Skip to content

Texas oil lease

Producing

ADELE DUBOSE UNIT A

Adele Dubose Unit A is an oil lease in Gonzales County, Texas, operated by Verdun Oil & Gas LLC in the Eagleville (Eagle Ford-1) field.

3 wells

11,206bbl oil, last 12 months−53% vs prior year
RRC lease
01-17053

11 royalty accounts on the county roll

Is your family on this lease?

Email me when this lease changes
Gas, last 12 months
30,194 mcf
Oil in Aug 2026
574 bbl

Did a relative own a share of this lease?

Pick the year they passed and see what the lease has sold since.

Wells on this lease and around it

Where the state's map puts this lease's 3 wells, and what has been drilled or permitted within about 2 miles of them.
Map of the Adele Dubose Unit A lease in Gonzales County, Texas: its 3 wells ringed, among 392 wells and 17 recent drilling locations in a picture about 7 miles across.
  • This lease3Its wells, ringed on the map: all producing
  • Drilling locations17Permits issued in the last two years
  • Producing wells374On a lease reporting production now
  • Not producing13Shut in, inactive or no lease on record
  • Plugged5The state's wellbore record says plugged

The 3 ringed dots are this lease's wells, each where the Railroad Commission's map puts it. The other dots are wells and drilling permits of the last 24 months on the land around it; the counts are for everything in the picture, which is about 7 miles across. The thin brown lines are the original land surveys; where there is room, a survey carries its abstract number, the number deeds and division orders cite. Sources: Railroad Commission of Texas well layers, drilling permit files and survey lines, US Census Bureau county outlines, base map from USGS The National Map.

See the whole Texas well map

A one-page map of this lease to print, for a lawyer, a buyer or a probate file.

Use this map on your site

You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.

Download the picture (WebP)
<a href="https://royaltyclerk.com/texas/leases/adele-dubose-unit-a-01-17053"><img src="https://royaltyclerk.com/maps/lease-wells/adele-dubose-unit-a-01-17053.svg" alt="Map of the Adele Dubose Unit A lease in Gonzales County, Texas: its 3 wells ringed, among 392 wells and 17 recent drilling locations in a picture about 7 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/leases/adele-dubose-unit-a-01-17053">Wells on the Adele Dubose Unit A lease, Gonzales County, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>

Other leases named Adele Dubose Unit A

2 leases share this name in district 01. The Railroad Commission gives each gas well its own number and each oil lease another, so one unit often shows up as several of these.

Other Adele Dubose leases in Gonzales County

2 leases in Gonzales County in the same field or with the same operator carry the Adele Dubose name. Operators often name the leases on one family's land alike, with a letter or unit number after the name. Sharing a name proves no tie: your division order says which ones pay you.

Production by month

Oil output fell 53% over the last 12 months

  • Oil (bars)
  • Gas (line)
  • Last 12 months
Oil output fell 53% over the last 12 monthsMonthly oil production and gas for ADELE DUBOSE UNIT A, Sep 2023 to Aug 2026. Oil output fell 53% over the last 12 months. 11,206 bbl in the 12 months through Aug 2026, against 24,088 bbl in the 12 months before.Last 12 months: 11,206 bblbbl per monthmcf per month005,00010k10k20k15k30k20k40kOct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output fell 53% over the last 12 monthsMonthly oil production and gas for ADELE DUBOSE UNIT A, Sep 2023 to Aug 2026. Oil output fell 53% over the last 12 months. 11,206 bbl in the 12 months through Aug 2026, against 24,088 bbl in the 12 months before.Last 12 monthsbbl per monthmcf per month005,00010k10k20k15k30k20k40kJan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Aug 2026.

From the state record

What owners ask about Adele Dubose Unit A

When is the check for August 2026 due?
August 2026 is the newest month the state has posted for this lease. Texas law gives the payor until 60 days after the end of the sale month for oil and 90 for gas: the oil by Oct 30, 2026, unless the lease sets another time.
Source: Railroad Commission production reports; Texas Natural Resources Code §91.402.
See your next three checks
Which Texas production tax rate applies?
The Texas Comptroller lists no approved exemption or reduced rate for this lease for August 2026, so the full 4.6% on oil applies.
Source: Texas Comptroller, approved severance tax exemptions.
Check the tax on your stub
Who buys the oil and gas?
Oil: Phillips 66 Company gathers it. Gas from oil wells: Energy Transfer Company buys and gathers it. The buyer's price is what a royalty check is figured on.
Source: Railroad Commission Form P-4, gatherers and purchasers.
See every buyer and past buyers
How many 1099s should an owner expect for 2025?
One company, Verdun Oil & Gas LLC, filed this lease's reports behind every 2025 check, so most owners get one form. The operator is not always the company that pays, so go by the name on the stubs.
Source: Railroad Commission production reports, operator of record by month.
Check your 1099 against it

33 years of state records, 1993–2026

ADELE DUBOSE UNIT A since 2013

We read every monthly report the Railroad Commission holds, back to January 1993. This lease first reported in August 2013. It filed 157 monthly reports through August 2026.

