Texas oil fieldField 76473200District 7BThrough August 2026
Richardson (Marble Falls)Eastland County
The Richardson field sold 510 barrels of oil and 7.35 million cubic feet of gas in the last 12 months, from 1 lease.
In this photoBrakaSurface spot, no path on record
The story, from 398 months of reports
Richardson field: one producing gas lease today
Richardson (Marble Falls) field in Eastland County is a gas field, run today by one company, Braka Operating, L.L.C. Gas made more of the field's output than oil in every full calendar year from 1993 to 2025 except 1993 and 2021, when oil made more.
The field's first reports came from Capitol Operating Co., on record in January 1993, and North Ridge Corporation appears on first reports in 2000 to 2009. Two leases reported in 2003 and 2004. One lease stopped before 2020, and Harrelson, lease 200950, is the one producing lease now.
The full calendar year that produced the most was 2025, with 6,477 mcf of gas and 640 bbl of oil. Gas for the last 12 months, 7,370 mcf, is above that year's gas. The field's one well is not horizontal.
Not a forecast, not reserves.
Key moments
- 2003Harrelson's first report is November 2003; the field's oldest producing lease.
- 2006Oil output reaches 491 bbl and gas 5,188 mcf in one full year.
- 2014Oil output drops to 42 bbl, with gas at 2,037 mcf.
- 2015Oil output rises to 408 bbl from 42 bbl the year before.
- 2021Oil made more of the field's output than gas, an exception after 1993.
- 2025Biggest full calendar year: 640 bbl of oil and 6,477 mcf of gas.
SourceRailroad Commission production reports for every lease filed under field 76473200, March 1993 to August 2026. What the field has sold. Not a forecast, not reserves. Reported through August 2026.
Where the field sits
1 well in Eastland County
Every well the State files under the Richardson, drawn where its records put it. A well with a recorded bottom hole has a line to it. Wells with only a surface location appear as points. Colour the map by the company that operates each well, by how deep it runs, or see where drilling is headed.
Braka
1 operator. It has a colour. Tap a pad to see whose it is, or pick a county.
What is on the map
Drilling locations: counted from the map as it loads
Leases by county
Wells near a town
Open the full well map
- Drilling locations0Permits issued in the last two years
- Producing wells1On a lease reporting production now
- Not producing0Shut in, inactive or no lease on record
- Plugged0The state's wellbore record says plugged
Each dot is a well on a lease the Railroad Commission lists in the Richardson (Marble Falls) field, where its map puts it, or a drilling permit filed for the field in the last 24 months. Wells of other fields are not on this map. The picture is about 6 miles across. The thin brown lines are the original land surveys; where there is room, a survey carries its abstract number, the number deeds and division orders cite. Sources: Railroad Commission of Texas well layers, drilling permit files and survey lines.
Use this map on your site
You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.
<a href="https://royaltyclerk.com/texas/fields/richardson-marble-falls-76473200"><img src="https://royaltyclerk.com/maps/field-wells/richardson-marble-falls-76473200.svg" alt="Map of the wells of the Richardson (Marble Falls) field, Texas: 1 well and 0 recent drilling locations, in a picture about 6 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/fields/richardson-marble-falls-76473200">Oil and gas wells of the Richardson (Marble Falls) field, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>SourcesWells, well paths, operators, permits and drilling dates: Railroad Commission of Texas. Map depth bands: true vertical depth from FracFocus. County lines: U.S. Census Bureau. The dashed line is drawn around the wells; the State keeps no outline for a field. Record dated November 20, 2026. Roll-up counted November 18, 2026.
Watch Private covers the land around yours: it tells you the day a permit or a frac lands within a mile.See Watch Private
From each well's Railroad Commission recordNew
Total depth along the wellbore
Total depth measures the full length of the drilled hole, including bends and horizontal sections. Each tick is one well's total depth on its completion record, shallowest first. The field summary has no true vertical depth from FracFocus.
One well has a total depth on record: 3,967 feet as filed.
feet: the well's completed total depth on record, along the hole as filed. That is 0.75 miles of hole.
well has a completed total depth on record: every well on the field's leases.
Why no rock names: the State's well records give a well's total depth in feet and file the well under its field, not under the rock layer it produces from. So the drawing marks depths, never formations.
SourcesCompleted depth: the total depth on each well's own Railroad Commission well record, matched by API number whatever lease lists the well, one per API number, in whole feet as filed. Completed December 1, 1981 (the earliest completion date on the well's record). 1 of the field's 1 well has a completed total depth on record; a well without one is not drawn.
