Skip to content
A-587 · PANOLA CSL1A-587PANOLA CSLDANIEL · 181 ACRESN500 m33.4649° N 97.7666° W · PHOTO: U.S. GEOLOGICAL SURVEY

Texas gas wellRRC 09-253471Last oil or gas reported Feb 2015

Daniel

No oil or gas reported in the last 12 months, through August 2026. Reports are on file for all 12 months, with no oil and no gas.

Is your family on this lease?

Email me when this lease changesI own here

1 location is linked by a filed completion. The primary well record can name a different lease.

County
Montague
On record since
November 2009
Newest report on file
August 2026
Unit on the newest permit
181 acres

Outline: the original land surveys this lease's wells sit in. The State publishes no lease outlines. RRC surveys, 2026-09-29.

Eight things the public record says about this lease. Each one sets two records side by side, and one that finds nothing still shows and says so. Photo: U.S. Geological Survey.

No oil or gas reported in the 12 months through August 2026

Oil or gas was last reported for February 2015

Its whole life in the Railroad Commission's monthly reports, which start in January 1993; it first reported in November 2009. Royalty owners and their heirs can still be on the county roll after the checks stop.

  1. November 2009First report
  2. 2011The year it sold the most
  3. General Operating CompanyLast operator, from January 2020
  4. February 2015Last production
  5. 138 monthsNo oil or gas reported, March 2015 to August 2026
2,308

thousand cubic feet of gas sold since November 2009.

$8,580

what it all sold for at each month's public prices, 100% of the lease.

SourceRailroad Commission production reports since January 1993 (oil and gas sold); EIA prices, through August 2026.

The story, from 202 monthly reports

On record since November 2009

Gas reported each month (sales where filed, otherwise production) since November 2009The numbers match the paragraphs below
201220142016201820202022202420261Nov 20092August 2026Nov 2009 onward

November 2009: the first month the lease sold gas on record, 51 thousand cubic feet.

August 2026 is the newest monthly production report on file.

SourceRailroad Commission production reports, November 2009 through August 2026. Not a forecast, not reserves.

202 months against 7 other recordsNew

Every month since November 2009, and what else happened that month

The lease is the line on top. Under it, on the same clock: the weather, the State, the price, the wells next door, who ran the lease, who bought from it and the rest of the field. Move across it.

Aug 2026
Nothing reported this month
Gas averaged $2.78 an mcf · General Operating Company
  • Nothing else on record this month.
SINCENOV 2009201020152020202500111MCF A MONTHLAST 12 MONTHSWEATHERTHE STATEGAS PRICENEXT DOOROPERATORBUYERSTHE FIELDGeneral Operating Company2017201820192020202120222023202420252026

Move the pointer or drag across the chart.

Monthly gas sold from this lease since November 2009, with seven record tracks beneath it. Use the left and right arrow keys to move month by month.. 202 months from November 2009 to August 2026. The most in one month: 120 mcf, September 2012. The newest month: 0 mcf. 155 months with nothing reported.

No numbered drop comparison is on file here.

SourcesProduction, cut-offs, operators and buyers: Railroad Commission of Texas. Weather: NOAA. Prices: U.S. Energy Information Administration. Fracs: FracFocus. A record in the same month is not proof of a cause. Through August 2026.

Royalty Watch tells you the month a drop starts, with the records from that month.Watch this lease

202 months, one line eachNew

No production was reported from March 2015 through August 2026

A gap is a month with no oil and no gas reported. Many leases end after 60 to 90 days without production unless the lease says otherwise.

138

months in a row with nothing reported, from March 2015 through August 2026. Reports are on file for all 138 months, with no oil and no gas.

98

thousand cubic feet of gas on the newest report on file with oil or gas, for February 2015. The 138 reports on file after it, the newest for August 2026, show no oil and no gas.

47

of 202 months with oil or gas reported since November 2009.

November 2009Taller line, more gas soldAugust 2026
201020122014201620182020202220242026ENLARGED BELOW

A shut-in payment or work on the wells can keep a lease alive through a gap. Your own lease paper decides.

SourceRailroad Commission production reports, November 2009 through August 2026. The months after May 2026 are counted from this lease's own reports filed since.

Royalty Watch tells you when a silent month starts, and drafts the letter asking whether the lease is still in force.Watch this lease

18 years of state records, 2009 to 2026

Sold since November 2009

$8,580

Only filed sales with a published price are included. Some sales figures or prices are unavailable.

