Skip to content
A-153 · SEC. 7 · BBB&C RR CO1A-153SEC. 7 · BBB&C RR COBP CHEYENNE · 44 ACRESN500 m30.6479° N 94.2919° W · PHOTO: U.S. GEOLOGICAL SURVEY

Texas oil leaseRRC 03-26732Last oil or gas reported Jun 2023

BP Cheyenne

No oil or gas produced in its last 12 months on record, through June 2023. Of the 12 months, 11 with a report on file showing no oil and no gas and 1 with a report on file showing a sale and nothing produced. No report after June 2023 is on file; the State's newest month is August 2026.

Is your family on this lease?

Email me when this lease changesI own here

County
Tyler
On record since
February 2015
Newest report on file
June 2023
Unit on the newest permit
44 acres

Outline: the original land surveys this lease's wells sit in. The State publishes no lease outlines. RRC surveys, 2026-09-29.

Eight things the public record says about this lease. Each one sets two records side by side, and one that finds nothing still shows and says so. Photo: U.S. Geological Survey.

No oil or gas reported in the 12 months through August 2026

Oil or gas was last reported for June 2023

Its whole life in the Railroad Commission's monthly reports, which start in January 1993; it first reported in January 2015. Royalty owners and their heirs can still be on the county roll after the checks stop.

  1. January 2015First report
  2. 2015The year it sold the most
  3. Davis Southern Operating Co LLCLast operator, from January 2020
  4. June 2023Last production
  5. 118 monthsNo oil or gas reported, August 2016 to May 2026
3,086

barrels of oil sold since January 2015.

1,923

thousand cubic feet of gas sold since January 2015.

$159,000

what it all sold for at each month's public prices, 100% of the lease.

SourceRailroad Commission production reports since January 1993 (oil and gas sold); EIA prices, through August 2026.

The story, from 101 monthly reports

On record since February 2015

Oil sold each month since February 2015The numbers match the paragraphs below
20162018202020221Feb 20152June 2023Feb 2015 onward

February 2015: the first month the lease sold oil on record, 202 barrels.

June 2023 is the newest monthly production report on file.

SourceRailroad Commission production reports, February 2015 through June 2023. Not a forecast, not reserves.

Checks stopped on this lease?

Wells

The one well on this lease is marked plugged.

SourceRailroad Commission production, P-5 and P-4 records, data through August 2026.See why checks stop on this lease

101 months against 7 other recordsNew

Every month since February 2015, and what else happened that month

The lease is the line on top. Under it, on the same clock: the weather, the State, the price, the wells next door, who ran the lease, who bought from it and the rest of the field. Move across it.

Nov 2015
Nothing reported this month
Oil averaged $42.44 a barrel · Davis Southern Operating Co LLC
  • Nothing else on record this month.
SINCEFEB 201520162018202020220150300450600BARRELS A MONTHLAST 12 MONTHS12WEATHERTHE STATEOIL PRICENEXT DOOROPERATORBUYERSTHE FIELDDavis Southern Operating Co LLC20162017201820192020202120222023
Two drops

Move the pointer or drag across the chart. The numbered buttons jump to each drop.

Monthly oil sold from this lease since February 2015, with eight record tracks beneath it. Use the left and right arrow keys to move month by month.. 101 months from February 2015 to June 2023. The most in one month: 565 barrels, August 2015. The newest month: 142 barrels. 88 months with nothing reported. Moments marked: 1, Oct 2015; 2, Nov 2015.

SourcesProduction, cut-offs, operators and buyers: Railroad Commission of Texas. Weather: NOAA. Prices: U.S. Energy Information Administration. Fracs: FracFocus. A record in the same month is not proof of a cause. Through June 2023.

Royalty Watch tells you the month a drop starts, with the records from that month.Watch this lease

137 months, one line eachNew

No production was reported from August 2016 through May 2026

A gap is a month with no oil and no gas reported. Many leases end after 60 to 90 days without production unless the lease says otherwise.

118

months in a row with nothing reported, from August 2016 through May 2026. Of the 118 months, 80 with a report on file showing no oil and no gas, 3 with a report on file showing a sale and nothing produced and 35 with no report on file.

142

barrels of oil on the newest report on file with oil or gas, for June 2023. No report after June 2023 is on file; the State's newest month is August 2026.

19

of 137 months with oil or gas reported since January 2015.

January 2015Taller line, more oil soldMay 2026
201620182020202220242026ENLARGED BELOW

A shut-in payment or work on the wells can keep a lease alive through a gap. Your own lease paper decides.

SourceRailroad Commission production reports, January 2015 through May 2026. The newest months, after May 2026, are left out of the count because reports arrive late.

Royalty Watch tells you when a silent month starts, and drafts the letter asking whether the lease is still in force.Watch this lease

9 years of state records, 2015 to 2023

Sold since February 2015

$159,000

Only filed sales with a published price are included. Some sales figures or prices are unavailable.