For mineral owners, from the state record
What Richardson owners ask
- 01What is the Richardson field?
- Richardson (Marble Falls) is the name the Railroad Commission files these leases under: field 76473200, district 7B. The State files every lease under a field. The field on your statement names the rock your wells produce from, not the town they are near.
- Source: Railroad Commission of Texas field list, field 76473200, district 7B.
- See wellbore depths
- 02Is my lease in the Richardson?
- 1 lease reports to this field, in Eastland County. A lease can report to two fields when its wells reach different rock, and then it has a page under each. Search the lease name on your check stub to see which fields it reports to.
- Source: Railroad Commission production reports, field of record for each lease.
- Find my lease
- 03Who pays royalties in the Richardson?
- 1 operator reported production from the field in the last 12 months. The one that pays you is the company named on your check stub. Braka Operating, L.L.C. runs the field's one producing lease.
- Source: Railroad Commission production reports, operator of record.
- See the operator
- 04Why did my Richardson check go down?
- Oil sold▼ 23.9%Oil price▲ 10.4%Gas sold▲ 28.4%Gas price▲ 14.3%
- Across the field, oil sold is down 23.9% on the 12 months before and the oil price is up 10.4%. In the same months gas sold is up 28.4% and the gas price up 14.3%. A check can move with the field's volume and the price with nothing wrong on the lease. The statement check tells the two apart.
- Source: Railroad Commission production reports; U.S. Energy Information Administration prices.
- Why is my check lower?
- 05Who runs this field now?
- Braka Operating, L.L.C. is the only operator in the field's latest reports. It holds 100.0% of the field's output in the last 12 months. Its producing lease is Harrelson, lease number 200950.
- 06How much has this field made in the last 12 months?
- In the last 12 months the field made 7,370 mcf of gas and 524 bbl of oil. Its biggest full calendar year, 2025, made 6,477 mcf of gas and 640 bbl of oil. The last 12 months' gas is above that year's gas.
- 07Does this field make more gas or more oil?
- Gas made more of the field's output than oil in every full calendar year from 1993 to 2025 except 1993 and 2021, when oil made more. Output is counted in barrels of oil equivalent (boe).
- 08Which lease here is the oldest producing one?
- Harrelson, lease number 200950, is the oldest producing lease in the field. Braka Operating, L.L.C. operates it, and its first report is November 2003. Use a survey or abstract number to find the land.
- Find the land on my deed
- 09Is there more than one lease in this field?
- The field has one producing lease now. Another lease was already reporting in January 1993, when Capitol Operating Co. ran it, and it stopped before 2020.
- Mineral interest finder
402 months against seven other recordsNew
How much oil and gas this field made, year by year
The whole field is the line on top. Under it, on the same clock: the weather, the price, how many leases reported, new wells, takeovers, State cut-offs and leases that went silent. Move across it.
Oil averaged $83.90 a barrel · 1 lease reporting
- PriceThe oil price fell 19.8% the month before, to $80.46 a barrel.
Move the pointer or drag across the chart. The numbered buttons jump to each month.
Monthly oil sold from the Richardson (Marble Falls) field since March 1993, with the record tracks beneath it on the same clock. 402 months from March 1993 to August 2026. The most in one month: 134 barrels, May 2025. The newest month: 34 barrels. 75 months with nothing reported. Moments marked: 1, Sep 1993; 2, Jul 1994; 3, May 1995; 4, Aug 1999; 5, Apr 2006; 6, Mar 2007.
SourcesProduction, leases, new wells, takeovers, cut-offs and silent leases: Railroad Commission of Texas. Weather: NOAA Storm Events (file dated Oct 26, 2026) and NOAA daily county lows observed through Feb 21, 2026. Prices: U.S. Energy Information Administration (WTI for oil, Henry Hub for gas). Nothing on record in these months for: new wells, takeovers and cut-offs. A record in the same month is not proof of a cause. Reported through August 2026. Roll-up counted November 18, 2026.
Royalty Watch tells you the month your own lease starts to drop, with the records from that month.See Royalty Watch
34 years of state records, 1993 to 2026
Sold since March 1993
$1.1 million
What the field's oil and gas sold for at each month's public prices, before tax and the operators' deductions.
