Texas gas fieldField 90620529District 03Through July 2026
Tomball (Miocene 2400)Harris County
The Tomball field sold 166 mcf of gas in the last 12 months, from 1 lease.
In this photoTortugaSurface spot, no path on record
The story, from 396 months of reports
How Tomball (Miocene 2400) went from four gas leases to one
Tomball (Miocene 2400) is a gas field in Harris County with one producing lease, run by Tortuga Operating Company. Tortuga runs all of the field's current output. The field's biggest full calendar year was 2001, with 102,711 mcf of gas from four leases. Oil appears in the reports only in 1995 and 1996, with 169 and 153 barrels. In 2009 the number of leases reporting fell to two. Gas made more of the field's output than oil in every full calendar year from 1993 to 2025 except 1994, when there was no output.
Not a forecast, not reserves.
Key moments
- 1995First oil reported: 169 barrels, with 18,193 mcf of gas
- 1999Gas reaches 48,669 mcf, with three leases reporting
- 2001Biggest full calendar year: 102,711 mcf of gas, four leases
- 2009Leases reporting fall to two; gas at 20,883 mcf
- 2023Gas rises to 800 mcf after several years of a few hundred
SourceRailroad Commission production reports for every lease filed under field 90620529, August 1993 to July 2026. What the field has sold. Not a forecast, not reserves. Reported through July 2026.
Where the field sits
2 wells in Harris County
Every well the State files under the Tomball, drawn where its records put it. A well with a recorded bottom hole has a line to it. Wells with only a surface location appear as points. Colour the map by the company that operates each well, by how deep it runs, or see where drilling is headed.
Tortuga
1 operator. It has a colour. Tap a pad to see whose it is, or pick a county.
About 2 miles from west to east
What is on the map
Drilling locations: counted from the map as it loads
Leases by county
Wells near a town
Open the full well map
- Drilling locations0Permits issued in the last two years
- Producing wells1On a lease reporting production now
- Not producing1Shut in, inactive or no lease on record
- Plugged0The state's wellbore record says plugged
Each dot is a well on a lease the Railroad Commission lists in the Tomball (Miocene 2400) field, where its map puts it, or a drilling permit filed for the field in the last 24 months. Wells of other fields are not on this map. The picture is about 10 miles across. The white counties are the ones with a well or drilling permit of the field on the map. The thin brown lines are the original land surveys; where there is room, a survey carries its abstract number, the number deeds and division orders cite. Sources: Railroad Commission of Texas well layers, drilling permit files and survey lines, US Census Bureau county outlines, town points from GeoNames (CC BY 4.0).
Use this map on your site
You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.
<a href="https://royaltyclerk.com/texas/fields/tomball-miocene-2400-90620529"><img src="https://royaltyclerk.com/maps/field-wells/tomball-miocene-2400-90620529.svg" alt="Map of the wells of the Tomball (Miocene 2400) field, Texas: 2 wells and 0 recent drilling locations, in a picture about 10 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/fields/tomball-miocene-2400-90620529">Oil and gas wells of the Tomball (Miocene 2400) field, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>SourcesWells, well paths, operators, permits and drilling dates: Railroad Commission of Texas. Map depth bands: true vertical depth from FracFocus. County lines: U.S. Census Bureau. The dashed line is drawn around the wells; the State keeps no outline for a field. Record dated November 17, 2026. Roll-up counted November 18, 2026.
Watch Private covers the land around yours: it tells you the day a permit or a frac lands within a mile.See Watch Private
From each well's Railroad Commission recordNew
Total depth along the wellbore
Total depth measures the full length of the drilled hole, including bends and horizontal sections. Each tick is one well's total depth on its completion record, shallowest first. The field summary has no true vertical depth from FracFocus.
2 wells have a total depth on record, from 5,579 to 5,650 feet as filed; the middle of them is 5,615 feet. Each tick is one well.
feet: the middle of the completed total depths on record, along the hole as filed. That is 1.06 miles of hole.
feet: the deepest completed total depth on record.
wells have a completed total depth on record: every well on the field's leases.
Why no rock names: the State's well records give a well's total depth in feet and file the well under its field, not under the rock layer it produces from. So the drawing marks depths, never formations.
SourcesCompleted depth: the total depth on each well's own Railroad Commission well record, matched by API number whatever lease lists the well, one per API number, in whole feet as filed. Completed May 21, 1981 to August 15, 1989 (the earliest completion date on each well's record). 2 of the field's 2 wells have a completed total depth on record; a well without one is not drawn.
