Skip to content
THE PHILIP JENKINSN1 mile35.9664° N 101.2328° W · 2 MILES OF THE FIELD · PHOTO: U.S. GEOLOGICAL SURVEY

Texas gas fieldField 83372400District 10Through July 2026

Shirley (Marmaton)Hutchinson County

The Shirley field sold 762 mcf of gas and 6 barrels of oil in the last 12 months, from 2 leases.

Each mark on the photo is one well’s surface spot

Is your lease in the Shirley?

Email me when a Shirley lease changes

In this photoBatton Oil &Surface spot, no path on record

Gas, last 12 months
762 mcf
Oil, last 12 months
6 bbl
Producing leases
2
Producing wells
1
Operators
2
County
1
Eight things the public record says about this field; seven have records on file here. Each one sets two records side by side, and one that finds nothing still shows and says so. Photo: U.S. Geological Survey.

The story, from 292 months of reports

How the Shirley grew from one lease to two

Gas sold each month since April 2002
5,00010K15,000 mcf a month2005201020152020202512Sold the mostAPR 2003
  1. April 2002First gas. One lease reported 10,394 mcf that month.
  2. April 2003Sold the most. 19,545 mcf, the most in one month since April 2002.
  3. The last 12 monthsIn the 12 months through July 2026 the field sold 762 mcf, down 23.6% on the 12 months before.

SourceRailroad Commission production reports for every lease filed under field 83372400, April 2002 to July 2026. What the field has sold. Not a forecast, not reserves. Reported through July 2026.

Where the field sits

1 well in Hutchinson County

Every well the State files under the Shirley, drawn where its records put it. A well with a recorded bottom hole has a line to it. Wells with only a surface location appear as points. Colour the map by the company that operates each well, by how deep it runs, or see where drilling is headed.

New layers
Loading the wells…

Batton Oil &Home

2 operators. Each has a colour. Tap a pad to see whose it is, or pick a county.

What is on the map

0sideways wells
1wells with no path on record

Drilling locations: counted from the map as it loads

Leases by county

Open the full well map
Map of the wells of the Shirley (Marmaton) field, Texas: 1 well and 0 recent drilling locations, in a picture about 6 miles across.
  • Drilling locations0Permits issued in the last two years
  • Producing wells1On a lease reporting production now
  • Not producing0Shut in, inactive or no lease on record
  • Plugged0The state's wellbore record says plugged

Each dot is a well on a lease the Railroad Commission lists in the Shirley (Marmaton) field, where its map puts it, or a drilling permit filed for the field in the last 24 months. Wells of other fields are not on this map. The picture is about 6 miles across. The thin brown lines are the original land surveys; where there is room, a survey carries its abstract number, the number deeds and division orders cite. Sources: Railroad Commission of Texas well layers, drilling permit files and survey lines.

See the whole Texas well map

Use this map on your site

You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.

Download the picture (WebP)
<a href="https://royaltyclerk.com/texas/fields/shirley-marmaton-83372400"><img src="https://royaltyclerk.com/maps/field-wells/shirley-marmaton-83372400.svg" alt="Map of the wells of the Shirley (Marmaton) field, Texas: 1 well and 0 recent drilling locations, in a picture about 6 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/fields/shirley-marmaton-83372400">Oil and gas wells of the Shirley (Marmaton) field, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>

SourcesWells, well paths, operators, permits and drilling dates: Railroad Commission of Texas. Map depth bands: true vertical depth from FracFocus. County lines: U.S. Census Bureau. The dashed line is drawn around the wells; the State keeps no outline for a field. Record dated November 17, 2026. Roll-up counted November 18, 2026.

Watch Private covers the land around yours: it tells you the day a permit or a frac lands within a mile.See Watch Private

From each well's Railroad Commission recordNew

Total depth along the wellbore

Total depth measures the full length of the drilled hole, including bends and horizontal sections. Each tick is one well's total depth on its completion record, shallowest first. The field summary has no true vertical depth from FracFocus.

EACH WELL'S TOTAL DEPTH AS FILED, SHALLOWEST TO DEEPEST0 ft2,0004,0006,0008,000THE MIDDLE: 7,788 FEETTHE DEEPEST: 7,855 FEET

2 wells have a total depth on record, from 7,721 to 7,855 feet as filed; the middle of them is 7,788 feet. Each tick is one well.