Sold since 2013

$36.1 million

What the whole lease’s oil and gas sold for at each month’s public prices, before tax and the operator’s deductions. A royalty owner’s share is their decimal of it.

A relative owned a share? See what it earned after they died
Oil sold
429,107 bbl
Gas sold
574,382 mcf
Best year
2013$9.1 million sold
Last report
Aug 2026First: Aug 2013

Its best year was 2013: $9.1 million of oil and gas sold

Each bar is what the lease’s oil and gas sold for that year, at that month’s prices. 2026 is only part of a year in the records, drawn lighter.

  • Oil
  • Gas
Its best year was 2013: $9.1 million of oil and gas soldAdele Dubose Unit A: oil and gas sold each year from 2013 to 2026, at each month's prices. Its best year was 2013: $9.1 million of oil and gas sold.Sold each year, at each month’s prices$0$2.5M$5M$7.5M$10MPeak 2013: $9.2M20132014201520162017201820192020202120222023202420252026
Its best year was 2013: $9.1 million of oil and gas soldAdele Dubose Unit A: oil and gas sold each year from 2013 to 2026, at each month's prices. Its best year was 2013: $9.1 million of oil and gas sold.Sold each year, at each month’s prices$0$2.5M$5M$7.5M$10MPeak 2013: $9.2M'13'15'20'26

SourceTexas Railroad Commission Production Data Query, every monthly report since January 1993; EIA monthly WTI and Henry Hub prices (before 1997, EIA's yearly Texas natural gas wellhead price), through August 2026.

Every year as a table
Adele Dubose Unit A: oil and gas sold each year
YearMonthsOil sold, bblGas sold, mcfSold for
2026 *86,36511,692$577,186
20251216,83856,733$1,315,804
20241293,499192,603$7,726,301
2023128,7652,480$663,880
20221233,5357,166$3,293,724
20211229,73713,327$2,214,578
2020129,88221,251$473,700
20191213,95228,923$880,899
20181213,5441,993$887,909
20171216,2816,569$849,458
20161216,27910,832$718,978
20151226,65220,638$1,377,472
20141260,30357,749$6,026,995
2013583,475142,426$9,172,291

* Part of the year: the records run through August 2026.

Where the gas went

Since Dec 2023 the lease's gas goes to a transmission line instead of lease fuel

  • Transmission line (2)
  • Lease fuel (1)
  • Flared (4)
Since Dec 2023 the lease's gas goes to a transmission line instead of lease fuelShare of ADELE DUBOSE UNIT A gas by disposition code each month, Sep 2023 to Aug 2026. Since Dec 2023 the lease's gas goes to a transmission line instead of lease fuel.Share of the lease’s gas by disposition code, per month0%50%100%Dec 2023: fuel to lineOct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Since Dec 2023 the lease's gas goes to a transmission line instead of lease fuelShare of ADELE DUBOSE UNIT A gas by disposition code each month, Sep 2023 to Aug 2026. Since Dec 2023 the lease's gas goes to a transmission line instead of lease fuel.Share of gas by disposition code0%50%100%Dec 23: fuel to lineJan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Aug 2026.

  • Transmission line (2)

    85% · 31,480 mcf

  • Lease fuel (1)

    14% · 5,229 mcf

  • Flared (4)

    0.6% · 207 mcf

0.6% of the gas flared in the last 12 months. No month above 3%.

3 wells on this lease

Wells on ADELE DUBOSE UNIT A
API numberWellStatusCompleted
42-177-32863Adele Dubose Unit A 1ActiveAug 10, 2013
42-177-32931Adele Dubose Unit A 2RAShut inAug 14, 2013
42-177-34551Adele Dubose Unit A 101ActiveDec 18, 2023

SourceTexas Railroad Commission production records and full wellbore file.

Other leases on these wells

The Railroad Commission files the same API numbers under one more lease too: a well keeps its number when it moves into a unit or is recompleted under another lease. A deed older than the unit may name one of them.

