's only operator now.

Not a forecast, not reserves.

Key moments

  • 1993Biggest full calendar year: three leases, 169,977 mcf gas, 86 bbl oil.
  • 2014No oil or gas reported in the field in 2014.
  • 2016Gas returns at 1,643 mcf after the zero years 2014 and 2015.
  • 2020Leases reporting fall from three to one; gas 21,666 mcf.
  • 2026Through July 2026, one lease reports 12,187 bbl oil.

SourceRailroad Commission production reports for every lease filed under field 62243284, January 1993 to August 2026. What the field has sold. Not a forecast, not reserves. Reported through August 2026.

Where the field sits

3 wells in Wheeler County

Every well the State files under the Mobeetie, drawn where its records put it. A well with a recorded bottom hole has a line to it. Wells with only a surface location appear as points. Colour the map by the company that operates each well, by how deep it runs, or see where drilling is headed.

New layers
Loading the wells…

Sandlot Oil &

1 operator. It has a colour. Tap a pad to see whose it is, or pick a county.

About 1 mile from west to east

What is on the map

0sideways wells
2wells with no path on record
1plugged

Drilling locations: counted from the map as it loads

Leases by county

Open the full well map
Map of the wells of the Mobeetie (Douglas) field, Texas: 3 wells and 1 recent drilling location, in a picture about 7 miles across.
  • Drilling locations1Permits issued in the last two years
  • Producing wells2On a lease reporting production now
  • Not producing0Shut in, inactive or no lease on record
  • Plugged1The state's wellbore record says plugged

Each dot is a well on a lease the Railroad Commission lists in the Mobeetie (Douglas) field, where its map puts it, or a drilling permit filed for the field in the last 24 months. Wells of other fields are not on this map. The picture is about 7 miles across. The thin brown lines are the original land surveys; where there is room, a survey carries its abstract number, the number deeds and division orders cite. Sources: Railroad Commission of Texas well layers, drilling permit files and survey lines.

See the whole Texas well map

Use this map on your site

You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.

Download the picture (WebP)
<a href="https://royaltyclerk.com/texas/fields/mobeetie-douglas-62243284"><img src="https://royaltyclerk.com/maps/field-wells/mobeetie-douglas-62243284.svg" alt="Map of the wells of the Mobeetie (Douglas) field, Texas: 3 wells and 1 recent drilling location, in a picture about 7 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/fields/mobeetie-douglas-62243284">Oil and gas wells of the Mobeetie (Douglas) field, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>

SourcesWells, well paths, operators, permits and drilling dates: Railroad Commission of Texas. Map depth bands: true vertical depth from FracFocus. County lines: U.S. Census Bureau. The dashed line is drawn around the wells; the State keeps no outline for a field. Record dated November 16, 2026. Roll-up counted November 18, 2026.

Watch Private covers the land around yours: it tells you the day a permit or a frac lands within a mile.See Watch Private

From each well's Railroad Commission recordNew

Total depth along the wellbore

Total depth measures the full length of the drilled hole, including bends and horizontal sections. Each tick is one well's total depth on its completion record, shallowest first. The field summary has no true vertical depth from FracFocus.

EACH WELL'S TOTAL DEPTH AS FILED, SHALLOWEST TO DEEPEST0 ft2,0004,0006,0008,00010,00012,000THE MIDDLE: 7,444 FEETTHE DEEPEST: 12,575 FEET

3 wells have a total depth on record, from 6,876 to 12,575 feet as filed; the middle of them is 7,444 feet. Each tick is one well.

7,444

feet: the middle of the completed total depths on record, along the hole as filed. That is 1.41 miles of hole.

12,575

feet: the deepest completed total depth on record.

3

wells have a completed total depth on record: every well on the field's leases.

Why no rock names: the State's well records give a well's total depth in feet and file the well under its field, not under the rock layer it produces from. So the drawing marks depths, never formations.

SourcesCompleted depth: the total depth on each well's own Railroad Commission well record, matched by API number whatever lease lists the well, one per API number, in whole feet as filed. Completed May 10, 1963 to June 13, 1965 (the earliest completion date on each well's record). 3 of the field's 3 wells have a completed total depth on record; a well without one is not drawn.