7,788

feet: the middle of the completed total depths on record, along the hole as filed. That is 1.48 miles of hole.

7,855

feet: the deepest completed total depth on record.

2

wells have a completed total depth on record: every well on the field's leases.

Why no rock names: the State's well records give a well's total depth in feet and file the well under its field, not under the rock layer it produces from. So the drawing marks depths, never formations.

SourcesCompleted depth: the total depth on each well's own Railroad Commission well record, matched by API number whatever lease lists the well, one per API number, in whole feet as filed. Completed May 6, 1985 to November 4, 1985 (the earliest completion date on each well's record). 2 of the field's 2 wells have a completed total depth on record; a well without one is not drawn.

For mineral owners, from the state record

What Shirley owners ask

01What is the Shirley field?
Shirley (Marmaton) is the name the Railroad Commission files these leases under: field 83372400, district 10. The State files every lease under a field. The field on your statement names the rock your wells produce from, not the town they are near.
Source: Railroad Commission of Texas field list, field 83372400, district 10.
See wellbore depths
02Is my lease in the Shirley?
2 leases report to this field, in Hutchinson County. A lease can report to two fields when its wells reach different rock, and then it has a page under each. Search the lease name on your check stub to see which fields it reports to.
Source: Railroad Commission production reports, field of record for each lease.
Find my lease
03Who pays royalties in the Shirley?
2 operators reported production from the field in the last 12 months. The one that pays you is the company named on your check stub. Batton Oil & Gas, LLC runs the most leases, 1 of the 2.
Source: Railroad Commission production reports, operator of record.
See all 2 operators
04Why did my Shirley check go down?
Across the field, gas sold is down 23.6% and the gas price up 17.5%. A check can move with the field's volume and the price with nothing wrong on the lease. The statement check tells the two apart.
Source: Railroad Commission production reports; U.S. Energy Information Administration prices.
Why is my check lower?

292 months against seven other recordsNew

Every month since April 2002, and what else happened that month

The whole field is the line on top. Under it, on the same clock: the weather, the price, how many leases reported, new wells, takeovers, State cut-offs and leases that went silent. Move across it.

Jul 2026
54 mcf · level with the three months before
Gas averaged $2.89 an mcf · 2 leases reporting
  • WeatherFlash flood, July 4.
  • PriceThe oil price averaged $80.46 a barrel, down 19.8% on the three months before.
SINCEAPR 20022005201020152020202505,00010,00015,00020,000MCF A MONTHLAST 12 MONTHS123456WEATHERGAS PRICELEASESNEW WELLSTAKEOVERSCUT-OFFSSILENT2200420062008201020122014201620182020202220242026
Six months to look at

Move the pointer or drag across the chart. The numbered buttons jump to each month.

Monthly gas sold from the Shirley (Marmaton) field since April 2002, with the record tracks beneath it on the same clock. 292 months from April 2002 to July 2026. The most in one month: 19,545 mcf, April 2003. The newest month: 54 mcf. 1 month with nothing reported. Moments marked: 1, Nov 2002; 2, Sep 2003; 3, Feb 2004; 4, Sep 2004; 5, Apr 2007; 6, Sep 2009.

SourcesProduction, leases, new wells, takeovers, cut-offs and silent leases: Railroad Commission of Texas. Weather: NOAA Storm Events (file dated Oct 26, 2026) and NOAA daily county lows observed through Feb 21, 2026. Prices: U.S. Energy Information Administration (WTI for oil, Henry Hub for gas). Nothing on record in these months for: new wells. A record in the same month is not proof of a cause. Reported through July 2026. Roll-up counted November 18, 2026.

Royalty Watch tells you the month your own lease starts to drop, with the records from that month.See Royalty Watch

25 years of state records, 2002 to 2026

Sold since April 2002

$5.2 million

What the field's oil and gas sold for at each month's public prices, before tax and the operators' deductions.

