Martin County, Texas · Survey abstract
A-693: Section 8, Block 36 T2N, T&P RR CO survey
488 acres in Martin County. The state’s records tie 19 wells and 23 drilling permits from the last 24 months to this abstract.
Free. We look for new drilling permits on A-693 (a horizontal well whose bottom hole ends here counts), completions and first production, and email you once a week at most.
A map of the land, not of who owns it.
- Acres, state layer
- 488 acres
- Wells
- 19
- Horizontal wells
- 0
- Producing leases
- 13oil or gas sold, 12 months
- Permits, 24 months
- 23
- Events, 12 months
- 42
Survey map of A-693
This survey on one page to print, with its wells and a scale.
This does not tell you who owns the minerals
About the boundary
From the state’s records
What is recorded on A-693
Wells the Railroad Commission ties to A-693: either the operator’s filing names the abstract, or the well’s mapped point falls inside the survey shape. A well here may produce from a unit that takes in other land too.
| API number | Status | Lease |
|---|---|---|
| 42-317-30400Escondido Bay Corporation | Active | MartinFiled on this abstract |
| 42-317-30756Avra Oil Company | Active | BarneyFiled on this abstract |
| 42-317-33885Avra Oil Company | Active | BarneyFiled on this abstract |
| 42-317-34124Avra Oil Company | Shut in | BarneyFiled on this abstract |
| 42-317-34125Avra Oil Company | Active | BarneyFiled on this abstract |
| 42-317-37376Diamondback E&P LLC | Shut in | PWFiled on this abstract |
| 42-317-38896Oxyrock Operating, LLC | Active | Largesse 8AFiled on this abstract |
| 42-317-39213Oxyrock Operating, LLC | Active | Largesse 8AFiled on this abstract |
| 42-317-39749Oxyrock Operating, LLC | Active | Largesse 8AFiled on this abstract |
| 42-317-46526Diamondback E&P LLC | Active | Tombstone 8-25 BFiled on this abstract |
| 42-317-46527Diamondback E&P LLC | Active | Tombstone 8-25 CFiled on this abstract |
| 42-317-46528Diamondback E&P LLC | Active | Tombstone 8-25 DFiled on this abstract |
| 42-317-46529Diamondback E&P LLC | Active | Tombstone 8-25 EFiled on this abstract |
| 42-317-46530Diamondback E&P LLC | Active | Tombstone 8-25 FFiled on this abstract |
| 42-317-46531Diamondback E&P LLC | Active | Tombstone 8-25 GFiled on this abstract |
| 42-317-46532Diamondback E&P LLC | Active | Tombstone 8-25 HFiled on this abstract |
| 42-317-46568Diamondback E&P LLC | Active | Tombstone 8-25 IFiled on this abstract |
| 42-317-46569Diamondback E&P LLC | Active | Tombstone 8-25 JFiled on this abstract |
| 42-317-46570Diamondback E&P LLC | Active | Tombstone 8-25 KFiled on this abstract |
Leases with a well tied to A-693, with what the state’s monthly reports show sold in the last 12 months. A lease is the operator’s reporting unit; your share of it depends on your deed and your division order.
| Lease | Oil sold, 12 monthsbarrels | Gas sold, 12 monthsmcf |
|---|---|---|
| BarneyAvra Oil Company, latest report Oct 2022 | 0 | 0 |
| Largesse 8AOxyrock Operating, LLC, latest report Aug 2026 | 3,846 | 6,264 |
| MartinEscondido Bay Corporation, latest report Aug 2026 | 691 | 0 |
| PWDiamondback E&P LLC, latest report Aug 2026 | 91 | 0 |
| Tombstone 8-25 BDiamondback E&P LLC, latest report Aug 2026 | 104,650 | 93,703 |
| Tombstone 8-25 CDiamondback E&P LLC, latest report Aug 2026 | 88,706 | 99,952 |
| Tombstone 8-25 DDiamondback E&P LLC, latest report Aug 2026 | 114,546 | 113,967 |
| Tombstone 8-25 EDiamondback E&P LLC, latest report Aug 2026 | 148,485 | 144,906 |
| Tombstone 8-25 FDiamondback E&P LLC, latest report Aug 2026 | 216,293 | 184,527 |
| Tombstone 8-25 GDiamondback E&P LLC, latest report Aug 2026 | 252,673 | 236,586 |
| Tombstone 8-25 HDiamondback E&P LLC, latest report Aug 2026 | 163,640 | 152,976 |
| Tombstone 8-25 IDiamondback E&P LLC, latest report Aug 2026 | 102,604 | 109,792 |
| Tombstone 8-25 JDiamondback E&P LLC, latest report Aug 2026 | 143,923 | 153,122 |
| Tombstone 8-25 KDiamondback E&P LLC, latest report Aug 2026 | 114,640 | 107,934 |
Drilling permits the state matched to A-693 in the last 24 months. A permit is permission to drill, not a well: some are never drilled.