For mineral owners, from the state record

What Mobeetie owners ask

01What is the Mobeetie field?
Mobeetie (Douglas) is the name the Railroad Commission files these leases under: field 62243284, district 10. The State files every lease under a field. The field on your statement names the rock your wells produce from, not the town they are near.
Source: Railroad Commission of Texas field list, field 62243284, district 10.
See wellbore depths
02Is my lease in the Mobeetie?
2 leases report to this field, in Wheeler County. A lease can report to two fields when its wells reach different rock, and then it has a page under each. Another 2 leases are on record and not producing. Search the lease name on your check stub to see which fields it reports to.
Source: Railroad Commission production reports, field of record for each lease.
Find my lease
03Who pays royalties in the Mobeetie?
1 operator reported production from the field in the last 12 months. The one that pays you is the company named on your check stub. Sandlot Oil & Gas LLC runs all 2 producing leases.
Source: Railroad Commission production reports, operator of record.
See the operator
04Why did my Mobeetie check change?
Across the field, gas sold is up 1040% and the gas price up 14.3%. A check can move with the field's volume and the price with nothing wrong on the lease. The statement check tells the two apart.
Source: Railroad Commission production reports; U.S. Energy Information Administration prices.
Why is my check lower?
05Who runs the leases in this field now?
Sandlot Oil & Gas LLC is the only operator in this field now, and it runs both producing leases. Its oldest producing lease here is Sims Op. Unit R/A -A-, lease 036292, first reported in January 1993. The field has four leases in total, and two of them are producing.
06How much did the field make in its biggest full calendar year?
The full calendar year that produced the most was 1993. The field made 169,977 mcf of gas and 86 bbl of oil that year, with three leases reporting.
07Who was on the first reports here?
Shannon Energy was the operator on the first reports, back to January 1993, with three leases. Sandlot Oil & Gas LLC is the only operator on the field's reports now.
08How much has the field produced so far in 2026?
Through July 2026, one lease reports 12,187 bbl of oil and 16,472 mcf of gas. The 2026 figures cover only seven months, so they are not a full calendar year.
Royalty calculator

404 months against seven other recordsNew

How much oil and gas has this field made lately?

The whole field is the line on top. Under it, on the same clock: the weather, the price, how many leases reported, new wells, takeovers, State cut-offs and leases that went silent. Move across it.

Oct 2022
75 mcf · down 93.2% on the three months before
Gas averaged $5.66 an mcf · 2 leases reporting
  • PriceThe oil price fell 17.1% the month before, to $84.26 a barrel.
  • PriceThe gas price averaged $5.66 an mcf, down 28.2% on the three months before.
SINCEJAN 1993199520002005201020152020202505,00010,00015,00020,000MCF A MONTHLAST 12 MONTHS123456WEATHERGAS PRICELEASESNEW WELLSTAKEOVERSCUT-OFFSSILENT219941996199820002002200420062008201020122014201620182020202220242026
Six months to look at

Move the pointer or drag across the chart. The numbered buttons jump to each month.

Monthly gas sold from the Mobeetie (Douglas) field since January 1993, with the record tracks beneath it on the same clock. 404 months from January 1993 to August 2026. The most in one month: 19,600 mcf, December 1993. The newest month: 4,049 mcf. 52 months with nothing reported. Moments marked: 1, May 2007; 2, May 2008; 3, May 2012; 4, Jul 2013; 5, Nov 2019; 6, Oct 2022.

SourcesProduction, leases, new wells, takeovers, cut-offs and silent leases: Railroad Commission of Texas. Weather: NOAA Storm Events (file dated Oct 26, 2026) and NOAA daily county lows observed through Feb 21, 2026. Prices: U.S. Energy Information Administration (WTI for oil, Henry Hub for gas). Nothing on record in these months for: new wells. A record in the same month is not proof of a cause. Reported through August 2026. Roll-up counted November 18, 2026.

Royalty Watch tells you the month your own lease starts to drop, with the records from that month.See Royalty Watch

34 years of state records, 1993 to 2026

Sold since January 1993

$5.9 million

What the field's oil and gas sold for at each month's public prices, before tax and the operators' deductions.

