Skip to content
Royalty Clerk

Texas oil lease

Producing

BAD BRAINS STATE A2

Bad Brains State A2 is an oil lease in Reeves County, Texas, operated by Apache Corporation in the Wolfbone (Trend Area) field.

1 well

23,801bbl oil, last 12 months−35% vs prior year
RRC lease
08-59727

Is your check right?

Check my statement

Where it sits

This county

Reeves CountyReevesWinklerWardLovingReeves County
Reeves County
Gas, last 12 months
43,928 mcf
Oil in Jul 2026
1,412 bbl

Production by month

Oil output fell 35% over the last 12 months

  • Oil (bars)
  • Gas (line)
  • Last 12 months
Oil output fell 35% over the last 12 monthsMonthly oil production and gas for BAD BRAINS STATE A2, Aug 2023 to Jul 2026. Oil output fell 35% over the last 12 months. 23,801 bbl in the 12 months through Jul 2026, against 36,380 bbl in the 12 months before.Last 12 months: 23,801 bblbbl per monthmcf per month005,00010k10k20k15k30k20k40kOct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output fell 35% over the last 12 monthsMonthly oil production and gas for BAD BRAINS STATE A2, Aug 2023 to Jul 2026. Oil output fell 35% over the last 12 months. 23,801 bbl in the 12 months through Jul 2026, against 36,380 bbl in the 12 months before.Last 12 monthsbbl per monthmcf per month005,00010k10k20k15k30k20k40kJan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

Where the gas went

Since Aug 2024 the lease's gas goes to a transmission line instead of a processing plant

Flaring peaked at 100.0% of the gas in Jul 2026.

  • Processing plant (3)
  • Transmission line (2)
  • Lease fuel (1)
  • Flared (4)
Since Aug 2024 the lease's gas goes to a transmission line instead of a processing plantShare of BAD BRAINS STATE A2 gas by disposition code each month, Aug 2023 to Jul 2026. Since Aug 2024 the lease's gas goes to a transmission line instead of a processing plant. Flaring peaked at 100.0% of the gas in Jul 2026.Share of the lease’s gas by disposition code, per month0%50%100%Aug 2024: plant to lineFlared 100.0%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Since Aug 2024 the lease's gas goes to a transmission line instead of a processing plantShare of BAD BRAINS STATE A2 gas by disposition code each month, Aug 2023 to Jul 2026. Since Aug 2024 the lease's gas goes to a transmission line instead of a processing plant. Flaring peaked at 100.0% of the gas in Jul 2026.Share of gas by disposition code0%50%100%Aug 24: plant to lineFlared 100.0%Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

  • Transmission line (2)

    99% · 47,243 mcf

  • Flared (4)

    0.7% · 350 mcf

  • Lease fuel (1)

    0.5% · 242 mcf

0.7% of the gas flared in the last 12 months. 10 months above 3%.

Who has run this lease

The operator changed once, most recently in Aug 2024

Operators of this lease over timeCallon Petroleum Operating Co, Jul 2023 to Jul 2024; Apache Corporation, Aug 2024 to Jul 2026202420252026Changed Aug 2024Callon Petroleum Operating CoJul 2023 to Jul 2024Apache CorporationAug 2024 to now
Operators of this lease over timeCallon Petroleum Operating Co, Jul 2023 to Jul 2024; Apache Corporation, Aug 2024 to Jul 2026202420252026Changed Aug 2024Callon Petroleum Operating CoJul 2023 to Jul 2024Apache CorporationAug 2024 to now

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

1 well on this lease

Wells on BAD BRAINS STATE A2
API numberWell no.Status
42-389-4031918HActive

SourceTexas Railroad Commission Wellbore Query.

Buyers and gatherers

Companies named on the Form P-4, by product
CompanyProductRoleShare%FromUntil
Oryx Delaware Oil Transport LLCOilGathers75Mar 1, 2024–
Eastex Crude Company, LLCOilGathers15Mar 1, 2024–
Enterprise Crude Oil LLCOilGathers5Jul 4, 2023–
Plains Marketing, L.p.OilGathers5Jul 4, 2023–
Energy Transfer CompanyCasinghead gasBuys100Jul 4, 2023–
Kinetik Holdings LPCasinghead gasGathers100Mar 1, 2024–
Eagleclaw Midstream Ventures,llcCasinghead gasGathers100Jul 4, 2023Mar 1, 2024
Oryx Delaware Oil Transport LLCOilGathers90Jul 4, 2023Mar 1, 2024

SourceRailroad Commission Form P-4 file, Sep 24, 2026 (source).

