Skip to content

Texas oil lease · RRC district 03 · Lease 09023

Producing

ATTRIDGE

Attridge is an oil lease in Jefferson County, Texas, operated by Shoco Production LLC in the Stowell (Sullivan LF) field. The Railroad Commission shows 433 bbl of oil in the 12 months through Jun 2026.

Oil lease dossier · 3 wells

433bbl oil, last 12 months−64% vs prior year
RRC lease
03-09023

Own a share of this lease?

Is your check right?

Upload a check stub or a phone photo. We compare every month with the state numbers on this page.

Check my statement

Free. No account needed. Two to four pages.

Where it sits

This county

Jefferson CountyJeffersonOrangeChambersHardinLibertyJefferson County
Jefferson County · RRC district 03Open Jefferson County →
Oil in Jun 2026
33 bbl
Reporting to the state
since Jan 2020
Wells
3
Data through
Jun 2026

Production

Month by month, from the state record

What the Railroad Commission says this oil lease produced. Oil is in barrels (bbl). Gas is in thousand cubic feet (mcf).

Oil output fell 64% over the last 12 months

361 bbl in the 12 months through Jul 2026, against 1,010 bbl in the 12 months before. Jul 2026 was not reported. A red cross marks each one.

  • Oil (bars, left axis)
  • Gas (line, right axis)
  • Last 12 months
Oil output fell 64% over the last 12 monthsMonthly oil production and gas for ATTRIDGE, Aug 2023 to Jul 2026. Oil output fell 64% over the last 12 months. 361 bbl in the 12 months through Jul 2026, against 1,010 bbl in the 12 months before.Last 12 months: 361 bblbbl per monthmcf per month0025205040756010080125100Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output fell 64% over the last 12 monthsMonthly oil production and gas for ATTRIDGE, Aug 2023 to Jul 2026. Oil output fell 64% over the last 12 months. 361 bbl in the 12 months through Jul 2026, against 1,010 bbl in the 12 months before.Last 12 monthsbbl per monthmcf per month0025205040756010080125100Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, oil lease 09023, district 03. Reported through Jul 2026. The state revises recent months.

Gas disposition

Where the gas went

Every month the operator tells the state where each mcf of gas went, using a code. The code decides how your gas is paid.

All of the gas went to a transmission line in the last 12 months

Each bar is one month. Colors are the disposition codes the operator reported.

All of the gas went to a transmission line in the last 12 monthsShare of ATTRIDGE gas by disposition code each month, Aug 2023 to Jul 2026. All of the gas went to a transmission line in the last 12 months. Share of the lease’s gas by disposition code, per month0%50%100%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
All of the gas went to a transmission line in the last 12 monthsShare of ATTRIDGE gas by disposition code each month, Aug 2023 to Jul 2026. All of the gas went to a transmission line in the last 12 months. Share of gas by disposition code0%50%100%Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas disposition by code, lease 09023, district 03. Reported through Jul 2026.

Transmission line (2)

Sold straight into a pipeline without processing. Processing fees on your statement would be worth asking about.

None of the gas was flared in the last 12 months.

Operator history

Who has run this lease

The operator runs the wells and pays your royalty. When the operator changes, payments often slip for a month or two.

The operator changed once, most recently in Jun 2020

If your statements skip or shrink around a change, ask the new operator's owner relations department whether the month is in suspense.

Operators of this lease over timeShoco Production, L.P., Jan 2020 to May 2020; Shoco Production LLC, Jun 2020 to Jun 20262020202120222023202420252026Changed Jun 2020Shoco Production, L.P.Jan 2020 to May 2020Shoco Production LLCJun 2020 to now
Operators of this lease over timeShoco Production, L.P., Jan 2020 to May 2020; Shoco Production LLC, Jun 2020 to Jun 20262020202120222023202420252026Changed Jun 2020Shoco Production, L.P.Jan 2020 to May 2020Shoco Production LLCJun 2020 to now

SourceTexas Railroad Commission Production Data Query, operator by month. Reported through Jul 2026.