For mineral owners, from the state record
What Tomball owners ask
- 01What is the Tomball field?
- Tomball (Miocene 2400) is the name the Railroad Commission files these leases under: field 90620529, district 03. The State files every lease under a field. The field on your statement names the rock your wells produce from, not the town they are near.
- Source: Railroad Commission of Texas field list, field 90620529, district 03.
- See wellbore depths
- 02Is my lease in the Tomball?
- 1 lease reports to this field, in Harris County. A lease can report to two fields when its wells reach different rock, and then it has a page under each. Another 1 lease is on record and not producing. Search the lease name on your check stub to see which fields it reports to.
- Source: Railroad Commission production reports, field of record for each lease.
- Find my lease
- 03Who pays royalties in the Tomball?
- 1 operator reported production from the field in the last 12 months. The one that pays you is the company named on your check stub. Tortuga Operating Company runs the field's one producing lease.
- Source: Railroad Commission production reports, operator of record.
- See the operator
- 04Why did my Tomball check change?
- Gas sold▲ 31.7%Gas price▲ 17.5%
- Across the field, gas sold is up 31.7% and the gas price up 17.5%. A check can move with the field's volume and the price with nothing wrong on the lease. The statement check tells the two apart.
- Source: Railroad Commission production reports; U.S. Energy Information Administration prices.
- Why is my check lower?
- 05Who runs the one producing lease in this field now?
- Tortuga Operating Company runs the field's one producing lease and all of its current output. Tortuga is also the operator on the first report of the two leases that started from 1993 to 1999, and of the two that started from 2000 to 2009.
- 06Why does Exxon Corp. appear in this field's record?
- The state's monthly history reaches back to January 1993. In that month one lease in this field was already on record, and Exxon Corp. was its operator. Tortuga is the only operator listed for the field now.
- 07Is there any oil from this field?
- No oil leases are listed here. The reports show oil only in 1995, with 169 barrels, and in 1996, with 153 barrels. Gas made more of the field's output than oil in every full calendar year except 1994, when there was no output.
- 08Which lease here is the oldest producing one?
- Petrich, Theresa, lease 213934, is the oldest producing lease in the field. Its first monthly report is October 2005, and Tortuga Operating Company is its operator. Its survey or abstract number can be found on a survey map.
- Find the land on my deed
396 months against seven other recordsNew
Every month since August 1993, and what else happened that month
The whole field is the line on top. Under it, on the same clock: the weather, the price, how many leases reported, new wells, takeovers, State cut-offs and leases that went silent. Move across it.
Gas averaged $2.89 an mcf · 1 lease reporting
- PriceThe oil price averaged $80.46 a barrel, down 19.8% on the three months before.
Move the pointer or drag across the chart. The numbered buttons jump to each month.
Monthly gas sold from the Tomball (Miocene 2400) field since August 1993, with the record tracks beneath it on the same clock. 396 months from August 1993 to July 2026. The most in one month: 9,778 mcf, March 2001. The newest month: 15 mcf. 46 months with nothing reported. Moments marked: 1, Oct 1997; 2, Jun 1999; 3, Mar 2000; 4, Jul 2002; 5, Sep 2003; 6, Feb 2006.
SourcesProduction, leases, new wells, takeovers, cut-offs and silent leases: Railroad Commission of Texas. Weather: NOAA Storm Events (file dated Oct 26, 2026) and NOAA daily county lows observed through Feb 21, 2026. Prices: U.S. Energy Information Administration (WTI for oil, Henry Hub for gas). Nothing on record in these months for: new wells and takeovers. A record in the same month is not proof of a cause. Reported through July 2026. Roll-up counted November 18, 2026.
Royalty Watch tells you the month your own lease starts to drop, with the records from that month.See Royalty Watch
34 years of state records, 1993 to 2026
Sold since August 1993
$2.5 million
What the field's oil and gas sold for at each month's public prices, before tax and the operators' deductions.
