Skip to content
TROPORO,NORTH (DEV) UNITN1 mile31.2931° N 102.7587° W · 2.3 MILES OF THE FIELD · PHOTO: U.S. GEOLOGICAL SURVEY

Texas oil fieldField 91455500District 08Through August 2026

Troporo, N (Devonian)Crane County

The Troporo, N field sold 12,430 barrels of oil and 12.4 million cubic feet of gas in the last 12 months, from 1 lease.

Each mark on the photo is one well’s surface spot

Is your lease in the Troporo, N?

Email me when a Troporo, N lease changes

In this photoHilcorpSurface spot, no path on recordHollow: plugged

Oil, last 12 months
12,430 bbl
Gas, last 12 months
12.4 million cu ft
Producing leases
1
Producing wells
9
Operator
1
County
1
Eight things the public record says about this field; seven have records on file here. Each one sets two records side by side, and one that finds nothing still shows and says so. Photo: U.S. Geological Survey.

The story, from 404 months of reports

Oil led gas in every full year

Oil sold each month since January 1993
1,2502,5003,750 barrels a month199520002005201020152020202511993, the first year read hereJAN 19932Sold the mostJAN 2005

Troporo, N (Devonian) is one lease in Crane County, run by Hilcorp Energy Company. None of its 28 wells is horizontal. Bass Enterprises Production Co. was the operator on the first report back to January 1993. Oil has made more of the field's output than gas in every full calendar year from 1993 to 2025. Its biggest full calendar year was 2005, with 41,630 barrels of oil and 60,400 mcf of gas. In 2021 oil was 9,654 barrels and gas 4,903 mcf. The full year 2025 shows 10,062 barrels of oil and 8,406 mcf of gas. Reports for 2026 run through July.

Not a forecast, not reserves.

Key moments

  • 1993Bass Enterprises Production Co. is the operator on the first report.
  • 2001Gas output rises to 37,258 mcf from 20,767 mcf in 2000.
  • 2005Biggest full calendar year: 41,630 barrels of oil, 60,400 mcf of gas.
  • 2018Gas output falls to 12,681 mcf; oil falls to 19,431 barrels.
  • 2021Oil falls to 9,654 barrels and gas to 4,903 mcf.
  • 2025Last full calendar year: 10,062 barrels of oil and 8,406 mcf of gas.

SourceRailroad Commission production reports for every lease filed under field 91455500, January 1993 to August 2026. What the field has sold. Not a forecast, not reserves. Reported through August 2026.

Where the field sits

16 wells in Crane County

Every well the State files under the Troporo, N, drawn where its records put it. A well with a recorded bottom hole has a line to it. Wells with only a surface location appear as points. Colour the map by the company that operates each well, by how deep it runs, or see where drilling is headed.

New layers
Loading the wells…

Hilcorp

1 operator. It has a colour. Tap a pad to see whose it is, or pick a county.

About 1 mile from west to east

What is on the map

0sideways wells
9wells with no path on record
7plugged

Drilling locations: counted from the map as it loads

Leases by county

Open the full well map
Map of the wells of the Troporo, N (Devonian) field, Texas: 16 wells and 0 recent drilling locations, in a picture about 7 miles across.
  • Drilling locations0Permits issued in the last two years
  • Producing wells9On a lease reporting production now
  • Not producing0Shut in, inactive or no lease on record
  • Plugged7The state's wellbore record says plugged

Each dot is a well on a lease the Railroad Commission lists in the Troporo, N (Devonian) field, where its map puts it, or a drilling permit filed for the field in the last 24 months. Wells of other fields are not on this map. The picture is about 7 miles across. The white counties are the ones with a well or drilling permit of the field on the map. The thin brown lines are the original land surveys; where there is room, a survey carries its abstract number, the number deeds and division orders cite. Sources: Railroad Commission of Texas well layers, drilling permit files and survey lines, US Census Bureau county outlines.

See the whole Texas well map

Use this map on your site

You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.

Download the picture (WebP)
<a href="https://royaltyclerk.com/texas/fields/troporo-n-devonian-91455500"><img src="https://royaltyclerk.com/maps/field-wells/troporo-n-devonian-91455500.svg" alt="Map of the wells of the Troporo, N (Devonian) field, Texas: 16 wells and 0 recent drilling locations, in a picture about 7 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/fields/troporo-n-devonian-91455500">Oil and gas wells of the Troporo, N (Devonian) field, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>

SourcesWells, well paths, operators, permits and drilling dates: Railroad Commission of Texas. Map depth bands: true vertical depth from FracFocus. County lines: U.S. Census Bureau. The dashed line is drawn around the wells; the State keeps no outline for a field. Record dated November 19, 2026. Roll-up counted November 18, 2026.