| Permit | Issued | Horizontal |
|---|---|---|
| 0919927HIGH NOON 8-20 H, Diamondback E&P LLC | Nov 5, 2026 | Yes |
| 0919929HIGH NOON 8-20 G, Diamondback E&P LLC | Nov 5, 2026 | Yes |
| 0918590HIGH NOON 8-20 A, Diamondback E&P LLC | Sep 17, 2026 | Yes |
| 0918591HIGH NOON 8-20 A, Diamondback E&P LLC | Sep 17, 2026 | Yes |
| 0918592HIGH NOON 8-20 B, Diamondback E&P LLC | Sep 17, 2026 | Yes |
| 0918593HIGH NOON 8-20 B, Diamondback E&P LLC | Sep 17, 2026 | Yes |
| 0918594HIGH NOON 8-20 C, Diamondback E&P LLC | Sep 17, 2026 | Yes |
| 0918595HIGH NOON 8-20 C, Diamondback E&P LLC | Sep 17, 2026 | Yes |
| 0918596HIGH NOON 8-20 D, Diamondback E&P LLC | Sep 17, 2026 | Yes |
| 0918597HIGH NOON 8-20 E, Diamondback E&P LLC | Sep 17, 2026 | Yes |
| 0918598HIGH NOON 8-20 F, Diamondback E&P LLC | Sep 17, 2026 | Yes |
| 0918599HIGH NOON 8-20 G, Diamondback E&P LLC | Sep 17, 2026 | Yes |
| 0904539TOMBSTONE 8-25 B, Diamondback E&P LLC | Jan 14, 2025 | Yes |
| 0904540TOMBSTONE 8-25 C, Diamondback E&P LLC | Jan 14, 2025 | Yes |
| 0904541TOMBSTONE 8-25 D, Diamondback E&P LLC | Jan 14, 2025 | Yes |
| 0904542TOMBSTONE 8-25 E, Diamondback E&P LLC | Jan 14, 2025 | Yes |
| 0904543TOMBSTONE 8-25 F, Diamondback E&P LLC | Jan 14, 2025 | Yes |
| 0904544TOMBSTONE 8-25 G, Diamondback E&P LLC | Jan 14, 2025 | Yes |
| 0904545TOMBSTONE 8-25 H, Diamondback E&P LLC | Jan 14, 2025 | Yes |
| 0904759TOMBSTONE 8-25 B, Diamondback E&P LLC | Jan 14, 2025 | Yes |
| 0904760TOMBSTONE 8-25 I, Diamondback E&P LLC | Jan 14, 2025 | Yes |
| 0904762TOMBSTONE 8-25 J, Diamondback E&P LLC | Jan 14, 2025 | Yes |
| 0904763TOMBSTONE 8-25 K, Diamondback E&P LLC | Jan 14, 2025 | Yes |
Endpoint evidence, not surveyed laterals
| Permit | End on A-693 |
|---|---|
| 0919927Diamondback E&P LLC, issued Nov 5, 2026 | Surface location |
| 0919929Diamondback E&P LLC, issued Nov 5, 2026 | Surface location |
What the state recorded on A-693 in the last 12 months: permits issued or amended, wells completed, first production.
