Texas gas wellRRC 09-224372Producing
Comanche Peak
One well on 1,088 acres in Hood County. The lease produced 14,027 thousand cubic feet of gas in the last 12 months, through August 2026.
- Operator
- Eagleridge Operating, LLC
- County
- Hood
- On record since
- September 2006
- Newest report on file
- August 2026
- Unit on the newest permit
- 1,088 acres
Outline: the original land surveys this lease's wells sit in. The State publishes no lease outlines. RRC surveys, 2026-09-29.
What the checks found on this lease
- 2 silent months. April to May 2015.
- 13 drops in production have no other record beside them in the same month, of 16 on record.
Checked, nothing found: operator changes, buyers, heat from space and new wells.
Not on file here, or only in part: price and tax.
Royalty Watch tells you the month any of this changes on your own lease: a silent month, a drop, a new buyer or a well's next stage.Watch this lease
The story, from 240 monthly reports
On record since September 2006
September 2006: the first month the lease sold gas on record, 7,453 thousand cubic feet.
April 2015 to May 2015: two months in a row with no oil and no gas reported.
July 2017: Eagleridge Operating, LLC took over.
August 2026 is the newest monthly production report on file.
SourceRailroad Commission production reports, September 2006 through August 2026. Not a forecast, not reserves.
Checks stopped on this lease?
No sales reported for the last 12 months of state data (through Aug 2026).
SourceRailroad Commission production, P-5 and P-4 records, data through August 2026.See why checks stop on this lease
240 months against 7 other recordsNew
Every month since September 2006, and what else happened that month
The lease is the line on top. Under it, on the same clock: the weather, the State, the price, the wells next door, who ran the lease, who bought from it and the rest of the field. Move across it.
Gas averaged $2.99 an mcf · Operator 870311
- Nothing else on record this month.
Move the pointer or drag across the chart. The numbered buttons jump to each drop.
Monthly gas sold from this lease since September 2006, with eight record tracks beneath it. Use the left and right arrow keys to move month by month.. 240 months from September 2006 to August 2026. The most in one month: 39,541 mcf, October 2006. The newest month: 0 mcf. 166 months with nothing reported. Moments marked: 1, Jan 2008; 2, Nov 2009; 3, Dec 2009; 4, May 2010; 5, Oct 2010; 6, Feb 2011; 7, Nov 2011; 8, Dec 2011.
SourcesProduction, cut-offs, operators and buyers: Railroad Commission of Texas. Weather: NOAA. Prices: U.S. Energy Information Administration. Fracs: FracFocus. A record in the same month is not proof of a cause. Through August 2026.
237 months, one line eachNew
Two months of silence in 2015
A gap is a month with no oil and no gas reported. Many leases end after 60 to 90 days without production unless the lease says otherwise.
months in a row with nothing reported, April to May 2015. Reports are on file for all 2 months, with no oil and no gas. The only silence on record here.
thousand cubic feet of gas on the newest report on file with oil or gas, for August 2026, the State's newest month.
of 237 months with oil or gas reported since September 2006.
thousand cubic feet of gas a day on average from September 2025 through August 2026, counting a month with no report on file as zero.
A shut-in payment or work on the wells can keep a lease alive through a gap. Your own lease paper decides.
SourceRailroad Commission production reports, September 2006 through May 2026. The newest months, after May 2026, are left out of the count because reports arrive late.
21 years of state records, 2006 to 2026
Sold since September 2006
$3.17million
Only filed sales with a published price are included. Some sales figures or prices are unavailable.
- Oil sold
- 1,582barrels
- Gas sold
- 469,770thousand cubic feet
| Year | Oil, dollars | Gas, dollars | Total |
|---|---|---|---|
| 2006 | $22,100 | $421,000 in priced filings | $443,000 in priced filings |
| 2007 | $37,200 | $1.2 million | $1.24 million |
| 2008 | $31,800 | $957,000 | $989,000 |
| 2009 | $12,500 | $264,000 | $277,000 |
| 2010 | $0 | $93,100 | $93,100 |
| 2011 | $186 | $80,100 | $80,300 |
| 2012 | $95 | $24,200 in priced filings | $24,300 in priced filings |
| 2013 | $0 | $18,600 | $18,600 |
| 2014 | $0 | $0 | $0 |
| 2015 | $6,460 | $5.56 in priced filings | $6,470 in priced filings |
| 2016 | $0 | $0 | $0 |
| 2017 | $326 | $0 | $326 |
| 2018 | $0 | $85 | $85 |
| 2019 | $51 | $0 | $51 |
| 2020 | $0 | $280 | $280 |
| 2021 | $0 | $0 | $0 |
| 2022 | $0 | $0 | $0 |
| 2023 | $0 | $0 | $0 |
| 2024 | $0 | $0 | $0 |
| 2025 | $0 | $0 | $0 |
| 2026, 2026 so far | $0 | $0 | $0 |
Did a relative own a share of this lease?
SourcesRailroad Commission Production Data Query, every monthly report since September 2006. EIA monthly WTI and Henry Hub prices. 2026 is part of a year, drawn lighter. Not a forecast, not reserves.