Oil sold
3,086barrels
Gas sold
1,923thousand cubic feet
Sold each year, at that month's pricesOilGas
What the oil and gas from this lease sold for each year, 2015 to 2023, at each month's public prices.
YearOil, dollarsGas, dollarsTotal
2015$113,000$5,330$118,000
2016$20,000Unavailable$20,000 in priced filings
2017$0UnavailableUnavailable
2018$11,100Unavailable$11,100 in priced filings
2019$0UnavailableUnavailable
2020$0$0$0
2021$0$0$0
2022$0$0$0
2023, 2023 so far$9,980$0$9,980

Did a relative own a share of this lease?

The bars show every year. Pick one to add up what the lease has sold since.

SourcesRailroad Commission Production Data Query, every monthly report since February 2015. EIA monthly WTI and Henry Hub prices. 2023 is part of a year, drawn lighter. Not a forecast, not reserves.

The newest well, seen from the side

No well on the way. Well 1 was completed in January 2015.

ground2,000 ft4,000 ft6,000 ft16,000 ft deep
  1. Permit filedNot on file
  2. Drilling startedNot on file
  3. FrackedNot on file
  4. Completion filedJanuary 23, 2015
  5. First production on the leaseNot on file
  6. First checkNot on file

SourcesRailroad Commission drilling permits and well records, and the FracFocus registry. Lease record built November 18, 2026.

Royalty Watch follows new well permits and completions on this lease.Watch this lease

About 6 miles across

Wells on this lease and around it

1this lease, ringed
21producing
0fracked and waiting
3permits, last 24 months
9plugged
56original land surveys

For a lawyer, a buyer or a probate file. Wells and permits within about 2 miles. Railroad Commission of Texas, FracFocus and USGS imagery.

Use this map on your site

You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.

Download the picture (WebP)
<a href="https://royaltyclerk.com/texas/leases/bp-cheyenne-03-26732"><img src="https://royaltyclerk.com/maps/lease-wells/bp-cheyenne-03-26732.svg" alt="Map of the BP Cheyenne lease in Tyler County, Texas: its well ringed, among 33 wells and 3 recent drilling locations in a picture about 6 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/leases/bp-cheyenne-03-26732">Wells on the BP Cheyenne lease, Tyler County, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>

From the State's well records

One well on this lease

Wells on BP Cheyenne
WellAPI numberCompletedDepthfeetToday
142-457-30864January 20156,000Plugged

SourceRailroad Commission wellbore and completion records.

Other leases on these wells

The Railroad Commission files the same API numbers under one more lease too: a well keeps its number when it moves into a unit or is recompleted under another lease. A deed older than the unit may name one of them.

BP Cheyenne (Tyler County, 1 shared well)

What the drilling permits say

44acres on the newest permit

44 ACRES
  • 44 acres, on the 2016 permits
Check your decimal on this lease

Oil · last sale month, June 2023 New

Four prices for the same oil

Last sale June 2023. WTI $70.25 in June 2023, the last sale month.

$70.25
The marketEIA WTI, June 2023, the last sale month
not on file
Told its investorsNo comparable investor filing on file.
not on file yet
Told the tax officeTexas Comptroller, this lease
?
Your statementOnly you hold this one.

Texas Comptroller

Lower tax on record?

No lower tax approval appears on the Comptroller’s list for this lease.

EIA record dated October 1, 2026

Estimate your royalty

Type the decimal from your division order

The starting decimal is an example. Nothing you type here leaves this page.

$3.25a month

At these prices the whole lease’s reported sales were about $9,980 over 12 reported months. Your estimated share is $39 before taxes and deductions.

Monthly owner volumes and values
Estimated share before tax and deductions
MonthOil (bbl)Oil valueGas (mcf)Gas valueTotal
June 20230.5547$38.970$0.00$38.97
May 20230$0.000$0.00$0.00
April 20230$0.000$0.00$0.00
March 20230$0.000$0.00$0.00
February 20230$0.000$0.00$0.00
January 20230$0.000$0.00$0.00
December 20220$0.000$0.00$0.00
November 20220$0.000$0.00$0.00
October 20220$0.000$0.00$0.00
September 20220$0.000$0.00$0.00
August 20220$0.000$0.00$0.00
July 20220$0.000$0.00$0.00

SourcesRailroad Commission monthly production, EIA WTI, SEC filings and Texas Comptroller records.

Watch Plus sets public prices beside the price on your statement.See Watch Plus

Who takes the oil and gasNew

No buyer shares an owner with the operator

The State lists who gathers and who buys from each lease. Company filings list who owns whom. Here they are on one drawing.

OIL
Runs the leaseDavis Southern Operating Co LLCsince January 2015
Gathers 34%ENERGY TRANS CRUDE MARKETING LLCsince July 2021

No shared owner, officer or address on record between the oil buyers and the operator.