- Oil sold
- 10,637barrels
- Gas sold
- 131 millioncubic feet
- Best year
- 2022$76,000 sold
| Year | Oil, dollars | Gas, dollars | Total |
|---|---|---|---|
| 1993, to August | $2,000 | $1,000 | $3,000 |
| 1994 | $4,000 | $4,000 | $8,000 |
| 1995 | $4,000 | $6,000 | $10,000 |
| 1996 | $7,000 | $12,000 | $20,000 |
| 1997 | $5,000 | $12,000 | $17,000 |
| 1998 | $3,000 | $9,000 | $12,000 |
| 1999 | $4,000 | $9,000 | $13,000 |
| 2000 | $9,000 | $17,000 | $26,000 |
| 2001 | $5,000 | $13,000 | $19,000 |
| 2002 | $2,000 | $13,000 | $16,000 |
| 2003 | $1,000 | $15,000 | $16,000 |
| 2004 | $12,000 | $14,000 | $26,000 |
| 2005 | $17,000 | $27,000 | $44,000 |
| 2006 | $32,000 | $34,000 | $67,000 |
| 2007 | $25,000 | $34,000 | $59,000 |
| 2008 | $27,000 | $45,000 | $72,000 |
| 2009 | $19,000 | $15,000 | $34,000 |
| 2010 | $17,000 | $13,000 | $30,000 |
| 2011 | $4,000 | $11,000 | $16,000 |
| 2012 | $5,000 | $10,000 | $15,000 |
| 2013 | $13,000 | $11,000 | $24,000 |
| 2014 | $2,000 | $8,000 | $11,000 |
| 2015 | $20,000 | $13,000 | $33,000 |
| 2016 | $18,000 | $10,000 | $29,000 |
| 2017 | $22,000 | $14,000 | $37,000 |
| 2018 | $26,000 | $13,000 | $40,000 |
| 2019 | $28,000 | $12,000 | $40,000 |
| 2020 | $13,000 | $7,000 | $20,000 |
| 2021 | $39,000 | $12,000 | $52,000 |
| 2022 | $53,000 | $22,000 | $76,000, sold the most |
| 2023 | $40,000 | $8,000 | $49,000 |
| 2024 | $40,000 | $7,000 | $48,000 |
| 2025 | $41,000 | $22,000 | $64,000 |
| 2026, to August | $27,000 | $17,000 | $45,000 |
For research and teaching
Royalty Clerk. “Richardson (Marble Falls) field, Texas.” Data through August 2026, from Railroad Commission of Texas filings. royaltyclerk.com/texas/fields/richardson-marble-falls-76473200.
SourcesRailroad Commission Production Data Query, every monthly report since March 1993. EIA monthly WTI and Henry Hub prices. 2026 is part of a year, drawn lighter. Not a forecast, not reserves. Reported through August 2026.
1 producing lease
Which leases in this field are still producing
The lease, its operator and county, and what else the records hold for it.
| Lease | Operator | County | Oil soldbarrels, 12 months to Aug 2026 | Changeon the 12 before | 24 months | Also on record |
|---|---|---|---|---|---|---|
| HARRELSONBraka Operating, L.L.C. · Eastland | Braka Operating, L.L.C. | Eastland | 7,352 mcf | ▲ 28.4% | 3 silent months, 2014Lower tax |
Showing 1 of 1.
Search every Texas leaseSourceTexas Railroad Commission Production Data Query, field 76473200, through August 2026, file dated Oct 20, 2026.
1 operator, one county
Who has run the leases in this field
Braka Operating, L.L.C. operates every lease that reported oil in the last 12 months, all in Eastland County.
By oil in the last 12 months
- 1Braka Operating, L.L.C.510bbl1 lease · 100% of the field's oil · Eastland
SourceTexas Railroad Commission Production Data Query, operator of record for each lease, through August 2026. Record dated October 20, 2026.
Oil prices and taxNew
The State approved a lower tax on 1 of the 1 leases
a barrel, West Texas Intermediate, the average of the 12 months through August 2026, up 10.4% on the 12 before.
The tax office's price for each lease of this field shows here once the Comptroller's records for it arrive. Leases sell at different points and qualities, so their prices differ from the market for ordinary reasons too.
Lower tax approvals in this field
- LOW PRODUCING WELLS
- 1 lease
- Newest approval
- October 2011
100% of the field's producing leases
On those leases the tax line on a statement should show the lower rate. Each lease page says which wells and until when.
West Texas Intermediate, the 12 months through August 2026
No operator here reports a price to investors on file.
Not on file here yet. It shows once the Comptroller's records for this field arrive.
The price on your own check stub, set beside these three. Check my statement
SourcesMarket: U.S. Energy Information Administration, West Texas Intermediate. Tax approvals: Texas Comptroller. A lease shows only where the Comptroller's records have arrived. Reported through October 2026. Roll-up counted November 18, 2026.