Watch Private covers the land around yours: it tells you the day a permit or a frac lands within a mile.See Watch Private

From each well's Railroad Commission recordNew

Total depth along the wellbore

Total depth measures the full length of the drilled hole, including bends and horizontal sections. Each tick is one well's total depth on its completion record, shallowest first. The field summary has no true vertical depth from FracFocus.

EACH WELL'S TOTAL DEPTH AS FILED, SHALLOWEST TO DEEPEST0 ft2,0004,0006,000THE MIDDLE: 5,683 FEETTHE DEEPEST: 5,975 FEET

16 wells have a total depth on record, from 5,500 to 5,975 feet as filed; the middle of them is 5,683 feet. Each tick is one well.

5,683

feet: the middle of the completed total depths on record, along the hole as filed. That is 1.08 miles of hole.

5,975

feet: the deepest completed total depth on record.

16

wells have a completed total depth on record: every well on the field's leases.

Why no rock names: the State's well records give a well's total depth in feet and file the well under its field, not under the rock layer it produces from. So the drawing marks depths, never formations.

SourcesCompleted depth: the total depth on each well's own Railroad Commission well record, matched by API number whatever lease lists the well, one per API number, in whole feet as filed. Completed April 21, 1979 to July 23, 1982 (the earliest completion date on each well's record). 16 of the field's 16 wells have a completed total depth on record; a well without one is not drawn.

For mineral owners, from the state record

What Troporo, N owners ask

01What is the Troporo, N field?
Troporo, N (Devonian) is the name the Railroad Commission files these leases under: field 91455500, district 08. The State files every lease under a field. The field on your statement names the rock your wells produce from, not the town they are near.
Source: Railroad Commission of Texas field list, field 91455500, district 08.
See wellbore depths
02Is my lease in the Troporo, N?
1 lease reports to this field, in Crane County. A lease can report to two fields when its wells reach different rock, and then it has a page under each. Search the lease name on your check stub to see which fields it reports to.
Source: Railroad Commission production reports, field of record for each lease.
Find my lease
03Who pays royalties in the Troporo, N?
1 operator reported production from the field in the last 12 months. The one that pays you is the company named on your check stub. Hilcorp Energy Company runs the field's one producing lease.
Source: Railroad Commission production reports, operator of record.
See the operator
04Why did my Troporo, N check change?
Across the field, oil sold is up 50.0% on the 12 months before and the oil price is up 10.4%. In the same months gas sold is up 111% and the gas price up 14.3%. A check can move with the field's volume and the price with nothing wrong on the lease. The statement check tells the two apart.
Source: Railroad Commission production reports; U.S. Energy Information Administration prices.
Why is my check lower?
05Who runs this field now?
Hilcorp Energy Company runs it now. It is the only operator in the field. It runs the one producing lease, Troporo,north (Dev) Unit, lease 25426, with all 28 wells.
06Who ran the field at the start of the record?
Bass Enterprises Production Co. appears on the first report back to January 1993, as operator of the one lease. The field has one operator in the record.
07How much did the field produce in its biggest full calendar year?
Its biggest full calendar year was 2005. The field produced 41,630 barrels of oil and 60,400 mcf of gas that year. Oil made more of the output than gas, as in every full year from January 1993.
08Does this field have horizontal wells?
No. The record shows none of its 28 wells as horizontal. The field's one lease, 25426, is in Crane County.

404 months against seven other recordsNew

How this field's oil and gas changed year by year

The whole field is the line on top. Under it, on the same clock: the weather, the price, how many leases reported, new wells, takeovers, State cut-offs and leases that went silent. Move across it.

Aug 2026
846 barrels · down 15.9% on the three months before
Oil averaged $83.90 a barrel · 1 lease reporting
  • PriceThe oil price fell 19.8% the month before, to $80.46 a barrel.
SINCEJAN 1993199520002005201020152020202501,2502,5003,7505,000BARRELS A MONTHLAST 12 MONTHS123456WEATHEROIL PRICELEASESNEW WELLSTAKEOVERSCUT-OFFSSILENT119941996199820002002200420062008201020122014201620182020202220242026
Six months to look at

Move the pointer or drag across the chart. The numbered buttons jump to each month.

Monthly oil sold from the Troporo, N (Devonian) field since January 1993, with the record tracks beneath it on the same clock. 404 months from January 1993 to August 2026. The most in one month: 4,074 barrels, January 2005. The newest month: 846 barrels. Moments marked: 1, Apr 1993; 2, Jul 1994; 3, Jul 1997; 4, Apr 2005; 5, Mar 2007; 6, Oct 2024.