Gas sold
2,308thousand cubic feet
Sold each year, at that month's pricesOilGas
What the oil and gas from this lease sold for each year, 2009 to 2026, at each month's public prices.
YearOil, dollarsGas, dollarsTotal
2009$0$492$492
2010$0$2,560$2,560
2011$0$2,750$2,750
2012$0$1,560$1,560
2013$0$941 in priced filings$941 in priced filings
2014$0UnavailableUnavailable
2015$0$281 in priced filings$281 in priced filings
2016$0UnavailableUnavailable
2017$0UnavailableUnavailable
2018$0UnavailableUnavailable
2019$0UnavailableUnavailable
2020$0$0$0
2021$0$0$0
2022$0$0$0
2023$0$0$0
2024$0$0$0
2025$0$0$0
2026, 2026 so far$0$0$0

Did a relative own a share of this lease?

The bars show every year. Pick one to add up what the lease has sold since.

SourcesRailroad Commission Production Data Query, every monthly report since November 2009. EIA monthly WTI and Henry Hub prices. 2026 is part of a year, drawn lighter. Not a forecast, not reserves.

The newest well, seen from the side

No well on the way.

No dated well completion is on file for this lease.

  1. Permit filedNot on file
  2. Drilling startedNot on file
  3. FrackedNot on file
  4. Completion filedNot on file
  5. First production on the leaseNot on file
  6. First checkNot on file

SourcesRailroad Commission drilling permits and well records, and the FracFocus registry. Lease record built November 17, 2026.

Royalty Watch follows new well permits and completions on this lease.Watch this lease

About 6 miles across

Wells on this lease and around it

1this lease, ringed
20producing
0fracked and waiting
0permits, last 24 months
6plugged
23original land surveys

For a lawyer, a buyer or a probate file. Wells and permits within about 2 miles. Railroad Commission of Texas, FracFocus and USGS imagery.

Use this map on your site

You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.

Download the picture (WebP)
<a href="https://royaltyclerk.com/texas/leases/daniel-09-253471-g"><img src="https://royaltyclerk.com/maps/lease-wells/daniel-09-253471-g.svg" alt="Map of the Daniel lease in Montague County, Texas: its well ringed, among 42 wells and 0 recent drilling locations in a picture about 6 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/leases/daniel-09-253471-g">Wells on the Daniel lease, Montague County, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>

From the State's well records

Wells on this lease

No wells are linked to this lease in the State’s well records. Production is still reported at lease level.

SourceRailroad Commission wellbore and completion records.

Other leases on these wells

The Railroad Commission files the same API numbers under one more lease too: a well keeps its number when it moves into a unit or is recompleted under another lease. A deed older than the unit may name one of them.

Daniel (Montague County, 1 shared well)

What the drilling permits say

181acres on the newest permit

181 ACRES
  • 181 acres, on the 1981 permits
Check your decimal on this lease

Gas · last sale month, February 2015 New

Four prices for the same gas

Last sale February 2015. Henry Hub $2.87 in February 2015, the last sale month.

$2.87
The marketEIA Henry Hub, February 2015, the last sale month
not on file
Told its investorsNo comparable investor filing on file.
not on file yet
Told the tax officeTexas Comptroller, this lease
?
Your statementOnly you hold this one.

Texas Comptroller

Lower tax on record?

No lower tax approval appears on the Comptroller’s list for this lease.

EIA record dated October 1, 2026

Estimate your royalty

Type the decimal from your division order

The starting decimal is an example. Nothing you type here leaves this page.

$0a month

At these prices the whole lease’s reported sales were about $0 over 12 reported months. Your estimated share is $0 before taxes and deductions.

Monthly owner volumes and values
Estimated share before tax and deductions
MonthOil (bbl)Oil valueGas (mcf)Gas valueTotal
August 20260$0.000$0.00$0.00
July 20260$0.000$0.00$0.00
June 20260$0.000$0.00$0.00
May 20260$0.000$0.00$0.00
April 20260$0.000$0.00$0.00
March 20260$0.000$0.00$0.00
February 20260$0.000$0.00$0.00
January 20260$0.000$0.00$0.00
December 20250$0.000$0.00$0.00
November 20250$0.000$0.00$0.00
October 20250$0.000$0.00$0.00
September 20250$0.000$0.00$0.00

SourcesRailroad Commission monthly production, EIA Henry Hub, SEC filings and Texas Comptroller records.