Buyers and gatherers

Companies named on the Form P-4, by product
CompanyProductRoleShare%FromUntil
Phillips 66 CompanyOilGathers100Aug 1, 2022–
Energy Transfer CompanyCasinghead gasBuys100Jul 1, 2021–
Energy Transfer CompanyCasinghead gasGathers100Sep 1, 2017–
Dupre Logistics LLCOilGathers50Jul 1, 2021Aug 1, 2022
Genesis Crude Oil, L.p.OilGathers50Aug 10, 2013Aug 1, 2022
Energy Transfer CompanyCasinghead gasBuys50Jun 1, 2017Jul 1, 2021
Etc Texas P/L, LTDCasinghead gasBuys50Aug 1, 2018Jul 1, 2021
Enterprise Crude Oil LLCOilGathers50Aug 10, 2013Jul 1, 2021

SourceRailroad Commission Form P-4 file, Oct 24, 2026 (source).

198.48 acres on the newest permit

  • Good to know

    A pooling certificate (P-12) was filed

    Your tract may share its production with neighbors in a pooled unit. The unit acres the operator uses to divide production can differ from the acreage on one permit.

  • Good to know

    The wells on this lease state different acreage

    The permits state between 198.47 and 198.48 acres. Use the acres from your own division order for the well you are paid on.

  • Worth asking

    A Rule 37 case is listed

    The RRC permit records list a Rule 37 case. This does not establish your royalty share. Ask for the permit and unit plat for your well.

Check your decimal on this lease
Permits for Adele Dubose Unit A
API numberWell no.Acreson the permit
42-177-34551101198.48
42-177-329312RA198.47
42-177-328631198.48

SourceRailroad Commission drilling permits, Oct 31, 2026 (source 1, source 2).

On the Gonzales County roll

Gonzales County Appraisal District

2026 roll
Owners
12
Accounts
13
Appraised in all
$737k$736,620

Each square is one account

  • Royalty11
  • Overriding royalty1
  • Working interest1

SourceGonzales County Appraisal District, 2026 mineral roll (source), read Oct 7, 2026. Accounts matched to this lease by RRC number or lease name; no owner is named.

Estimate your royalty

36 months, newest first

Ledger for ADELE DUBOSE UNIT A
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3FlaredmcfWTI$/bblHenry Hub$/MMBtu
Aug 2026574580000$83.90$2.78
Jul 20269019081,7941,35642$80.46$2.89
Jun 20268978872,2201,7312$84.81$3.15
May 20267817997526032$102.13$2.94
Apr 20268138072,0061,6202$100.32$2.77
Mar 20267077011,8181,4855$91.38$3.04
Feb 20267747622,4402,1422$64.51$3.62
Jan 20269089213,1962,75523$60.04$7.72
Dec 20251,2701,2704,2733,71243$57.97$4.26
Nov 20251,0249841,3759573$60.06$3.79
Oct 20251,1991,2144,9004,27876$60.89$3.19
Sep 20251,3581,3925,4204,8174$63.96$2.97
Aug 20251,4061,3686,7226,0243$64.86$2.91
Jul 20251,2671,2705,4554,8753$68.39$3.20
Jun 20251,1711,1745,9305,38939$68.17$3.02
May 20251,3711,3536,9476,35736$62.17$3.12
Apr 20251,2091,2335,0904,5801$63.54$3.42
Mar 20251,4221,4375,5084,9970$68.24$4.12
Feb 20251,7551,7435,1704,53713$71.53$4.19
Jan 20252,3982,4007,3086,21030$75.74$4.13
Dec 20242,6612,6669,4538,2630$70.12$3.01
Nov 20242,7682,7928,7797,6283$69.95$2.12
Oct 20243,1763,1539,5858,48741$71.99$2.20
Sep 20243,4843,52811,2529,98266$70.24$2.28
Aug 20244,0744,07314,96713,58549$76.68$1.99
Jul 20244,8724,90417,04215,53335$81.80$2.07
Jun 20245,8825,85120,43618,45246$79.77$2.54
May 20249,3219,33727,36625,747124$80.02$2.12
Apr 202412,62412,75226,34925,034104$85.35$1.60
Mar 202413,93313,80618,42517,46368$81.28$1.49
Feb 202414,57914,60321,16220,3606$77.25$1.72
Jan 202416,03116,03423,10022,069197$74.15$3.18
Dec 20233,2643,1242,7742,48015$71.90$2.52
Nov 202300000$77.69$2.71
Oct 202300000$85.64$2.98
Sep 202318118845400$89.43$2.64

SourceTexas Railroad Commission Production Data Query, through Aug 2026. Prices: EIA.

How to check your stub against this lease Checks stopped on this lease? See the likely reasons

Do your checks match this lease?

Check my statement

Nearby

Verdun Oil & Gas LLC in Gonzales County

All Verdun Oil & Gas LLC leases →

Eagleville (Eagle Ford-1) field

All leases in this field →

Leases within 10 km

Drilling permits within 10 km