Skip to content

Texas gas well · RRC district 06 · Lease 261364

Producing

BATH UNIT

Bath Unit is a gas well in Rusk County, Texas, operated by Valence Operating Company in the Carthage (Haynesville Shale) field. The Railroad Commission shows 5,731 mcf of gas in the 12 months through Jul 2026.

Gas well dossier · 1 well

5,731mcf gas, last 12 months+311% vs prior year
RRC lease
06-261364

Own a share of this lease?

Is your check right?

Upload a check stub or a phone photo. We compare every month with the state numbers on this page.

Check my statement

Free. No account needed. Two to four pages.

Where it sits

This county

Rusk CountyRuskPanolaGreggUpshurShelbySmithHarrisonCherokeeRusk County
Rusk County · RRC district 06Open Rusk County →
Oil, last 12 months
50 bbl
Gas in Jul 2026
159 mcf
Reporting to the state
since Jan 2020
Wells
1

Production

Month by month, from the state record

What the Railroad Commission says this gas well produced. Oil is in barrels (bbl). Gas is in thousand cubic feet (mcf).

Gas output rose 311% over the last 12 months

5,731 mcf in the 12 months through Jul 2026, against 1,393 mcf in the 12 months before.

  • Gas (bars, left axis)
  • Oil (line, right axis)
  • Last 12 months
Gas output rose 311% over the last 12 monthsMonthly gas production and oil for BATH UNIT, Aug 2023 to Jul 2026. Gas output rose 311% over the last 12 months. 5,731 mcf in the 12 months through Jul 2026, against 1,393 mcf in the 12 months before.Last 12 months: 5,731 mcfmcf per monthbbl per month00500101,000201,500302,00040Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Gas output rose 311% over the last 12 monthsMonthly gas production and oil for BATH UNIT, Aug 2023 to Jul 2026. Gas output rose 311% over the last 12 months. 5,731 mcf in the 12 months through Jul 2026, against 1,393 mcf in the 12 months before.Last 12 monthsmcf per monthbbl per month00500101,000201,500302,00040Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas well 261364, district 06. Reported through Jul 2026. The state revises recent months.

Gas disposition

Where the gas went

Every month the operator tells the state where each mcf of gas went, using a code. The code decides how your gas is paid.

All of the gas went to a transmission line in the last 12 months

Each bar is one month. Colors are the disposition codes the operator reported.

All of the gas went to a transmission line in the last 12 monthsShare of BATH UNIT gas by disposition code each month, Aug 2023 to Jul 2026. All of the gas went to a transmission line in the last 12 months. Share of the lease’s gas by disposition code, per month0%50%100%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
All of the gas went to a transmission line in the last 12 monthsShare of BATH UNIT gas by disposition code each month, Aug 2023 to Jul 2026. All of the gas went to a transmission line in the last 12 months. Share of gas by disposition code0%50%100%Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas disposition by code, lease 261364, district 06. Reported through Jul 2026.

Transmission line (2)

Sold straight into a pipeline without processing. Processing fees on your statement would be worth asking about.

None of the gas was flared in the last 12 months.

Operator history

Who has run this lease

The operator runs the wells and pays your royalty. When the operator changes, payments often slip for a month or two.

Valence Operating Company has reported this lease for the whole period

No change of operator in the months we hold.

Operators of this lease over timeValence Operating Company, Jan 2020 to Jul 20262020202120222023202420252026Valence Operating CompanyJan 2020 to nowthrough Jul 2026
Operators of this lease over timeValence Operating Company, Jan 2020 to Jul 20262020202120222023202420252026Valence Operating CompanyJan 2020 to nowthrough Jul 2026

SourceTexas Railroad Commission Production Data Query, operator by month. Reported through Jul 2026.

Wells

1 well on this lease

Every well the Railroad Commission links to gas well 261364 in district 06. The API number is the state’s ID for a well.
Wells on BATH UNIT
API numberWell no.Status
42-401-351272Active

SourceTexas Railroad Commission Wellbore Query, district 06, lease 261364.

Who buys and gathers

Who moves and buys this lease's production

The operator files a Form P-4 with the Railroad Commission naming the companies authorised to gather and buy the oil and gas. The buyer's price is the one your royalty is figured on.
  • Condensate

    Eastex Crude Company, LLC gathers it.

    100% of it, on the list since Aug 1, 2026

  • Gas from gas wells

    Midcoast G & P (East Texas) L.p. buys it; Midcoast Pipelines (E Tx) L.p. gathers it.

    Midcoast G & P (East Texas) L.p. buys it: 100% of it, on the list since Feb 1, 2019 · Midcoast Pipelines (E Tx) L.p. gathers it: 100% of it, on the list since Feb 1, 2019

Companies that used to be listed: Plains Marketing, L.p. (gathers it, until Aug 1, 2026); Enbridge Pipelines (E. Tx) L.p. (gathers it, until Feb 1, 2019); Enbridge Pipelines (E. Tx) L.p. (buys it, until Feb 1, 2019).

SourceRailroad Commission of Texas, Form P-4 file, dated Sep 24, 2026 (source). A listed company is authorised to move or buy the production; the state does not say what it paid.

Unit and wells

453.89 acres on the newest permit

Acres and wells as the operator filed them on its Railroad Commission drilling permits. Your decimal is your net acres over the unit acres, so this is the number to hold your division order against.
Wells on the permits
11 not plugged
Horizontal
0
First completion
Jan 11, 2011
Latest permit
Jun 1, 2010
Wells and acres on the permits for Bath Unit
API numberWell no.Acreson the permit
42-401-351272453.89

SourceRailroad Commission of Texas, drilling permits and wellbore file, Sep 26, 2026 (source 1, source 2). The acres are what the operator filed; they are not a survey.