Who has run this lease
The operator changed three times, most recently in July 2017
The company named on each monthly report to the State. The operator is not always the company that pays.
- Eagleridge Operating, LLCJuly 2017 to now
- Operator number 870311March 2015 to June 2017
- Operator number 676024January 2011 to February 2015
- Burlington Resources O & G Co LPSeptember 2006 to December 2010
SourcesRailroad Commission production reports, the operator on each month’s report, September 2006 through August 2026.
The newest well, seen from the side
No well on the way. Well 5H was completed in September 2006.
- Permit filedNot on file
- Drilling startedNot on file
- FrackedNot on file
- Completion filedSeptember 21, 2006
- First production on the leaseNot on file
- First checkNot on file
SourcesRailroad Commission drilling permits and well records, and the FracFocus registry. Lease record built November 17, 2026.
About 6 miles across
Wells on this lease and around it
For a lawyer, a buyer or a probate file. Wells and permits within about 2 miles. Railroad Commission of Texas, FracFocus and USGS imagery.
From the State's well records
One well on this lease
| Well | API number | Completed | Sidewaysfeet | Depthfeet | Today |
|---|---|---|---|---|---|
| 5H | 42-221-31143 | September 2006 | 4,330 | 5,561 | Active |
SourceRailroad Commission wellbore and completion records.
What the drilling permits say
1,088acres on the newest permit
- 1,088 acres, on the 2006 permits
Gas · last sale month, May 2020 New
Four prices for the same gas
Last sale May 2020. Henry Hub $1.75 in May 2020, the last sale month.
Texas Comptroller
Lower tax on record?
No lower tax approval appears on the Comptroller’s list for this lease.
EIA record dated October 1, 2026Estimate your royalty
Type the decimal from your division order
The starting decimal is an example. Nothing you type here leaves this page.
$0a month
At these prices the whole lease’s reported sales were about $0 over 12 reported months. Your estimated share is $0 before taxes and deductions.
Monthly owner volumes and values
| Month | Oil (bbl) | Oil value | Gas (mcf) | Gas value | Total |
|---|---|---|---|---|---|
| August 2026 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| July 2026 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| June 2026 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| May 2026 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| April 2026 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| March 2026 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| February 2026 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| January 2026 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| December 2025 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| November 2025 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| October 2025 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| September 2025 | 0 | $0.00 | 0 | $0.00 | $0.00 |
SourcesRailroad Commission monthly production, EIA Henry Hub, SEC filings and Texas Comptroller records.
Watch Plus sets public prices beside the price on your statement.See Watch Plus
Who takes the oil and gasNew
No buyer shares an owner with the operator
The State lists who gathers and who buys from each lease. Company filings list who owns whom. Here they are on one drawing.
No shared owner, officer or address on record between the gas buyers and the operator.
No shared owner, officer or address on record between the oil buyers and the operator.
Earlier buyers and gatherers, back to 1993
| Company | Product | Role | From | Until |
|---|---|---|---|---|
| SUNOCO PTNRS. MKTG.&TERMINALS LP | Oil | Gathers | Mar 2015 | Dec 2022 |
| DCP TOLAR PIPELINE, LLC | Gas | Gathers | Jan 2011 | Apr 2020 |
Who buys my oilOil price check
SourcesBuyers and gatherers: Railroad Commission Form P-4 records, as of October 24, 2026. Ownership: U.S. Securities and Exchange Commission filings.
Seen from space, 2025New
No satellite heat at this pad in 2025
Weather satellites pass over Texas every night and record heat on the ground. Drag the photo from day to night. Beside it, each night of 2025 next to what the operator reported burning.
A lit dot is a night a satellite recorded heat within 500 m of a well on this lease. The red bar is gas reported vented or flared that month.
nights with heat recorded at this pad, 2025.
months in which flaring was reported.
months with heat seen and no flaring reported.
Where the gas went in 2025, as the operator reported it
SourcesHeat: NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data); the readings at this pad from NOAA-20, NOAA-21 and Suomi NPP, through November 23, 2026. Reported flaring and gas use: Railroad Commission production reports. Cloud hides heat, so the count of nights is a floor. The satellite records heat. It does not say what burned.
Watch Plus checks whether you were paid on gas in the months heat was seen.See Watch Plus
Where the gas went, month by month
All of the gas went to lease fuel in the last 12 months
Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.
SourcesRailroad Commission production reports, gas disposition by code, September 2023 to August 2026.
Hood County Appraisal District, 2026 mineral roll
14 accounts on the county roll
- Owners
- 12
- Accounts
- 14
- Appraised in all
- $33,700
Is one of these yours?
Each square is one account
- Other or not stated 14
SourceHood County Appraisal District, 2026 mineral roll (source), read October 7, 2026. Accounts matched to this lease by RRC number or lease name.
From the state record
Ask a question about Comanche Peak
The available public records have no additional lease-specific answers as of November 26, 2026.