Oil sold
17,828barrels
Gas sold
1.34 billioncubic feet
Best year
2005$411,000 sold
Sold each year, at that month's pricesOilGas
Value of oil and gas sold from the Mobeetie (Douglas) field each year from 1993 to 2026
YearOil, dollarsGas, dollarsTotal
1993$1,000$355,000$356,000
1994$4,000$294,000$298,000
1995$5,000$194,000$199,000
1996$3,000$208,000$212,000
1997$5,000$194,000$200,000
1998$2,000$182,000$184,000
1999$0$154,000$154,000
2000$8,000$288,000$296,000
2001$0$215,000$215,000
2002$0$183,000$184,000
2003$2,000$292,000$295,000
2004$0$276,000$277,000
2005$8,000$402,000$411,000, sold the most
2006$5,000$219,000$225,000
2007$0$157,000$157,000
2008$14,000$282,000$297,000
2009$2,000$120,000$122,000
2010$0$76,000$76,000
2011$1,000$37,000$39,000
2012$1,000$5,000$6,000
2013$0$1,000$1,000
2016$0$4,000$4,000
2017$0$10,000$10,000
2018$5,000$18,000$23,000
2019$2,000$30,000$33,000
2020$17,000$43,000$60,000
2021$1,000$29,000$30,000
2022$2,000$61,000$64,000
2023$1,000$14,000$15,000
2024$0$4,000$4,000
2025$0$17,000$17,000
2026, to August$1.3 million$64,000$1.4 million

For research and teaching

Royalty Clerk. “Mobeetie (Douglas) field, Texas.” Data through August 2026, from Railroad Commission of Texas filings. royaltyclerk.com/texas/fields/mobeetie-douglas-62243284.

SourcesRailroad Commission Production Data Query, every monthly report since January 1993. EIA monthly WTI and Henry Hub prices. 2026 is part of a year, drawn lighter. Not a forecast, not reserves. Reported through August 2026.

2 producing leases

Which of the four leases still report?

Most leases in the field are small. The bars show 2 leases that reported oil or gas during the 12 months through August 2026, grouped by gas output. Find your lease and its bar turns blue.

Leases by gas sold, September 2025 to August 2026Mcf in 12 months
0Under 6,0002100%6,000 to 30,000030,000 to 120,0000120,000 to 300,0000300,000 to 600,0000Over 600,000
Producing leases in the Mobeetie (Douglas) field, biggest first
LeaseOperatorCountyGas soldmcf, 12 months to Aug 2026Changeon the 12 before24 monthsAlso on record
MOBEETIE OP UNIT R/A -A-Sandlot Oil & Gas LLC · WheelerSandlot Oil & Gas LLCWheeler15,131 bblNothing else
SIMS OP. UNIT R/A -A-Sandlot Oil & Gas LLC · WheelerSandlot Oil & Gas LLCWheeler10,765▲ 425%4 silent months, 2022Lower tax

SourceTexas Railroad Commission Production Data Query, field 62243284, through August 2026, file dated Oct 20, 2026. 2 more leases are on record and not producing.

1 operator, one county

Who operates the field in Wheeler County?

Sandlot Oil & Gas LLC operates every lease that reported gas in the last 12 months, all in Wheeler County.

By gas in the last 12 months

  1. 1Sandlot Oil & Gas LLC24,116mcf2 leases · 100% of the field's gas · Wheeler

SourceTexas Railroad Commission Production Data Query, operator of record for each lease, through August 2026. Record dated October 20, 2026.

Gas prices and taxNew

The State approved a lower tax on 1 of the 2 leases

$3.59

an mcf, Henry Hub, the average of the 12 months through August 2026, up 14.3% on the 12 before.

The tax office's price for each lease of this field shows here once the Comptroller's records for it arrive. Leases sell at different points and qualities, so their prices differ from the market for ordinary reasons too.

On recordA lower tax is on record

Lower tax approvals in this field

LOW PRODUCING WELLS
1 lease
Newest approval
October 2010

50.0% of the field's producing leases

On those leases the tax line on a statement should show the lower rate. Each lease page says which wells and until when.

Market price$3.59

Henry Hub, the 12 months through August 2026

Operator priceNot on file

No operator here reports a price to investors on file.

Tax-office priceNot on file

Not on file here yet. It shows once the Comptroller's records for this field arrive.

Your statementFrom your stub

The price on your own check stub, set beside these three. Check my statement

SourcesMarket: U.S. Energy Information Administration, Henry Hub. Tax approvals: Texas Comptroller. A lease shows only where the Comptroller's records have arrived. Reported through October 2026. Roll-up counted November 18, 2026.