Wells

3 wells on this lease

Every well the Railroad Commission links to oil lease 09023 in district 03. The API number is the state’s ID for a well.
Wells on ATTRIDGE
API numberWell no.Status
42-245-025562Active
42-245-326731Shut-in
42-245-327274Active

SourceTexas Railroad Commission Wellbore Query, district 03, lease 09023.

Who buys and gathers

Who moves and buys this lease's production

The operator files a Form P-4 with the Railroad Commission naming the companies authorised to gather and buy the oil and gas. The buyer's price is the one your royalty is figured on.
  • Oil

    Gulfmark Energy, Inc. gathers it.

    100% of it, on the list since Nov 1, 2012

  • Gas from oil wells

    Dcp Operating Company, LP buys and gathers it.

    Dcp Operating Company, LP buys it: 100% of it, on the list since Apr 1, 2017 · Dcp Operating Company, LP gathers it: 100% of it, on the list since Dec 1, 2018

SourceRailroad Commission of Texas, Form P-4 file, dated Sep 24, 2026 (source). A listed company is authorised to move or buy the production; the state does not say what it paid.

Unit and wells

40 acres on the newest permit

Acres and wells as the operator filed them on its Railroad Commission drilling permits. Your decimal is your net acres over the unit acres, so this is the number to hold your division order against.
Wells on the permits
44 not plugged
Horizontal
0
First completion
Jun 12, 1969
Latest permit
Jan 9, 2019
Wells and acres on the permits for Attridge
API numberWell no.Acreson the permit
42-245-32727440
42-245-32673140
42-245-025562–
42-245-025562 T–

SourceRailroad Commission of Texas, drilling permits and wellbore file, Sep 26, 2026 (source 1, source 2). The acres are what the operator filed; they are not a survey.

Estimator

Estimate your royalty for this lease

A rough check before you look at a statement: the state volumes times your decimal, priced at WTI and Henry Hub.

Estimator

What could your check be?

Your decimal interest is the small number on your division order that says what share of the whole lease (8/8ths) is yours. Type it in and we apply it to what the state says ATTRIDGE sold each month.

For example 0.00097656, or a fraction like 1/1024.

Dollars per barrel. Your statements show the gap your operator uses. Leave 0 to price oil at WTI.

Your estimate appears here

Enter your decimal to see an estimated royalty for each of the last 12 months this lease reported. Nothing you type leaves your browser.

An estimate, not your check

It ignores gathering and processing fees, taxes, plant products and the price your operator actually gets, so your statement will differ. Use it as a ceiling to compare against.

Ledger

36 months, newest first

Compare these numbers with your statements. Your share of a month is the “Oil sold” volume times your decimal. Scroll sideways on a phone.
Monthly production, disposition and prices for ATTRIDGE
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3Flaredmcf, code 4WTI$ per bblHenry Hub$ per MMBtu
Jul 2026No report–––––$80.46$2.89
Jun 2026Shoco Production330000$84.81$3.15
May 2026Shoco Production150000$102.13$2.94
Apr 2026Shoco Production240000$100.32$2.77
Mar 2026Shoco Production71139000$91.38$3.04
Feb 2026Shoco Production150000$64.51$3.62
Jan 2026Shoco Production40000$60.04$7.72
Dec 2025Shoco Production2941000$57.97$4.26
Nov 2025Shoco Production370000$60.06$3.79
Oct 2025Shoco Production500000$60.89$3.19
Sep 2025Shoco Production71144000$63.96$2.97
Aug 2025Shoco Production120000$64.86$2.91
Jul 2025Shoco Production720000$68.39$3.20
Jun 2025Shoco Production70150000$68.17$3.02
May 2025Shoco Production760000$62.17$3.12
Apr 2025Shoco Production78173000$63.54$3.42
Mar 2025Shoco Production69041410$68.24$4.12
Feb 2025Shoco Production9818311110$71.53$4.19
Jan 2025Shoco Production1060110$75.74$4.13
Dec 2024Shoco Production8554110$70.12$3.01
Nov 2024Shoco Production87173000$69.95$2.12
Oct 2024Shoco Production89027270$71.99$2.20
Sep 2024Shoco Production9016855550$70.24$2.28
Aug 2024Shoco Production90062620$76.68$1.99
Jul 2024Shoco Production10210337370$81.80$2.07
Jun 2024Shoco Production8413533330$79.77$2.54
May 2024Shoco Production640330$80.02$2.12
Apr 2024Shoco Production8314133330$85.35$1.60
Mar 2024Shoco Production8617473730$81.28$1.49
Feb 2024Shoco Production841795950$77.25$1.72
Jan 2024Shoco Production81029290$74.15$3.18
Dec 2023Shoco Production8313553530$71.90$2.52
Nov 2023Shoco Production79059590$77.69$2.71
Oct 2023Shoco Production7816395950$85.64$2.98
Sep 2023Shoco Production10282000$89.43$2.64
Aug 2023Shoco Production66015150$81.39$2.58