Oil sold
7,983barrels
Gas sold
865 millioncubic feet
Best year
2003$922,000 sold
Sold each year, at that month's pricesOilGas
Value of oil and gas sold from the Shirley (Marmaton) field each year from 2002 to 2026
YearOil, dollarsGas, dollarsTotal
2002, to July$39,000$405,000$444,000
2003$32,000$890,000$922,000, sold the most
2004$37,000$729,000$766,000
2005$40,000$817,000$858,000
2006$32,000$501,000$534,000
2007$38,000$396,000$434,000
2008$41,000$453,000$495,000
2009$19,000$150,000$170,000
2010$16,000$134,000$151,000
2011$26,000$118,000$145,000
2012$17,000$65,000$82,000
2013$1,000$32,000$34,000
2014$5,000$27,000$33,000
2015$13,000$37,000$51,000
2016$12,000$31,000$43,000
2017$5,000$29,000$34,000
2018$12,000$32,000$44,000
2019$9,000$4,000$13,000
2020$4,000$2,000$7,000
2021$0$0$0
2022$0$1,000$1,000
2023$12,000$3,000$15,000
2024$5,000$1,000$7,000
2025$0$3,000$3,000
2026, to July$0$1,000$1,000

For research and teaching

Royalty Clerk. “Shirley (Marmaton) field, Texas.” Data through July 2026, from Railroad Commission of Texas filings. royaltyclerk.com/texas/fields/shirley-marmaton-83372400.

SourcesRailroad Commission Production Data Query, every monthly report since April 2002. EIA monthly WTI and Henry Hub prices. 2026 is part of a year, drawn lighter. Not a forecast, not reserves. Reported through July 2026.

Lease output over 12 months

The biggest leases, and where yours sits

Most reporting leases are in the smaller size groups. The bars show 2 leases that reported oil or gas during the 12 months through July 2026, grouped by gas output. Pick a lease in the table to highlight its group. The table draws from the 2 leases counted as currently producing based on recent state filings.

Leases by gas sold, August 2025 to July 2026Mcf in 12 months
2100%Under 6,00006,000 to 30,000030,000 to 120,0000120,000 to 300,0000300,000 to 600,0000Over 600,000
Producing leases in the Shirley (Marmaton) field, biggest first
LeaseOperatorCountyGas soldmcf, 12 months to Jul 2026Changeon the 12 before24 monthsAlso on record
THE PHILIP JENKINSBatton Oil & Gas, LLC · HutchinsonBatton Oil & Gas, LLCHutchinson471▼ 36.3%24 silent months, 2021
COMANCHEHome Petroleum Corp. · HutchinsonHome Petroleum Corp.Hutchinson306▲ 12.8%2 silent months, 2023

SourceTexas Railroad Commission Production Data Query, field 83372400, through July 2026, file dated Oct 20, 2026.

2 operators, one county

Who runs the Shirley

Each box is one operator's gas from one county in the last 12 months, drawn to size. The two biggest operators keep the colours they have on the map.

Gas sold, August 2025 to July 2026, by county and operatorMcf
HUTCHINSON COUNTY · 2 LEASES · 762 MCF · 100%HUTCHINSON COUNTY · 762 MCF · 100%HUTCHINSON · 100%HUTCHINSON

By gas in the last 12 months

  1. 1Batton Oil & Gas, LLC471mcf1 lease · 61.8% of the field's gas · Hutchinson
  2. 2Home Petroleum Corp.291mcf1 lease · 38.2% of the field's gas · Hutchinson

SourceTexas Railroad Commission Production Data Query, operator of record for each lease, through July 2026. Record dated October 20, 2026.

Gas prices and taxNew

What gas sold for in the 12 months through July 2026

$3.60

an mcf, Henry Hub, the average of the 12 months through July 2026, up 17.5% on the 12 before.

The tax office's price for each lease of this field shows here once the Comptroller's records for it arrive. Leases sell at different points and qualities, so their prices differ from the market for ordinary reasons too.

Market price$3.60

Henry Hub, the 12 months through July 2026

Operator priceNot on file

No operator here reports a price to investors on file.

Tax-office priceNot on file

Not on file here yet. It shows once the Comptroller's records for this field arrive.

Your statementFrom your stub

The price on your own check stub, set beside these three. Check my statement

SourcesMarket: U.S. Energy Information Administration, Henry Hub. A lease shows only where the Comptroller's records have arrived. Reported through October 2026. Roll-up counted November 18, 2026.