SourcesProduction, leases, new wells, takeovers, cut-offs and silent leases: Railroad Commission of Texas. Weather: NOAA Storm Events (file dated Oct 26, 2026) and NOAA daily county lows observed through Feb 21, 2026. Prices: U.S. Energy Information Administration (WTI for oil, Henry Hub for gas). Nothing on record in these months for: new wells and silent. A record in the same month is not proof of a cause. Reported through August 2026. Roll-up counted November 18, 2026.

Royalty Watch tells you the month your own lease starts to drop, with the records from that month.See Royalty Watch

34 years of state records, 1993 to 2026

Sold since January 1993

$49.5 million

What the field's oil and gas sold for at each month's public prices, before tax and the operators' deductions.

Oil sold
858,392barrels
Gas sold
949 millioncubic feet
Best year
2008$3.9 million sold
Sold each year, at that month's pricesOilGas
Value of oil and gas sold from the Troporo, N (Devonian) field each year from 1993 to 2026
YearOil, dollarsGas, dollarsTotal
1993$720,000$96,000$817,000
1994$558,000$52,000$610,000
1995$530,000$28,000$558,000
1996$600,000$63,000$663,000
1997$483,000$47,000$530,000
1998$368,000$44,000$413,000
1999$477,000$53,000$530,000
2000$622,000$88,000$711,000
2001$741,000$126,000$867,000
2002$736,000$161,000$897,000
2003$950,000$230,000$1.1 million
2004$1.6 million$289,000$1.9 million
2005$2.3 million$530,000$2.8 million
2006$2.7 million$324,000$3.1 million
2007$2.7 million$361,000$3 million
2008$3.5 million$396,000$3.9 million, sold the most
2009$2 million$144,000$2.1 million
2010$2.4 million$159,000$2.5 million
2011$2.7 million$143,000$2.9 million
2012$2.7 million$94,000$2.8 million
2013$2.6 million$120,000$2.7 million
2014$2.5 million$142,000$2.6 million
2015$1.2 million$82,000$1.3 million
2016$1 million$63,000$1 million
2017$1.1 million$63,000$1.2 million
2018$1.2 million$40,000$1.3 million
2019$886,000$28,000$914,000
2020$526,000$17,000$544,000
2021$658,000$19,000$677,000
2022$1 million$51,000$1 million
2023$656,000$14,000$670,000
2024$640,000$13,000$653,000
2025$650,000$29,000$680,000
2026, to August$686,000$28,000$714,000

For research and teaching

Royalty Clerk. “Troporo, N (Devonian) field, Texas.” Data through August 2026, from Railroad Commission of Texas filings. royaltyclerk.com/texas/fields/troporo-n-devonian-91455500.

SourcesRailroad Commission Production Data Query, every monthly report since January 1993. EIA monthly WTI and Henry Hub prices. 2026 is part of a year, drawn lighter. Not a forecast, not reserves. Reported through August 2026.

1 producing lease

The one lease that makes up this field

The lease, its operator and county, and what else the records hold for it.

Producing leases in the Troporo, N (Devonian) field, biggest first
LeaseOperatorCountyOil soldbarrels, 12 months to Aug 2026Changeon the 12 before24 monthsAlso on record
TROPORO,NORTH (DEV) UNITHilcorp Energy Company · CraneHilcorp Energy CompanyCrane12,430 bbl▲ 50.0%Lower tax

SourceTexas Railroad Commission Production Data Query, field 91455500, through August 2026, file dated Oct 20, 2026.

1 operator, one county

Who runs Troporo, N (Devonian) now

Hilcorp Energy Company operates every lease that reported oil in the last 12 months, all in Crane County.

By oil in the last 12 months

  1. 1Hilcorp Energy Company12,430bbl1 lease · 100% of the field's oil · Crane

SourceTexas Railroad Commission Production Data Query, operator of record for each lease, through August 2026. Record dated October 20, 2026.

Oil prices and taxNew

The State approved a lower tax on 1 of the 1 leases

$75.87

a barrel, West Texas Intermediate, the average of the 12 months through August 2026, up 10.4% on the 12 before.

The tax office's price for each lease of this field shows here once the Comptroller's records for it arrive. Leases sell at different points and qualities, so their prices differ from the market for ordinary reasons too.

On recordA lower tax is on record

Lower tax approvals in this field

LOW PRODUCING LEASES
1 lease
Newest approval
July 2018

100% of the field's producing leases

On those leases the tax line on a statement should show the lower rate. Each lease page says which wells and until when.

Market price$75.87

West Texas Intermediate, the 12 months through August 2026

Operator priceNot on file

No operator here reports a price to investors on file.

Tax-office priceNot on file

Not on file here yet. It shows once the Comptroller's records for this field arrive.