No report filed More than 3% of gas flared

SourceVolumes: Texas Railroad Commission Production Data Query, reported through Jul 2026. Prices: EIA WTI Cushing spot and Henry Hub spot, monthly, through Aug 2026. “Gas sold” is gas sent to a transmission line (code 2) or a plant (code 3).

Check your statements

Do your checks match this lease?

Upload your statements for ATTRIDGE. We compare volumes, prices, deductions and timing with the state record and give you the exact question to ask Shoco Production LLC.

  • A month that was never paid
  • Your share of the barrels and mcf
  • The price against WTI and Henry Hub
  • Fees taken on gas
  • Late payment interest

Around this lease

Walk the neighborhood

Everything on this page connects to the operator, field and county records. Start from any of them.

Shoco Production LLC in Jefferson County

All Shoco Production LLC leases →

Stowell (Sullivan LF) field

All leases in this field →

Leases within 10 km

Found by the location of their wells.

Drilling permits within 10 km

How to read this page

Questions owners ask

What is a decimal interest?

It is your share of the whole lease, written as a decimal. A 1/4 royalty on 5 net acres in a 1,280-acre unit is 1/4 × 5 ÷ 1,280 = 0.00097656. Your division order states yours.

How do I use this page to check a royalty check?

Take the “Oil sold” volume for the month the check covers and multiply it by your decimal. The answer should match the barrels on your statement. If it does not, upload the statement and we will show where the two differ.

Why is the newest month Jun 2026?

The Railroad Commission publishes production two to three months after the fact and revises recent months. We re-pull the latest three months on every update.

Does this page show what my check should be?

No. It shows what the state recorded. Prices, fees and taxes depend on your lease and on what your operator gets for the oil and gas. The estimator gives a ceiling to compare against.

Sources and method

Where these numbers come from

  • Production and disposition by month: Texas Railroad Commission Production Data Query, oil lease 09023, district 03, reported through Jul 2026.
  • Wells: Texas Railroad Commission Wellbore Query.
  • Prices: U.S. Energy Information Administration, WTI Cushing spot and Henry Hub spot, monthly.
  • Page updated Sep 28, 2026.

We show the state’s numbers as filed. Where the state has no report for a month, we say so instead of guessing.

FAQ

Questions about ATTRIDGE

Who operates the ATTRIDGE lease?

The Railroad Commission lists Shoco Production LLC (operator number 778196) as the operator of this lease in Jefferson County, Texas. The operator history on this page shows earlier operators and when the record changed.

How much has the ATTRIDGE lease produced?

The lease reported 433 bbl of oil in the last 12 months through Jun 2026. Monthly figures for 35 months are in the ledger on this page, taken from the Railroad Commission's production data.

Does this page show who owns the royalty?

No. Railroad Commission records show who operates a lease and what it reported, not who owns the minerals or receives royalty. Your division order and royalty stub name the lease and your decimal interest.

How do I check my royalty stub against this lease?

Multiply the lease's volume for a month by your decimal interest and compare it with the barrels and mcf on your stub for the same month. The two are seldom identical, since sales and reporting months can differ, but a large gap is worth a question to the operator.

Check my statement