Watch Plus sets these prices beside the price on each of your statements, every month.See Watch Plus

Who buys the gasNew

2 leases with a gas purchaser on file

Each bar is one operator's gas allocated to its current buyer rows, split by buyer. Shares use reported production and the State's Form P-4.

OperatorIts allocated gas, split by buyerBuyers on file
Batton Oil & Gas, LLCDCP OPERATING COMPANY, LP 100%
Home Petroleum Corp.DCP OPERATING COMPANY, LP 100%

No company filing on file here names a buyer and its operator in the same company, so whether they share an owner is unknown, not none. Buyers as of the Form P-4 record dated Oct 24, 2026.

Form P-4 filings and how the shares are calculated

Each lease's reported production over the field's last 12 months is allocated by the buyer's percent on the Form P-4; where no percent is filed, the lease's current buyers are given equal shares, an estimate. This is an allocation, not a sales record or a metered volume: where a lease has some percents filed and some missing, its allocations can add to more than its production. A lease with no current buyer on file is not counted, so these shares are of the 762 mcf allocated across current buyer rows, not of the whole field.

Gas purchasers

2 leases across 2 current entries on Form P-4.

  1. DCP OPERATING COMPANY, LP · 2 leases

Common ownership with the operator is unconfirmed in the company records checked.

Latest P-4 source date

Gas purchasers buy casinghead gas or gas-well gas. Oil gatherers collect oil for transport. Each lease counts once in each role, even if several companies or gas products are listed. The company lists show up to five parties by lease count. A lease can appear under more than one company.

SourcesAllocation bars: Railroad Commission Form P-4 current purchaser rows, with each lease's reported production over the last 12 months (Railroad Commission production reports) allocated by the buyer's filed percent, or an equal split of the lease where none is filed; only gas on leases with a current buyer on file is counted. An allocation, not a sales record. Ownership: U.S. Securities and Exchange Commission filings and State organization reports. Record dated October 24, 2026. Roll-up counted November 18, 2026.

Royalty Watch tells you the day the buyer of your oil or gas changes.See Royalty Watch

Seen from space, 2025New

No matched night observations on file for the field's leases

Weather satellites pass over Texas every night and record heat on the ground. No night observation in 2025 is matched to this field's leases on file here, and the satellites' coverage of these wells is unverified, so this is not a finding that there was no heat.

Where the field's gas went in 2025, as operators reported it

83.9%Sold814 mcf
16.1%Used on the lease156 mcf
0%Flared or vented0 mcf

SourcesHeat: VIIRS active fire readings at night from NOAA-20, NOAA-21 and Suomi NPP (NOAA open data), matched to a lease's wells; a GOES-East reading alone never counts as a night. Satellite record read to Nov 16, 2026. Reported flaring and gas use: Railroad Commission production reports. Cloud hides heat, so the count is a floor. The satellite records heat. It does not say what burned. Roll-up counted November 18, 2026.

Watch Plus checks whether you were paid on gas in the months heat was seen at your lease.See Watch Plus

Well stages

Wells between permit and first production

A comparison of permits, drilling and fracs is unavailable for this field. No drilling permit for this field is among the State permit records read here.

Permitted
Drilling
Fracked
Completed

SourceRailroad Commission drilling permits and FracFocus. Checked for the Shirley field. Source date unavailable. Roll-up counted November 18, 2026.

Royalty Watch tells you the day a well on your lease moves to its next stage.See Royalty Watch

Do your Shirley checks match the State?

Own minerals here? Add your leases to My leases and see your share of every month.

Example

A whole month was never paid

The State shows 28,175 barrels of oil sold from the lease in the month its operator changed from Operator A to Operator B, so the owner's share is 27.51 barrels. No statement covers that month.

Ask Operator B's owner relations: is that month held in suspense after the change of operator?

$2,277oil and gas

A sample finding, from our example check.

Around this field

Nearby

Where the Shirley isCountyHutchinson

More

Where this page comes from

  • Railroad Commission of Texas production, Form P-4, permits, wells, completions, cut-offs
  • U.S. Energy Information Administration prices
  • NOAA storms and cold
  • NOAA open data VIIRS night heat (NOAA-20, NOAA-21, Suomi NPP)
  • U.S. Geological Survey photo from the air
  • U.S. Census Bureau county shapes