Skip to content
A-757 · WALKER, Z C1HA-757WALKER, Z CDAVIS · 855 ACRESN1 mile31.7563° N 94.1567° W · PHOTO: U.S. GEOLOGICAL SURVEY

Texas gas wellRRC 06-258149

Davis

One well on 855 acres in Shelby County. The lease produced 10,422 thousand cubic feet of gas in its last 12 months on record, through July 2026. No report after July 2026 is on file; the State's newest month is August 2026.

Is your family on this lease?

Email me when this lease changesI own here

County
Shelby
On record since
January 2011
Newest report on file
July 2026
Unit on the newest permit
855 acres

Outline: the original land surveys this lease's wells sit in. The State publishes no lease outlines. RRC surveys, 2026-09-29.

Eight things the public record says about this lease. Each one sets two records side by side, and one that finds nothing still shows and says so. Photo: U.S. Geological Survey.

The story, from 187 monthly reports

On record since January 2011

Gas reported each month (sales where filed, otherwise production) since January 2011The numbers match the paragraphs below
201220142016201820202022202420261Jan 20112Jan 20153Oct 20174Jun 20195Jan 20266July 2026Jan 2011 onward

January 2011: the first month the lease sold gas on record, 48,454 thousand cubic feet.

January 2015: SND Operating, L.L.C. took over from Chesapeake Operating, L.L.C..

October 2017: Weatherly Oil & Gas, LLC took over from SND Operating, L.L.C..

June 2019: Shelby Boswell Operator, LLC took over from Weatherly Oil & Gas, LLC.

January 2026: Rockcliff Energy Operating III took over from Shelby Boswell Operator, LLC.

July 2026 is the newest monthly production report on file.

SourceRailroad Commission production reports, January 2011 through August 2026. Not a forecast, not reserves.

Checks stopped on this lease?

Operator

Operator changed: Rockcliff Energy Operating III took over from Shelby Boswell Operator, LLC in Jan 2026.

Buyer

Buyer changed: ENTERPRISE PRODUCTS OPERATING LLC replaced SHELBY BOSWELL OPERATOR, LLC as the buyer of this lease's gas from gas wells on Jan 22, 2026.

SourceRailroad Commission production, P-5 and P-4 records, data through August 2026.See why checks stop on this lease

188 months against 7 other recordsNew

Every month since January 2011, and what else happened that month

The lease is the line on top. Under it, on the same clock: the weather, the State, the price, the wells next door, who ran the lease, who bought from it and the rest of the field. Move across it.

Dec 2023
801 mcf · down 42.3% on the three months before
Gas averaged $2.52 an mcf · Shelby Boswell Operator, LLC
  • Nothing else on record this month.
SINCEJAN 20112012201420162018202020222024202602,0004,0006,0008,000MCF A MONTHLAST 12 MONTHS12WEATHERTHE STATEGAS PRICENEXT DOOROPERATORBUYERSTHE FIELDSNDWeatherlyShelby Boswell Operator, LLC2017201820192020202120222023202420252026
Two drops

Move the pointer or drag across the chart. The numbered buttons jump to each drop.

Monthly gas sold from this lease since January 2011, with seven record tracks beneath it. Use the left and right arrow keys to move month by month.. 188 months from January 2011 to August 2026. The most in one month: 131,928 mcf, February 2011. The newest month: 0 mcf. 3 months with nothing reported. Moments marked: 1, May 2020; 2, Dec 2023.

SourcesProduction, cut-offs, operators and buyers: Railroad Commission of Texas. Weather: NOAA. Prices: U.S. Energy Information Administration. Fracs: FracFocus. A record in the same month is not proof of a cause. Through August 2026. The newest report on file for this lease is for July 2026; no report after it is on file.

Royalty Watch tells you the month a drop starts, with the records from that month.Watch this lease

185 months, one line eachNew

No consecutive silent months since January 2011

A gap is a month with no oil and no gas reported. Many leases end after 60 to 90 days without production unless the lease says otherwise.

0

runs of two or more months with nothing reported, since January 2011.

867

thousand cubic feet of gas on the newest report on file with oil or gas, for July 2026. No report after July 2026 is on file; the State's newest month is August 2026.

183

of 185 months with oil or gas reported since January 2011.

25.2

thousand cubic feet of gas a day on average from September 2025 through August 2026, counting a month with no report on file as zero.

January 2011Taller line, more gas soldMay 2026
20122014201620182020202220242026

A shut-in payment or work on the wells can keep a lease alive through a gap. Your own lease paper decides.

SourceRailroad Commission production reports, January 2011 through May 2026. The newest months, after May 2026, are left out of the count because reports arrive late.