Watch Plus sets these prices beside the price on each of your statements, every month.See Watch Plus

Who buys the gasNew

Who buys the field's gas

The State lists who buys from each lease. Company filings list who owns whom. Each bar is one operator's gas allocated to its current buyer rows, split by buyer. Each lease's reported production over the field's last 12 months is allocated by the buyer's percent on the Form P-4; where no percent is filed, the lease's current buyers are given equal shares, an estimate. This is an allocation, not a sales record or a metered volume: where a lease has some percents filed and some missing, its allocations can add to more than its production. A lease with no current buyer on file is not counted, so these shares are of the 24,116 mcf allocated across current buyer rows, not of the whole field.

OperatorIts allocated gas, split by buyerBuyers on file
Sandlot Oil & Gas LLCENERGY TRANSFER COMPANY 55.4% · UNIMARK ENERGY LTD. 44.6%

No company filing on file here names a buyer and its operator in the same company, so whether they share an owner is unknown, not none. Buyers as of the Form P-4 record dated Oct 24, 2026.

SourcesAllocation bars: Railroad Commission Form P-4 current purchaser rows, with each lease's reported production over the last 12 months (Railroad Commission production reports) allocated by the buyer's filed percent, or an equal split of the lease where none is filed; only gas on leases with a current buyer on file is counted. An allocation, not a sales record. Ownership: U.S. Securities and Exchange Commission filings and State organization reports. Record dated October 24, 2026. Roll-up counted November 18, 2026.

Royalty Watch tells you the day the buyer of your oil or gas changes.See Royalty Watch

Seen from space, 2025New

No matched night observations on file for the field's leases

Weather satellites pass over Texas every night and record heat on the ground. No night observation in 2025 is matched to this field's leases on file here, and the satellites' coverage of these wells is unverified, so this is not a finding that there was no heat.

Where the field's gas went in 2025, as operators reported it

100%Sold5,010 mcf
0%Used on the lease0 mcf
0%Flared or vented0 mcf

SourcesHeat: VIIRS active fire readings at night from NOAA-20, NOAA-21 and Suomi NPP (NOAA open data), matched to a lease's wells; a GOES-East reading alone never counts as a night. Satellite record read to Nov 16, 2026. Reported flaring and gas use: Railroad Commission production reports. Cloud hides heat, so the count is a floor. The satellite records heat. It does not say what burned. Roll-up counted November 18, 2026.

Watch Plus checks whether you were paid on gas in the months heat was seen at your lease.See Watch Plus

Permits, drilling and fracsNew

1 well on the way

The State approved 1 drilling location in this field in two years. These are the wells the stage records held between a permit and a first month of production on November 18, 2026, one dot for each, at the stage the records showed that day.

Stage 1 of 40

Approved, not started

None identified in these stage records
Stage 2 of 41

Drilling started, no frac on record

On 1 pad
Stage 3 of 40

Fracked, waiting on a report

None identified in these stage records
Stage 4 of 40

Completion filed, no production yet

None identified in these stage records

SourcesPermits, drilling dates and completions: Railroad Commission of Texas. Frac dates: FracFocus chemical disclosure registry. Newest field permit issued Feb 23, 2026. Record dated November 16, 2026. Counted November 18, 2026.

Royalty Watch tells you the day a well on your lease moves to its next stage.See Royalty Watch

Do your Mobeetie checks match the State?

Own minerals here? Add your leases to My leases and see your share of every month.

Example

A whole month was never paid

The State shows 28,175 barrels of oil sold from the lease in the month its operator changed from Operator A to Operator B, so the owner's share is 27.51 barrels. No statement covers that month.

Ask Operator B's owner relations: is that month held in suspense after the change of operator?

$2,277oil and gas

A sample finding, from our example check.

Around this field

Nearby

Where the Mobeetie isCountyWheeler

Newest drilling permits

Related pages

More

Where this page comes from

  • Railroad Commission of Texas production, Form P-4, permits, wells, completions, cut-offs
  • Texas Comptroller tax approvals
  • U.S. Energy Information Administration prices
  • FracFocus frac dates and depths
  • NOAA storms and cold
  • NOAA open data VIIRS night heat (NOAA-20, NOAA-21, Suomi NPP)
  • U.S. Geological Survey photo from the air
  • U.S. Census Bureau county shapes