Your statementFrom your stub

The price on your own check stub, set beside these three. Check my statement

SourcesMarket: U.S. Energy Information Administration, West Texas Intermediate. Tax approvals: Texas Comptroller. A lease shows only where the Comptroller's records have arrived. Reported through October 2026. Roll-up counted November 18, 2026.

Watch Plus sets these prices beside the price on each of your statements, every month.See Watch Plus

Who buys the gasNew

1 lease with a gas purchaser on file

Each bar is one operator's gas allocated to its current buyer rows, split by buyer. Shares use reported production and the State's Form P-4.

OperatorIts allocated gas, split by buyerBuyers on file
Hilcorp Energy CompanyDCP OPERATING COMPANY, LP 100%

No company filing on file here names a buyer and its operator in the same company, so whether they share an owner is unknown, not none. Buyers as of the Form P-4 record dated Oct 24, 2026.

Form P-4 filings and how the shares are calculated

Each lease's reported production over the field's last 12 months is allocated by the buyer's percent on the Form P-4; where no percent is filed, the lease's current buyers are given equal shares, an estimate. This is an allocation, not a sales record or a metered volume: where a lease has some percents filed and some missing, its allocations can add to more than its production. A lease with no current buyer on file is not counted, so these shares are of the 12,438 mcf allocated across current buyer rows, not of the whole field.

Gas purchasers

1 lease across 1 current entry on Form P-4.

  1. DCP OPERATING COMPANY, LP · 1 lease

Common ownership with the operator is unconfirmed in the company records checked.

Latest P-4 source date

Oil gatherers

1 lease across 1 current entry on Form P-4.

  1. RIO ENERGY INTERNATIONAL, INC. · 1 lease

Common ownership with the operator is unconfirmed in the company records checked.

Latest P-4 source date

Gas purchasers buy casinghead gas or gas-well gas. Oil gatherers collect oil for transport. Each lease counts once in each role, even if several companies or gas products are listed. The company lists show up to five parties by lease count. A lease can appear under more than one company.

SourcesAllocation bars: Railroad Commission Form P-4 current purchaser rows, with each lease's reported production over the last 12 months (Railroad Commission production reports) allocated by the buyer's filed percent, or an equal split of the lease where none is filed; only gas on leases with a current buyer on file is counted. An allocation, not a sales record. Ownership: U.S. Securities and Exchange Commission filings and State organization reports. Record dated October 24, 2026. Roll-up counted November 18, 2026.

Royalty Watch tells you the day the buyer of your oil or gas changes.See Royalty Watch

Seen from space, 2025New

No matched night observations on file for the field's leases

Weather satellites pass over Texas every night and record heat on the ground. No night observation in 2025 is matched to this field's leases on file here, and the satellites' coverage of these wells is unverified, so this is not a finding that there was no heat.

Where the field's gas went in 2025, as operators reported it

100%Sold8,406 mcf
0%Used on the lease0 mcf
0%Flared or vented0 mcf

SourcesHeat: VIIRS active fire readings at night from NOAA-20, NOAA-21 and Suomi NPP (NOAA open data), matched to a lease's wells; a GOES-East reading alone never counts as a night. Satellite record read to Nov 16, 2026. Reported flaring and gas use: Railroad Commission production reports. Cloud hides heat, so the count is a floor. The satellite records heat. It does not say what burned. Roll-up counted November 18, 2026.

Watch Plus checks whether you were paid on gas in the months heat was seen at your lease.See Watch Plus

Well stages

Wells between permit and first production

A comparison of permits, drilling and fracs is unavailable for this field. No drilling permit for this field is among the State permit records read here.

Permitted
Drilling
Fracked
Completed

SourceRailroad Commission drilling permits and FracFocus. Checked for the Troporo, N field. Source date unavailable. Roll-up counted November 18, 2026.

Royalty Watch tells you the day a well on your lease moves to its next stage.See Royalty Watch

Do your Troporo, N checks match the State?

Own minerals here? Add your leases to My leases and see your share of every month.

Example

A whole month was never paid

The State shows 28,175 barrels of oil sold from the lease in the month its operator changed from Operator A to Operator B, so the owner's share is 27.51 barrels. No statement covers that month.

Ask Operator B's owner relations: is that month held in suspense after the change of operator?

$2,277oil and gas

A sample finding, from our example check.

Around this field

Nearby

Where the Troporo, N isCountyCrane

More

Where this page comes from

  • Railroad Commission of Texas production, Form P-4, permits, wells, completions, cut-offs
  • Texas Comptroller tax approvals
  • U.S. Energy Information Administration prices
  • NOAA storms and cold
  • NOAA open data VIIRS night heat (NOAA-20, NOAA-21, Suomi NPP)
  • U.S. Geological Survey photo from the air
  • U.S. Census Bureau county shapes