| Date | What happened |
|---|---|
| Nov 5, 2026 | Permit issuedHIGH NOON 8-20 H 1WD |
| Nov 5, 2026 | Permit issuedHIGH NOON 8-20 G 2WD |
| Sep 17, 2026 | Permit issuedHIGH NOON 8-20 G 2JM |
| Sep 17, 2026 | Permit issuedHIGH NOON 8-20 F 3WA |
| Sep 17, 2026 | Permit issuedHIGH NOON 8-20 E 2LS |
| Sep 17, 2026 | Permit issuedHIGH NOON 8-20 D 2WB |
| Sep 17, 2026 | Permit issuedHIGH NOON 8-20 C 1MS |
| Sep 17, 2026 | Permit issuedHIGH NOON 8-20 C 2WA |
| Sep 17, 2026 | Permit issuedHIGH NOON 8-20 B 1LS |
| Sep 17, 2026 | Permit issuedHIGH NOON 8-20 B 1WB |
| Sep 17, 2026 | Permit issuedHIGH NOON 8-20 A 1JM |
| Sep 17, 2026 | Permit issuedHIGH NOON 8-20 A 1WA |
| Aug 28, 2026 | First check dueTombstone 8-25 K |
| Aug 28, 2026 | First check dueTombstone 8-25 D |
| Aug 28, 2026 | First check dueTombstone 8-25 G |
| Aug 28, 2026 | First check dueTombstone 8-25 E |
| Aug 28, 2026 | First check dueTombstone 8-25 C |
| Aug 28, 2026 | First check dueTombstone 8-25 B |
| Aug 28, 2026 | First check dueTombstone 8-25 H |
| Aug 28, 2026 | First check dueTombstone 8-25 F |
| Aug 28, 2026 | First check dueTombstone 8-25 I |
| Aug 28, 2026 | First check dueTombstone 8-25 J |
| Apr 2, 2026 | Well completedTOMBSTONE 8-25 E 5LS |
| Apr 2, 2026 | Well completedTOMBSTONE 8-25 H 8WA |
| Apr 2, 2026 | Well completedTOMBSTONE 8-25 F 6WA |
| Apr 2, 2026 | Well completedTOMBSTONE 8-25 K 1MS |
| Apr 2, 2026 | Well completedTOMBSTONE 8-25 I 9WB |
| Apr 2, 2026 | Well completedTOMBSTONE 8-25 C 3JM |
| Apr 1, 2026 | First productionTombstone 8-25 K |
| Apr 1, 2026 | First productionTombstone 8-25 D |
| Apr 1, 2026 | First productionTombstone 8-25 G |
| Apr 1, 2026 | First productionTombstone 8-25 E |
| Apr 1, 2026 | First productionTombstone 8-25 C |
| Apr 1, 2026 | First productionTombstone 8-25 B |
| Apr 1, 2026 | First productionTombstone 8-25 H |
| Apr 1, 2026 | First productionTombstone 8-25 F |
| Apr 1, 2026 | First productionTombstone 8-25 I |
| Apr 1, 2026 | First productionTombstone 8-25 J |
| Apr 1, 2026 | Well completedTOMBSTONE 8-25 D 4LS |
| Apr 1, 2026 | Well completedTOMBSTONE 8-25 B 2JM |
| Apr 1, 2026 | Well completedTOMBSTONE 8-25 G 7WA |
| Apr 1, 2026 | Well completedTOMBSTONE 8-25 J 10WB |
County deed records
Ask the Martin County Clerk
We have not written up Martin County’s deed records yet. The county clerk keeps the deed records for land in the county. You can call, write or visit, and the office can tell you what is online and what a copy costs.
The deed is what shows who received the minerals. A map of the land, like the one on this page, does not.
Volume and page is the address of a deed in the county’s books.
What to ask the clerk for
- The deed that describes this land, by its recording number: the volume and page, or the instrument number.
- The grantor and grantee index for the names on your family's deeds, so you can find the later deeds too.
- Copies of any mineral deeds, royalty deeds or probate records that mention the land.
Take this with you
A-693, Section 8, Block 36 T2N, T&P RR CO survey, Martin County
Hear when something new is filed on A-693
A new drilling permit is often the first sign of a new well, and of new royalty months later. We check the state’s records every week.
Sources
The survey shape is from the Railroad Commission’s survey layer, dated Sep 29, 2026. Wells, leases, permits and production are the Commission’s public records as loaded into Royalty Clerk.