640.81 acres on the newest permit

  • Worth asking

    An allocation well is on this lease

    A well drilled across several tracts shares its production by an allocation formula, so the decimal is not always your acres over the unit acres. Ask the operator for the allocation formula and the tract factor for your land.

  • Worth asking

    A Rule 37 case is listed

    The RRC permit records list a Rule 37 case. This does not establish your royalty share. Ask for the permit and unit plat for your well.

Check your decimal on this lease
Permits for Bad Brains State A2
API numberWell no.Acreson the permit
42-389-4031918H640.81

SourceRailroad Commission drilling permits, Oct 3, 2026 (source 1, source 2).

What APA Corporation told investors it received

Apache Corporation is linked to APA Corporation (APA).
Realized prices reported by APA Corporation
QuarterOil$ per bblFiling
Q2 2026$98.24SEC filing
Q1 2026$78.69SEC filing
Q4 2025$61.03SEC filing
Q3 2025$67.43SEC filing
Q2 2025$65.58SEC filing
Q1 2025$73.73SEC filing

SourceAPA Corporation quarterly reports, SEC EDGAR, company-wide averages before hedging.

Estimate your royalty

36 months, newest first

Ledger for BAD BRAINS STATE A2
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3FlaredmcfWTI$/bblHenry Hub$/MMBtu
Jul 2026Apache Corporation1,4121,4051750175$80.46$2.89
Jun 2026Apache Corporation1,3391,34114342101$84.81$3.15
May 2026Apache Corporation1,6041,6106916883$102.13$2.94
Apr 2026Apache Corporation2,3222,2843,8733,82944$100.32$2.77
Mar 2026Apache Corporation02000$91.38$3.04
Feb 2026Apache Corporation1231603183150$64.51$3.62
Jan 2026Apache Corporation2,4632,4615,6935,61718$60.04$7.72
Dec 2025Apache Corporation2,8592,8676,5676,5004$57.97$4.26
Nov 2025Apache Corporation3,1363,1246,6026,5412$60.06$3.79
Oct 2025Apache Corporation3,0673,0917,0226,9630$60.89$3.19
Sep 2025Apache Corporation2,9513,0076,3896,3890$63.96$2.97
Aug 2025Apache Corporation2,5252,4396,4556,4532$64.86$2.91
Jul 2025Apache Corporation1,4691,4563,9073,9061$68.39$3.20
Jun 2025Apache Corporation4855201,1561,13323$68.17$3.02
May 2025Apache Corporation2,6632,6615,9845,872112$62.17$3.12
Apr 2025Apache Corporation2,7392,7316,4176,40611$63.54$3.42
Mar 2025Apache Corporation3,9003,9449,4649,4631$68.24$4.12
Feb 2025Apache Corporation3,5833,5299,0058,853110$71.53$4.19
Jan 2025Apache Corporation3,4933,49910,08610,03314$75.74$4.13
Dec 2024Apache Corporation4,0544,0619,7869,638109$70.12$3.01
Nov 2024Apache Corporation3,6003,5898,2097,859318$69.95$2.12
Oct 2024Apache Corporation3,4383,43910,93910,721218$71.99$2.20
Sep 2024Apache Corporation3,1673,1659,5309,099431$70.24$2.28
Aug 2024Apache Corporation3,7893,8059,9699,028941$76.68$1.99
Jul 2024Callon Petroleum5,6565,67212,28511,802433$81.80$2.07
Jun 2024Callon Petroleum5,7675,80512,99511,989956$79.77$2.54
May 2024Callon Petroleum5,6585,68113,14312,673360$80.02$2.12
Apr 2024Callon Petroleum6,6196,62014,78914,59085$85.35$1.60
Mar 2024Callon Petroleum7,6037,60516,10915,97331$81.28$1.49
Feb 2024Callon Petroleum8,2388,21315,42515,158173$77.25$1.72
Jan 2024Callon Petroleum9,1589,17217,09215,8391,146$74.15$3.18
Dec 2023Callon Petroleum10,01910,05218,57817,949500$71.90$2.52
Nov 2023Callon Petroleum12,82512,84122,64918,6913,820$77.69$2.71
Oct 2023Callon Petroleum17,53617,54428,22727,842217$85.64$2.98
Sep 2023Callon Petroleum16,12116,11123,89221,6512,117$89.43$2.64
Aug 2023Callon Petroleum16,58416,56221,81021,487211$81.39$2.58

Flared above 3%

SourceTexas Railroad Commission Production Data Query, through Jul 2026. Prices: EIA, through Aug 2026. Updated Oct 2, 2026.

How to check your stub against this lease Checks stopped on this lease? See the likely reasons

Do your checks match this lease?

Nearby

Apache Corporation in Reeves County

All Apache Corporation leases →

Leases within 10 km

Drilling permits within 10 km