Watch Plus sets these prices beside the price on each of your statements, every month.See Watch Plus
Who buys the gasNew
1 lease with a gas purchaser on file
Each bar is one operator's gas allocated to its current buyer rows, split by buyer. Shares use reported production and the State's Form P-4.
No company filing on file here names a buyer and its operator in the same company, so whether they share an owner is unknown, not none. Buyers as of the Form P-4 record dated Oct 24, 2026.
Form P-4 filings and how the shares are calculated
Each lease's reported production over the field's last 12 months is allocated by the buyer's percent on the Form P-4; where no percent is filed, the lease's current buyers are given equal shares, an estimate. This is an allocation, not a sales record or a metered volume: where a lease has some percents filed and some missing, its allocations can add to more than its production. A lease with no current buyer on file is not counted, so these shares are of the 7,352 mcf allocated across current buyer rows, not of the whole field.
Gas purchasers
1 lease across 1 current entry on Form P-4.
- COLT G & P (NORTH TEXAS) L.P. · 1 lease
Common ownership with the operator is unconfirmed in the company records checked.
Latest P-4 source dateGas purchasers buy casinghead gas or gas-well gas. Oil gatherers collect oil for transport. Each lease counts once in each role, even if several companies or gas products are listed. The company lists show up to five parties by lease count. A lease can appear under more than one company.
SourcesAllocation bars: Railroad Commission Form P-4 current purchaser rows, with each lease's reported production over the last 12 months (Railroad Commission production reports) allocated by the buyer's filed percent, or an equal split of the lease where none is filed; only gas on leases with a current buyer on file is counted. An allocation, not a sales record. Ownership: U.S. Securities and Exchange Commission filings and State organization reports. Record dated October 24, 2026. Roll-up counted November 18, 2026.
Royalty Watch tells you the day the buyer of your oil or gas changes.See Royalty Watch
Seen from space, 2025New
No matched night observations on file for the field's leases
Weather satellites pass over Texas every night and record heat on the ground. No night observation in 2025 is matched to this field's leases on file here, and the satellites' coverage of these wells is unverified, so this is not a finding that there was no heat.
Where the field's gas went in 2025, as operators reported it
SourcesHeat: VIIRS active fire readings at night from NOAA-20, NOAA-21 and Suomi NPP (NOAA open data), matched to a lease's wells; a GOES-East reading alone never counts as a night. Satellite record read to Nov 16, 2026. Reported flaring and gas use: Railroad Commission production reports. Cloud hides heat, so the count is a floor. The satellite records heat. It does not say what burned. Roll-up counted November 18, 2026.
Watch Plus checks whether you were paid on gas in the months heat was seen at your lease.See Watch Plus
Well stages
Wells between permit and first production
A comparison of permits, drilling and fracs is unavailable for this field. No drilling permit for this field is among the State permit records read here.
SourceRailroad Commission drilling permits and FracFocus. Checked for the Richardson field. Source date unavailable. Roll-up counted November 18, 2026.
Royalty Watch tells you the day a well on your lease moves to its next stage.See Royalty Watch
Do your Richardson checks match the State?
Own minerals here? Add your leases to My leases and see your share of every month.
Example
A whole month was never paid
The State shows 28,175 barrels of oil sold from the lease in the month its operator changed from Operator A to Operator B, so the owner's share is 27.51 barrels. No statement covers that month.
Ask Operator B's owner relations: is that month held in suspense after the change of operator?
$2,277oil and gas
A sample finding, from our example check.
Around this field
Nearby
Fields nearby
- Eastland County Regular67 leases
- Eastland County Regular (Gas)60 leases
- Reb (Marble Falls)49 leases
- Desdemona42 leases
- Foster (Marble Falls)17 leases
Towns
- Cisco1 well within 10 miles
Related pages
- Braka Operating, L.L.C.Braka Operating, L.L.C. runs the field's one producing lease now.
- Eastland CountyEastland County is the only county listed for this field.
- HarrelsonHarrelson, lease 200950, is the oldest producing lease in this field.
More
- Texas fields, A to ZEvery field with producing leases in Railroad Commission records.
- Check a stub against a leaseMatch the barrels and mcf on your stub to the state record.
Where this page comes from
- Railroad Commission of Texas production, Form P-4, permits, wells, completions, cut-offs
- Texas Comptroller tax approvals
- U.S. Energy Information Administration prices
- NOAA storms and cold
- NOAA open data VIIRS night heat (NOAA-20, NOAA-21, Suomi NPP)
- U.S. Geological Survey photo from the air
- U.S. Census Bureau county shapes