Skip to content
Royalty Clerk

Texas oil lease

Producing

BETTY STETZ

Betty Stetz is an oil lease in Brazos County, Texas, operated by Wildfire Energy Operating LLC in the Aguila Vado (Eagleford) field.

2 wells

7,467bbl oil, last 12 months−2% vs prior year
RRC lease
05-04149

Is your check right?

Check my statement

Where it sits

This county

Brazos CountyBrazosWalkerFallsMadisonBurlesonLeeRobertsonGrimesMilamBrazos County
Brazos County
Gas, last 12 months
14,467 mcf
Oil in Jun 2026
359 bbl

Production by month

Oil output held steady over the last 12 months

Jul 2026 was not reported.

  • Oil (bars)
  • Gas (line)
  • Last 12 months
Oil output held steady over the last 12 monthsMonthly oil production and gas for BETTY STETZ, Aug 2023 to Jul 2026. Oil output held steady over the last 12 months. 6,977 bbl in the 12 months through Jul 2026, against 7,098 bbl in the 12 months before.Last 12 months: 6,977 bblbbl per monthmcf per month002505005001,0007501,5001,0002,0001,2502,500Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output held steady over the last 12 monthsMonthly oil production and gas for BETTY STETZ, Aug 2023 to Jul 2026. Oil output held steady over the last 12 months. 6,977 bbl in the 12 months through Jul 2026, against 7,098 bbl in the 12 months before.Last 12 monthsbbl per monthmcf per month002505005001,0007501,5001,0002,0001,2502,500Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

Where the gas went

Since Dec 2024 the lease's gas goes to a transmission line instead of lease fuel

  • Transmission line (2)
  • Lease fuel (1)
Since Dec 2024 the lease's gas goes to a transmission line instead of lease fuelShare of BETTY STETZ gas by disposition code each month, Aug 2023 to Jul 2026. Since Dec 2024 the lease's gas goes to a transmission line instead of lease fuel.Share of the lease’s gas by disposition code, per month0%50%100%Dec 2024: fuel to lineOct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Since Dec 2024 the lease's gas goes to a transmission line instead of lease fuelShare of BETTY STETZ gas by disposition code each month, Aug 2023 to Jul 2026. Since Dec 2024 the lease's gas goes to a transmission line instead of lease fuel.Share of gas by disposition code0%50%100%Dec 24: fuel to lineJan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

  • Transmission line (2)

    97% · 13,991 mcf

  • Lease fuel (1)

    3.3% · 476 mcf

Who has run this lease

The operator changed once, most recently in Jun 2024

Operators of this lease over timeApache Corporation, Jan 2020 to May 2024; Wildfire Energy Operating LLC, Jun 2024 to Jun 20262020202120222023202420252026Changed Jun 2024Apache CorporationJan 2020 to May 2024Wildfire Energy Operating LLCJun 2024 to now
Operators of this lease over timeApache Corporation, Jan 2020 to May 2024; Wildfire Energy Operating LLC, Jun 2024 to Jun 20262020202120222023202420252026Changed Jun 2024Apache CorporationJan 2020 to May 2024Wildfire Energy Operating LLCJun 2024 to now

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

2 wells on this lease

Wells on BETTY STETZ
API numberWell no.Status
42-041-322391HActive
42-041-322402HActive

SourceTexas Railroad Commission Wellbore Query.

Buyers and gatherers

Companies named on the Form P-4, by product
CompanyProductRoleShare%FromUntil
Shell Trading (Us) CompanyOilGathers100May 1, 2021–
Energy Transfer CompanyCasinghead gasGathers100Aug 3, 2014May 1, 2021
Energy Transfer CompanyCasinghead gasBuys100Aug 3, 2014May 1, 2021
Buckhead Midstream, LLCOilGathers100Jun 1, 2020May 1, 2021
Sunoco Ptnrs. Mktg.&terminals LPOilGathers100Apr 1, 2016Jun 1, 2020

SourceRailroad Commission Form P-4 file, Sep 24, 2026 (source).

380.36 acres on the newest permit

Permits for Betty Stetz
API numberWell no.Acreson the permit
42-041-322391H380.36
42-041-322402H380.36

SourceRailroad Commission drilling permits, Oct 3, 2026 (source 1, source 2).

Estimate your royalty

36 months, newest first

Ledger for BETTY STETZ
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3FlaredmcfWTI$/bblHenry Hub$/MMBtu
Jul 2026No report–––––$80.46$2.89
Jun 2026Wildfire Energy3594839959610$84.81$3.15
May 2026Wildfire Energy5994281,6381,5780$102.13$2.94
Apr 2026Wildfire Energy5085662,0311,9620$100.32$2.77
Mar 2026Wildfire Energy5064742,1772,1040$91.38$3.04
Feb 2026Wildfire Energy5045321,8021,7500$64.51$3.62
Jan 2026Wildfire Energy7048851,3431,3020$60.04$7.72
Dec 2025Wildfire Energy1,0169371,1331,0970$57.97$4.26
Nov 2025Wildfire Energy6025651,4001,3550$60.06$3.79
Oct 2025Wildfire Energy7317587987720$60.89$3.19
Sep 2025Wildfire Energy6836474924750$63.96$2.97
Aug 2025Wildfire Energy7657333853720$64.86$2.91
Jul 2025Wildfire Energy4904742732630$68.39$3.20
Jun 2025Wildfire Energy5217932552460$68.17$3.02
May 2025Wildfire Energy5624162912810$62.17$3.12
Apr 2025Wildfire Energy6355904093940$63.54$3.42
Mar 2025Wildfire Energy4295661941870$68.24$4.12
Feb 2025Wildfire Energy5974622242120$71.53$4.19
Jan 2025Wildfire Energy6315172122010$75.74$4.13
Dec 2024Wildfire Energy5366271801170$70.12$3.01
Nov 2024Wildfire Energy5935613661330$69.95$2.12
Oct 2024Wildfire Energy7107064791710$71.99$2.20
Sep 2024Wildfire Energy6837415271940$70.24$2.28
Aug 2024Wildfire Energy711707241610$76.68$1.99
Jul 2024Wildfire Energy80679444420$81.80$2.07
Jun 2024Wildfire Energy6647664984630$79.77$2.54
May 2024Apache Corporation7587754504150$80.02$2.12
Apr 2024Apache Corporation7405357737440$85.35$1.60
Mar 2024Apache Corporation5707206906610$81.28$1.49
Feb 2024Apache Corporation5795913953730$77.25$1.72
Jan 2024Apache Corporation6986445345020$74.15$3.18
Dec 2023Apache Corporation7447004484210$71.90$2.52
Nov 2023Apache Corporation6796343223040$77.69$2.71
Oct 2023Apache Corporation6289262642360$85.64$2.98
Sep 2023Apache Corporation6294681701350$89.43$2.64
Aug 2023Apache Corporation6436573302940$81.39$2.58

No report filed

SourceTexas Railroad Commission Production Data Query, through Jul 2026. Prices: EIA, through Aug 2026. Updated Oct 2, 2026.

How to check your stub against this lease Checks stopped on this lease? See the likely reasons

Do your checks match this lease?

Nearby

Wildfire Energy Operating LLC in Brazos County

All Wildfire Energy Operating LLC leases →

Aguila Vado (Eagleford) field

All leases in this field →

Leases within 10 km

Drilling permits within 10 km