Estimator

Estimate your royalty for this lease

A rough check before you look at a statement: the state volumes times your decimal, priced at WTI and Henry Hub.

Estimator

What could your check be?

Your decimal interest is the small number on your division order that says what share of the whole lease (8/8ths) is yours. Type it in and we apply it to what the state says BATH UNIT sold each month.

For example 0.00097656, or a fraction like 1/1024.

Dollars per barrel. Your statements show the gap your operator uses. Leave 0 to price oil at WTI.

Your estimate appears here

Enter your decimal to see an estimated royalty for each of the last 12 months this lease reported. Nothing you type leaves your browser.

An estimate, not your check

It ignores gathering and processing fees, taxes, plant products and the price your operator actually gets, so your statement will differ. Use it as a ceiling to compare against. Regional gas prices are often below Henry Hub.

Ledger

36 months, newest first

Compare these numbers with your statements. Your share of a month is the “Gas sold” volume times your decimal. Scroll sideways on a phone.
Monthly production, disposition and prices for BATH UNIT
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3Flaredmcf, code 4WTI$ per bblHenry Hub$ per MMBtu
Jul 2026Valence Operating001591590$80.46$2.89
Jun 2026Valence Operating002022020$84.81$3.15
May 2026Valence Operating001881880$102.13$2.94
Apr 2026Valence Operating004384380$100.32$2.77
Mar 2026Valence Operating328398390$91.38$3.04
Feb 2026Valence Operating1648568560$64.51$3.62
Jan 2026Valence Operating421,3201,3200$60.04$7.72
Dec 2025Valence Operating2721,7291,7290$57.97$4.26
Nov 2025Valence Operating00000$60.06$3.79
Oct 2025Valence Operating00000$60.89$3.19
Sep 2025Valence Operating00000$63.96$2.97
Aug 2025Valence Operating00000$64.86$2.91
Jul 2025Valence Operating00000$68.39$3.20
Jun 2025Valence Operating00000$68.17$3.02
May 2025Valence Operating00000$62.17$3.12
Apr 2025Valence Operating00000$63.54$3.42
Mar 2025Valence Operating0098980$68.24$4.12
Feb 2025Valence Operating004264260$71.53$4.19
Jan 2025Valence Operating008698690$75.74$4.13
Dec 2024Valence Operating00000$70.12$3.01
Nov 2024Valence Operating00000$69.95$2.12
Oct 2024Valence Operating00000$71.99$2.20
Sep 2024Valence Operating00000$70.24$2.28
Aug 2024Valence Operating00000$76.68$1.99
Jul 2024Valence Operating00000$81.80$2.07
Jun 2024Valence Operating00000$79.77$2.54
May 2024Valence Operating0112000$80.02$2.12
Apr 2024Valence Operating00000$85.35$1.60
Mar 2024Valence Operating00000$81.28$1.49
Feb 2024Valence Operating00000$77.25$1.72
Jan 2024Valence Operating00000$74.15$3.18
Dec 2023Valence Operating002602600$71.90$2.52
Nov 2023Valence Operating003993990$77.69$2.71
Oct 2023Valence Operating002362360$85.64$2.98
Sep 2023Valence Operating003843840$89.43$2.64
Aug 2023Valence Operating005495490$81.39$2.58

No report filed More than 3% of gas flared

SourceVolumes: Texas Railroad Commission Production Data Query, reported through Jul 2026. Prices: EIA WTI Cushing spot and Henry Hub spot, monthly, through Aug 2026. “Gas sold” is gas sent to a transmission line (code 2) or a plant (code 3).

Check your statements

Do your checks match this lease?

Upload your statements for BATH UNIT. We compare volumes, prices, deductions and timing with the state record and give you the exact question to ask Valence Operating Company.

  • A month that was never paid
  • Your share of the barrels and mcf
  • The price against WTI and Henry Hub
  • Fees taken on gas
  • Late payment interest

Around this lease

Walk the neighborhood

Everything on this page connects to the operator, field and county records. Start from any of them.

Valence Operating Company in Rusk County

All Valence Operating Company leases →

Carthage (Haynesville Shale) field

All leases in this field →

Leases within 10 km

Found by the location of their wells.

Drilling permits within 10 km

How to read this page

Questions owners ask

What is a decimal interest?

It is your share of the whole lease, written as a decimal. A 1/4 royalty on 5 net acres in a 1,280-acre unit is 1/4 × 5 ÷ 1,280 = 0.00097656. Your division order states yours.

How do I use this page to check a royalty check?

Take the “Gas sold” volume for the month the check covers and multiply it by your decimal. The answer should match the mcf on your statement. If it does not, upload the statement and we will show where the two differ.

Why is the newest month Jul 2026?

The Railroad Commission publishes production two to three months after the fact and revises recent months. We re-pull the latest three months on every update.

Does this page show what my check should be?

No. It shows what the state recorded. Prices, fees and taxes depend on your lease and on what your operator gets for the oil and gas. The estimator gives a ceiling to compare against.

Sources and method

Where these numbers come from

  • Production and disposition by month: Texas Railroad Commission Production Data Query, gas well 261364, district 06, reported through Jul 2026.
  • Wells: Texas Railroad Commission Wellbore Query.
  • Prices: U.S. Energy Information Administration, WTI Cushing spot and Henry Hub spot, monthly.
  • Page updated Sep 28, 2026.

We show the state’s numbers as filed. Where the state has no report for a month, we say so instead of guessing.