Ector County, Texas · Survey abstract
A-70: Section 5, Block 41 T2S, T&P RR CO survey
631 acres in Ector County. The state’s records tie 5 wells and 7 drilling permits from the last 24 months to this abstract.
Free. We look for new drilling permits on A-70 (a horizontal well whose bottom hole ends here counts), completions and first production, and email you once a week at most.
A map of the land, not of who owns it.
- Acres, state layer
- 631 acres
- Wells
- 5
- Horizontal wells
- 0
- Producing leases
- 2oil or gas sold, 12 months
- Permits, 24 months
- 7
- Events, 12 months
- 16
Survey map of A-70
This survey on one page to print, with its wells and a scale.
This does not tell you who owns the minerals
About the boundary
From the state’s records
What is recorded on A-70
Wells the Railroad Commission ties to A-70: either the operator’s filing names the abstract, or the well’s mapped point falls inside the survey shape. A well here may produce from a unit that takes in other land too.
| API number | Status | Lease |
|---|---|---|
| 42-135-44018Ovintiv USA Inc. | Active | Headlee 5GFiled on this abstract |
| 42-135-44019Ovintiv USA Inc. | Active | Headlee 5GFiled on this abstract |
| 42-135-44020Ovintiv USA Inc. | Active | Headlee 5GFiled on this abstract |
| 42-135-44021Ovintiv USA Inc. | Active | Headlee 5XFiled on this abstract |
| 42-135-44022Ovintiv USA Inc. | Active | Headlee 5XFiled on this abstract |
Leases with a well tied to A-70, with what the state’s monthly reports show sold in the last 12 months. A lease is the operator’s reporting unit; your share of it depends on your deed and your division order.
| Lease | Oil sold, 12 monthsbarrels | Gas sold, 12 monthsmcf |
|---|---|---|
| Headlee 5GOvintiv USA Inc., latest report Aug 2026 | 168,989 | 479,631 |
| Headlee 5XOvintiv USA Inc., latest report Aug 2026 | 131,323 | 303,864 |
Drilling permits the state matched to A-70 in the last 24 months. A permit is permission to drill, not a well: some are never drilled.
| Permit | Issued | Horizontal |
|---|---|---|
| 0918837HEADLEE 5B, Ovintiv USA Inc. | Sep 29, 2026 | Yes |
| 0918853HEADLEE 5B, Ovintiv USA Inc. | Sep 29, 2026 | Yes |
| 0918834HEADLEE 5A, Ovintiv USA Inc. | Sep 25, 2026 | Yes |
| 0918840HEADLEE 5C, Ovintiv USA Inc. | Sep 25, 2026 | Yes |
| 0918852HEADLEE 5A, Ovintiv USA Inc. | Sep 25, 2026 | Yes |
| 0918854HEADLEE 5C, Ovintiv USA Inc. | Sep 25, 2026 | Yes |
| 0912222HEADLEE 5E, Ovintiv USA Inc. | Dec 23, 2025 | Yes |
Endpoint evidence, not surveyed laterals
| Permit | End on A-70 |
|---|---|
| 0918837Ovintiv USA Inc., issued Sep 29, 2026 | Surface location |
| 0918853Ovintiv USA Inc., issued Sep 29, 2026 | Surface location |
| 0918834Ovintiv USA Inc., issued Sep 25, 2026 | Surface location |
| 0918840Ovintiv USA Inc., issued Sep 25, 2026 | Surface location |
| 0918852Ovintiv USA Inc., issued Sep 25, 2026 | Surface location |
| 0918854Ovintiv USA Inc., issued Sep 25, 2026 | Surface location |
What the state recorded on A-70 in the last 12 months: permits issued or amended, wells completed, first production.
| Date | What happened |
|---|---|
| Sep 29, 2026 | Permit issuedHEADLEE 5B 304HF |
| Sep 29, 2026 | Permit issuedHEADLEE 5B 303HC |
| Sep 25, 2026 | Permit issuedHEADLEE 5C 306HD |
| Sep 25, 2026 | Permit issuedHEADLEE 5A 301HD |
| Sep 25, 2026 | Permit issuedHEADLEE 5C 305HG |
| Sep 25, 2026 | Permit issuedHEADLEE 5A 302HG |
| May 1, 2026 | Permit amendedHEADLEE 5E 205HG |
| May 1, 2026 | Permit amendedHEADLEE 5E 203HC |
| May 1, 2026 | Permit amendedHEADLEE 5D 201HD |
| May 1, 2026 | Permit amendedHEADLEE 5E 204HD |
| May 1, 2026 | Permit amendedHEADLEE 5D 202HG |
| Dec 23, 2025 | Permit amendedHEADLEE 5E 203HC |
| Dec 23, 2025 | Permit amendedHEADLEE 5D 201HD |
| Dec 23, 2025 | Permit amendedHEADLEE 5E 204HD |
| Dec 23, 2025 | Permit amendedHEADLEE 5D 202HG |
| Dec 23, 2025 | Permit issuedHEADLEE 5E 205HG |
County deed records
Ask the Ector County Clerk
We have not written up Ector County’s deed records yet. The county clerk keeps the deed records for land in the county. You can call, write or visit, and the office can tell you what is online and what a copy costs.
The deed is what shows who received the minerals. A map of the land, like the one on this page, does not.
Volume and page is the address of a deed in the county’s books.
What to ask the clerk for
- The deed that describes this land, by its recording number: the volume and page, or the instrument number.
- The grantor and grantee index for the names on your family's deeds, so you can find the later deeds too.
- Copies of any mineral deeds, royalty deeds or probate records that mention the land.
Take this with you
A-70, Section 5, Block 41 T2S, T&P RR CO survey, Ector County
Hear when something new is filed on A-70
A new drilling permit is often the first sign of a new well, and of new royalty months later. We check the state’s records every week.
Sources
The survey shape is from the Railroad Commission’s survey layer, dated Sep 29, 2026. Wells, leases, permits and production are the Commission’s public records as loaded into Royalty Clerk.