Also on the P-4: PHILLIPS 66 COMPANY gathers 33% and SUNOCO PTNRS. MKTG.&TERMINALS LP gathers 33%.

GAS
Runs the leaseDavis Southern Operating Co LLCsince January 2015
Gathers 100%ENTERPRISE PRODUCTS OPERATING LLCsince March 2019
Buys 100%DAVIS SOUTHERN OPERATING CO LLCsince January 2015

No shared owner, officer or address on record between the gas buyers and the operator.

Earlier buyers and gatherers, back to 1993
Earlier companies named on the Form P-4
CompanyProductRoleFromUntil
SUNOCO PTNRS. MKTG.&TERMINALS LPOilGathersMar 2019Jul 2021
PHILLIPS 66 COMPANYOilGathersMar 2019Jul 2021
SUNOCO PTNRS. MKTG.&TERMINALS LPOilGathersJan 2015Mar 2019
ENERGY TRANSFER COMPANYGasGathersJan 2015Mar 2019

SourcesBuyers and gatherers: Railroad Commission Form P-4 records, as of October 24, 2026. Ownership: U.S. Securities and Exchange Commission filings.

Royalty Watch tells you the day the buyer of your oil or gas changes.Watch this lease

Seen from space

Heat at the pad, beside reported gas use

A-153 · SEC. 7 · BBB&C RR COONE SATELLITE PIXEL, ABOUT 375 M
DAYNIGHT

Satellite match

Not matched

The lease’s newest month on record, June 2023, is before the satellites’ record begins in February 2024.

—

nights of heat

—

months with reported flaring (disposition records unavailable)

—

months with heat and none reported

SourcesNOAA VIIRS night readings and Railroad Commission gas disposition reports. Satellite record through November 17, 2026.

Watch Plus checks statement months beside the satellite record.See Watch Plus

The county appraisal roll

No public roll figures

County mineral roll

No public roll figures

There are no publishable figures for this lease from the 2026 county mineral roll.

Royalty Clerk has mineral rolls for 158 Texas counties.

Source County appraisal district mineral rolls.

From the state record

Ask a question about BP Cheyenne

The available public records have no additional lease-specific answers as of November 22, 2026.

Every monthly report the State holds

101 months, newest first

Ledger for BP Cheyenne
MonthOil soldbarrelsGas soldthousand cubic feetFlared or ventedthousand cubic feetSold forat public prices
JuneJun 202314200$9,980
MayMay 2023No oil or gas reported
AprilApr 2023No oil or gas reported
MarchMar 2023No oil or gas reported
FebruaryFeb 2023No oil or gas reported
JanuaryJan 2023No oil or gas reported
DecemberDec 2022No oil or gas reported
NovemberNov 2022No oil or gas reported
OctoberOct 2022No oil or gas reported
SeptemberSep 2022No oil or gas reported
AugustAug 2022No oil or gas reported
JulyJul 2022No oil or gas reported
JuneJun 2022No oil or gas reported
MayMay 2022No oil or gas reported
AprilApr 2022No oil or gas reported
MarchMar 2022No oil or gas reported
FebruaryFeb 2022No oil or gas reported
JanuaryJan 2022No oil or gas reported

SourcesTexas Railroad Commission Production Data Query, through June 2023. Prices: EIA.

Do your checks match this lease?

Check my statement

Likely owed Jan 2025

A whole month was never paid

The state shows 28,175 bbl of oil sold from this lease in January 2025, so your share is 27.51 bbl. No statement covers January 2025. That is the month the operator changed from Endeavor Energy Resources to Diamondback.

Ask Diamondback owner relations: is January 2025 being held in suspense after the change of operator?

$2,277oil + gas

A sample finding, from our example check. The full example found $3,328 likely owed.

Around this lease

Nearby

Davis Southern Operating Co LLC in Tyler County

All Davis Southern Operating Co LLC leases

Leases within 10 km

Drilling permits within 10 km

  • BP SITTIN ON GO #2recompletion · Davis Southern Operating Co LLC · Jul 24, 2026 · 9.3 km
  • BP SITTIN ON GO #3recompletion · Davis Southern Operating Co LLC · Apr 30, 2026 · 9.3 km
  • BP CATS BACK #1recompletion · Davis Southern Operating Co LLC · Mar 26, 2026 · 2.5 km
  • BP CATS BACK #2recompletion · Davis Southern Operating Co LLC · May 9, 2025 · 2.4 km
  • RONEL TOUCHING CREEK #1recompletion · Davis Southern Operating Co LLC · Mar 26, 2025 · 2.8 km

Same name in district 03

Where it sits

This county

Tyler CountyTylerSan AugustineJasperSabineNewtonPolkAngelinaTyler County
Tyler County

Where this page comes from

  • Railroad Commission of Texas production, Form P-4, permits, wells
  • U.S. Energy Information Administration prices
  • NOAA storms and cold
  • U.S. Geological Survey photos