- Oil sold
- 322barrels
- Gas sold
- 536 millioncubic feet
- Best year
- 2001$421,000 sold
| Year | Oil, dollars | Gas, dollars | Total |
|---|---|---|---|
| 1993, to July | $0 | $4,000 | $4,000 |
| 1995 | $2,000 | $29,000 | $32,000 |
| 1996 | $3,000 | $14,000 | $17,000 |
| 1997 | $0 | $14,000 | $14,000 |
| 1998 | $0 | $1,000 | $1,000 |
| 1999 | $0 | $106,000 | $106,000 |
| 2000 | $0 | $70,000 | $70,000 |
| 2001 | $0 | $421,000 | $421,000, sold the most |
| 2002 | $0 | $234,000 | $234,000 |
| 2003 | $0 | $369,000 | $369,000 |
| 2004 | $0 | $157,000 | $157,000 |
| 2005 | $0 | $316,000 | $316,000 |
| 2006 | $0 | $196,000 | $196,000 |
| 2007 | $0 | $226,000 | $226,000 |
| 2008 | $0 | $189,000 | $189,000 |
| 2009 | $0 | $81,000 | $81,000 |
| 2010 | $0 | $32,000 | $32,000 |
| 2011 | $0 | $30,000 | $30,000 |
| 2012 | $0 | $12,000 | $12,000 |
| 2013 | $0 | $14,000 | $14,000 |
| 2014 | $0 | $14,000 | $14,000 |
| 2015 | $0 | $6,000 | $6,000 |
| 2016 | $0 | $5,000 | $5,000 |
| 2017 | $0 | $1,000 | $1,000 |
| 2018 | $0 | $1,000 | $1,000 |
| 2019 | $0 | $1,000 | $1,000 |
| 2020 | $0 | $0 | $0 |
| 2021 | $0 | $1,000 | $1,000 |
| 2022 | $0 | $2,000 | $2,000 |
| 2023 | $0 | $1,000 | $1,000 |
| 2024 | $0 | $0 | $0 |
| 2025 | $0 | $0 | $0 |
| 2026, to July | $0 | $0 | $0 |
For research and teaching
Royalty Clerk. “Tomball (Miocene 2400) field, Texas.” Data through July 2026, from Railroad Commission of Texas filings. royaltyclerk.com/texas/fields/tomball-miocene-2400-90620529.
SourcesRailroad Commission Production Data Query, every monthly report since August 1993. EIA monthly WTI and Henry Hub prices. 2026 is part of a year, drawn lighter. Not a forecast, not reserves. Reported through July 2026.
1 producing lease
Which leases here are still producing
The lease, its operator and county, and what else the records hold for it.
| Lease | Operator | County | Gas soldmcf, 12 months to Jul 2026 | Changeon the 12 before | 24 months | Also on record |
|---|---|---|---|---|---|---|
| PETRICH, THERESATortuga Operating Company · Harris | Tortuga Operating Company | Harris | 166 mcf | ▲ 31.7% | Buyer, officer in commonLower tax |
Showing 1 of 1.
Search every Texas leaseSourceTexas Railroad Commission Production Data Query, field 90620529, through July 2026, file dated Oct 20, 2026. 1 more lease is on record and not producing.
1 operator, one county
Who has run the leases in this field
Tortuga Operating Company operates every lease that reported gas in the last 12 months, all in Harris County.
By gas in the last 12 months
- 1Tortuga Operating Company166mcf1 lease · 100% of the field's gas · Harris
SourceTexas Railroad Commission Production Data Query, operator of record for each lease, through July 2026. Record dated October 20, 2026.
Gas prices and taxNew
The State approved a lower tax on 1 of the 1 leases
an mcf, Henry Hub, the average of the 12 months through July 2026, up 17.5% on the 12 before.
The tax office's price for each lease of this field shows here once the Comptroller's records for it arrive. Leases sell at different points and qualities, so their prices differ from the market for ordinary reasons too.
Lower tax approvals in this field
- LOW PRODUCING WELLS
- 1 lease
- Newest approval
- June 2012
100% of the field's producing leases
On those leases the tax line on a statement should show the lower rate. Each lease page says which wells and until when.
Henry Hub, the 12 months through July 2026
No operator here reports a price to investors on file.
Not on file here yet. It shows once the Comptroller's records for this field arrive.
The price on your own check stub, set beside these three. Check my statement
SourcesMarket: U.S. Energy Information Administration, Henry Hub. Tax approvals: Texas Comptroller. A lease shows only where the Comptroller's records have arrived. Reported through October 2026. Roll-up counted November 18, 2026.
Watch Plus sets these prices beside the price on each of your statements, every month.See Watch Plus
Who buys the gasNew
2 leases with a gas purchaser on file
Each bar is one operator's gas allocated to its current buyer rows, split by buyer. Shares use reported production and the State's Form P-4.