Every monthly report the State holds
240 months, newest first
| Month | Oil soldbarrels | Gas soldthousand cubic feet | Flared or ventedthousand cubic feet | Sold forat public prices | Operator |
|---|---|---|---|---|---|
| AugustAug 2026 | No oil or gas reported | Eagleridge Operating, LLC | |||
| JulyJul 2026 | No oil or gas reported | Eagleridge Operating, LLC | |||
| JuneJun 2026 | No oil or gas reported | Eagleridge Operating, LLC | |||
| MayMay 2026 | No oil or gas reported | Eagleridge Operating, LLC | |||
| AprilApr 2026 | No oil or gas reported | Eagleridge Operating, LLC | |||
| MarchMar 2026 | No oil or gas reported | Eagleridge Operating, LLC | |||
| FebruaryFeb 2026 | No oil or gas reported | Eagleridge Operating, LLC | |||
| JanuaryJan 2026 | No oil or gas reported | Eagleridge Operating, LLC | |||
| DecemberDec 2025 | No oil or gas reported | Eagleridge Operating, LLC | |||
| NovemberNov 2025 | No oil or gas reported | Eagleridge Operating, LLC | |||
| OctoberOct 2025 | No oil or gas reported | Eagleridge Operating, LLC | |||
| SeptemberSep 2025 | No oil or gas reported | Eagleridge Operating, LLC | |||
| AugustAug 2025 | No oil or gas reported | Eagleridge Operating, LLC | |||
| JulyJul 2025 | No oil or gas reported | Eagleridge Operating, LLC | |||
| JuneJun 2025 | No oil or gas reported | Eagleridge Operating, LLC | |||
| MayMay 2025 | No oil or gas reported | Eagleridge Operating, LLC | |||
| AprilApr 2025 | No oil or gas reported | Eagleridge Operating, LLC | |||
| MarchMar 2025 | No oil or gas reported | Eagleridge Operating, LLC | |||
SourcesTexas Railroad Commission Production Data Query, through August 2026. Prices: EIA.
Example
A whole month was never paid
The State shows 28,175 barrels of oil sold from the lease in the month its operator changed from Operator A to Operator B, so the owner's share is 27.51 barrels. No statement covers that month.
Ask Operator B's owner relations: is that month held in suspense after the change of operator?
$2,277oil and gas
A sample finding, from our example check.
Around this lease
Nearby
Eagleridge Operating, LLC in Hood County
- Henson Unit14,817 mcf last 12 months
- Hoover Unit13,818 mcf last 12 months
- Putteet, C. R. Unit11,014 mcf last 12 months
- Putteet Hill Unit9,624 mcf last 12 months
- Behrens "A" Unit14,199 mcf last 12 months
- Hoover Unit12,710 mcf last 12 months
- Trapper John13,389 mcf last 12 months
- Mary Ann Unit11,396 mcf last 12 months
- Vette12,931 mcf last 12 months
- Mooney Unit "B"12,409 mcf last 12 months
Newark, East (Barnett Shale) field
- Dangelmayr A10,502 mcf last 12 months
- Burton14,071 mcf last 12 months
- Tubbs Unit14,063 mcf last 12 months
- Dangelmayr A11,447 mcf last 12 months
- Adams, Corinne14,038 mcf last 12 months
- Waggoner, Crystelle Gas Unit14,023 mcf last 12 months
- Yeandle-Martin 6 (Sa)14,016 mcf last 12 months
- McClendon Farms "A"13,295 mcf last 12 months
- Indian Creek13,990 mcf last 12 months
- Albritton, A. P. Gas Unit12,099 mcf last 12 months
Leases within 10 km
- Comanche Peakno production in the last 12 months · 0.3 km
- Noelno production in the last 12 months · 0.7 km
- Noelno production in the last 12 months · 0.7 km
- Noelno production in the last 12 months · 0.7 km
- Comanche Peak13,571 mcf last 12 months · 0.7 km
- Triad-Cooperno production in the last 12 months · 0.8 km
- Triad-Cooperno production in the last 12 months · 0.8 km
- Comanche Peak31,980 mcf last 12 months · 0.9 km
- Comanche Peak79,610 mcf last 12 months · 1 km
- Comanche Peak32,152 mcf last 12 months · 1 km
Same name in district 09
- Comanche Peak79,610 mcf last 12 months
- Comanche Peak51,739 mcf last 12 months
- Comanche Peak32,152 mcf last 12 months
- Comanche Peak32,855 mcf last 12 months
- Comanche Peak31,980 mcf last 12 months
- Comanche Peak13,571 mcf last 12 months
- Comanche Peakno production in the last 12 months
Where it sits
This county
Where this page comes from
- Railroad Commission of Texas production, Form P-4, permits, wells
- Texas Comptroller tax approvals, lease values
- U.S. Energy Information Administration prices
- NOAA storms and cold
- NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data) night heat
- Hood County Appraisal District mineral roll
- U.S. Geological Survey photos
How this page is made
Our software builds this page from the public records above. Every figure on it is computed from them, and the page is rebuilt when a source publishes a new month or a new roll. Where the page has a written summary, our software writes it from the page's own figures, and it is checked against them before it goes up. Royalty Clerk is run by AGI Solutions LLC; no operator pays for a page or sees one first.