Watch Plus sets public prices beside the price on your statement.See Watch Plus

Who takes the oil and gasNew

No buyer shares an owner with the operator

The State lists who gathers and who buys from each lease. Company filings list who owns whom. Here they are on one drawing.

GAS
Runs the leaseGeneral Operating Companysince November 2009
Gathers and buys 100%DAVIS GAS PROCESSING, INC.since November 2009

No shared owner, officer or address on record between the gas buyers and the operator.

OIL
Runs the leaseGeneral Operating Companysince November 2009
Gathers 100%PLAINS MARKETING, L.P.since November 2009

No shared owner, officer or address on record between the oil buyers and the operator.

SourcesBuyers and gatherers: Railroad Commission Form P-4 records, as of October 24, 2026. Ownership: U.S. Securities and Exchange Commission filings.

Royalty Watch tells you the day the buyer of your oil or gas changes.Watch this lease

Seen from space

Heat at the pad, beside reported gas use

A-587 · PANOLA CSLONE SATELLITE PIXEL, ABOUT 375 M
DAYNIGHT

Satellite match

Not matched

No matched satellite record is on file for this pad.

—

nights of heat

0

months reporting flared or vented gas among 12 filed months, September 2025 to August 2026

—

months with heat and none reported

SourcesNOAA VIIRS night readings and Railroad Commission gas disposition reports. Satellite record through November 16, 2026.

Watch Plus checks statement months beside the satellite record.See Watch Plus

The county appraisal roll

No public roll figures

County mineral roll

No public roll figures

There are no publishable figures for this lease from the 2026 county mineral roll.

Royalty Clerk has mineral rolls for 146 Texas counties.

Source County appraisal district mineral rolls.

From the state record

Ask a question about Daniel

The available public records have no additional lease-specific answers as of November 20, 2026.

Every monthly report the State holds

202 months, newest first

Ledger for Daniel
MonthGas soldthousand cubic feetFlared or ventedthousand cubic feetSold forat public prices
AugustAug 2026No oil or gas reported
JulyJul 2026No oil or gas reported
JuneJun 2026No oil or gas reported
MayMay 2026No oil or gas reported
AprilApr 2026No oil or gas reported
MarchMar 2026No oil or gas reported
FebruaryFeb 2026No oil or gas reported
JanuaryJan 2026No oil or gas reported
DecemberDec 2025No oil or gas reported
NovemberNov 2025No oil or gas reported
OctoberOct 2025No oil or gas reported
SeptemberSep 2025No oil or gas reported
AugustAug 2025No oil or gas reported
JulyJul 2025No oil or gas reported
JuneJun 2025No oil or gas reported
MayMay 2025No oil or gas reported
AprilApr 2025No oil or gas reported
MarchMar 2025No oil or gas reported

SourcesTexas Railroad Commission Production Data Query, through August 2026. Prices: EIA.

Do your checks match this lease?

Check my statement

Likely owed Jan 2025

A whole month was never paid

The state shows 28,175 bbl of oil sold from this lease in January 2025, so your share is 27.51 bbl. No statement covers January 2025. That is the month the operator changed from Endeavor Energy Resources to Diamondback.

Ask Diamondback owner relations: is January 2025 being held in suspense after the change of operator?

$2,277oil + gas

A sample finding, from our example check. The full example found $3,328 likely owed.

Around this lease

Nearby

Sunset (Conglomerate) field

All leases in this field

New drilling permits in Montague County

  • SALMON D & E #33Dnew drill · V & H Oil, L.P. · Sept 2, 2026
  • SALMON D & E #54Enew drill · V & H Oil, L.P. · Aug 31, 2026
  • SALMON D & E #53Enew drill · V & H Oil, L.P. · Aug 31, 2026
  • HARDY #1new drill · Texxol Operating Company, Inc. · Aug 21, 2026
  • STORY #2new drill · Kodiak Oil & Gas, Inc. · Aug 29, 2025

Same name in district 09

  • Daniel673 bbl last 12 months
  • Daniel592 bbl last 12 months
  • Danielno production in the last 12 months

Where it sits

This county

Montague CountyMontagueClayCookeMontague County
Montague County

Where this page comes from

  • Railroad Commission of Texas production, Form P-4, permits, wells
  • U.S. Energy Information Administration prices
  • NOAA storms and cold
  • U.S. Geological Survey photos