No company filing on file here names a buyer and its operator in the same company, so whether they share an owner is unknown, not none. Buyers as of the Form P-4 record dated Oct 24, 2026.
Form P-4 filings and how the shares are calculated
Each lease's reported production over the field's last 12 months is allocated by the buyer's percent on the Form P-4; where no percent is filed, the lease's current buyers are given equal shares, an estimate. This is an allocation, not a sales record or a metered volume: where a lease has some percents filed and some missing, its allocations can add to more than its production. A lease with no current buyer on file is not counted, so these shares are of the 166 mcf allocated across current buyer rows, not of the whole field.
Where the State's P-5 records show the buyer and the operator with an officer or an address in common, the row says so. That is not common ownership.
Gas purchasers
2 leases across 2 current entries on Form P-4.
- PELICAN RESERVE PIPELINE COMPANY · 2 leases
Common ownership with the operator is unconfirmed in the company records checked.
Latest P-4 source dateGas purchasers buy casinghead gas or gas-well gas. Oil gatherers collect oil for transport. Each lease counts once in each role, even if several companies or gas products are listed. The company lists show up to five parties by lease count. A lease can appear under more than one company.
SourcesAllocation bars: Railroad Commission Form P-4 current purchaser rows, with each lease's reported production over the last 12 months (Railroad Commission production reports) allocated by the buyer's filed percent, or an equal split of the lease where none is filed; only gas on leases with a current buyer on file is counted. An allocation, not a sales record. Ownership: U.S. Securities and Exchange Commission filings and State organization reports. Record dated October 24, 2026. Roll-up counted November 18, 2026.
Royalty Watch tells you the day the buyer of your oil or gas changes.See Royalty Watch
Seen from space, 2025New
No matched night observations on file for the field's leases
Weather satellites pass over Texas every night and record heat on the ground. No night observation in 2025 is matched to this field's leases on file here, and the satellites' coverage of these wells is unverified, so this is not a finding that there was no heat.
Where the field's gas went in 2025, as operators reported it
SourcesHeat: VIIRS active fire readings at night from NOAA-20, NOAA-21 and Suomi NPP (NOAA open data), matched to a lease's wells; a GOES-East reading alone never counts as a night. Satellite record read to Nov 16, 2026. Reported flaring and gas use: Railroad Commission production reports. Cloud hides heat, so the count is a floor. The satellite records heat. It does not say what burned. Roll-up counted November 18, 2026.
Watch Plus checks whether you were paid on gas in the months heat was seen at your lease.See Watch Plus
Well stages
Wells between permit and first production
A comparison of permits, drilling and fracs is unavailable for this field. No drilling permit for this field is among the State permit records read here.
SourceRailroad Commission drilling permits and FracFocus. Checked for the Tomball field. Source date unavailable. Roll-up counted November 18, 2026.
Royalty Watch tells you the day a well on your lease moves to its next stage.See Royalty Watch
Do your Tomball checks match the State?
Own minerals here? Add your leases to My leases and see your share of every month.
Example
A whole month was never paid
The State shows 28,175 barrels of oil sold from the lease in the month its operator changed from Operator A to Operator B, so the owner's share is 27.51 barrels. No statement covers that month.
Ask Operator B's owner relations: is that month held in suspense after the change of operator?
$2,277oil and gas
A sample finding, from our example check.
Around this field
Nearby
Fields nearby
- Goose Creek25 leases
- Milton, N. (13000)13 leases
- Tomball (Schultz Se.)10 leases
- Cross Creek (Wilcox)7 leases
- Pierce Junction6 leases
Towns
- Cypress2 wells within 10 miles
- Pinehurst2 wells within 10 miles
- Tomball2 wells within 10 miles
- Oak Cliff Place1 well within 10 miles
Related pages
- Tortuga Operating CompanyTortuga Operating Company runs all of the field's current output.
- Petrich, TheresaOldest producing lease here, first monthly report October 2005.
- Harris CountyHarris County, the one county this field sits in.
More
- Texas fields, A to ZEvery field with producing leases in Railroad Commission records.
- Check a stub against a leaseMatch the barrels and mcf on your stub to the state record.
Where this page comes from
- Railroad Commission of Texas production, Form P-4, permits, wells, completions, cut-offs
- Texas Comptroller tax approvals
- U.S. Energy Information Administration prices
- NOAA storms and cold
- NOAA open data VIIRS night heat (NOAA-20, NOAA-21, Suomi NPP)
- U.S. Geological Survey photo from the air
- U.S. Census Bureau county shapes