Royalty Watch tells you when a silent month starts, and drafts the letter asking whether the lease is still in force.Watch this lease

16 years of state records, 2011 to 2026

Sold since January 2011

$5.03million

Only filed sales with a published price are included. Some sales figures or prices are unavailable.

Gas sold
1,396,702thousand cubic feet
Sold each year, at that month's pricesOilGas
What the oil and gas from this lease sold for each year, 2011 to 2026, at each month's public prices.
YearOil, dollarsGas, dollarsTotal
2011$0$2.61 million$2.61 million
2012$0$487,000 in priced filings$487,000 in priced filings
2013$0$442,000$442,000
2014$0$373,000$373,000
2015$0$169,000$169,000
2016$0$138,000$138,000
2017$0$137,000 in priced filings$137,000 in priced filings
2018$0$168,000$168,000
2019$0$86,600$86,600
2020$0$56,000$56,000
2021$0$90,000$90,000
2022$0$133,000$133,000
2023$0$41,800$41,800
2024$0$35,300$35,300
2025$0$42,900$42,900
2026, 2026 so far$0$21,200$21,200

Did a relative own a share of this lease?

The bars show every year. Pick one to add up what the lease has sold since.

SourcesRailroad Commission Production Data Query, every monthly report since January 2011. EIA monthly WTI and Henry Hub prices. 2026 is part of a year, drawn lighter. Not a forecast, not reserves.

Who has run this lease

The operator changed five times, most recently in January 2026

The company named on each monthly report to the State. The operator is not always the company that pays.

  1. Rockcliff Energy Operating IIIJanuary 2026 to now
  2. Shelby Boswell Operator, LLCJune 2019 to December 2025
  3. Weatherly Oil & Gas, LLCOctober 2017 to May 2019
  4. SND Operating, L.L.C.January 2015 to September 2017
  5. Chesapeake Operating, L.L.C.November 2014 to December 2014
  6. Operator number 147715January 2011 to October 2014

SourcesRailroad Commission production reports, the operator on each month’s report, January 2011 through August 2026.

The newest well, seen from the side

No well on the way. Well 1H was completed in June 2010.

ground2,000 ft4,000 ft6,000 ft8,000 ft10,000 ft1H11,787 ft deep4,411 ft sideways
  1. Permit filedNot on file
  2. Drilling startedNot on file
  3. FrackedNot on file
  4. Completion filedJune 12, 2010
  5. First production on the leaseNot on file
  6. First checkNot on file

SourcesRailroad Commission drilling permits and well records, and the FracFocus registry. Lease record built November 17, 2026.

Royalty Watch follows new well permits and completions on this lease.Watch this lease

About 6 miles across

Wells on this lease and around it

1this lease, ringed
14producing
0fracked and waiting
0permits, last 24 months
0plugged
25original land surveys

For a lawyer, a buyer or a probate file. Wells and permits within about 2 miles. Railroad Commission of Texas, FracFocus and USGS imagery.

Use this map on your site

You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.

Download the picture (WebP)
<a href="https://royaltyclerk.com/texas/leases/davis-06-258149-g"><img src="https://royaltyclerk.com/maps/lease-wells/davis-06-258149-g.svg" alt="Map of the Davis lease in Shelby County, Texas: its well ringed, among 17 wells and 0 recent drilling locations in a picture about 6 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/leases/davis-06-258149-g">Wells on the Davis lease, Shelby County, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>

From the State's well records

One well on this lease

Wells on Davis
WellAPI numberCompletedSidewaysfeetDepthfeetToday
1H42-419-31576June 20104,41111,787Active

SourceRailroad Commission wellbore and completion records.

What the drilling permits say

855acres on the newest permit

855 ACRES
  • 855 acres, on the 2010 permits
Check your decimal on this lease

Gas, August 2026, dollars per thousand cubic feet New

Four prices for the same gas

What the market paid, what the operator told its investors, what it told the tax office for this lease, and the one only you hold.

$2.78
The marketHenry Hub, August 2026
none on file
Told its investorsno public parent's filing on record
not on file yet
Told the tax officeTexas Comptroller, this lease
?
Your statementonly you hold this one
On recordA lower tax is on record

The State approved a lower tax for this lease

Kind
Low Producing Wells
Wells
The whole lease
Runs
July 2020 to no end date on file
Rate
Not given in the file

Look at the tax line on your statement for this lease. The record says which rate applies.

Estimate your royalty

Type the decimal from your division order

The starting decimal is an example. Nothing you type here leaves this page.

$12a month

At these prices the whole lease’s reported sales were about $37,200 over 12 reported months. Your estimated share is $145 before taxes and deductions.

Monthly owner volumes and values
Estimated share before tax and deductions
MonthOil (bbl)Oil valueGas (mcf)Gas valueTotal
July 20260$0.003.3867$9.79$9.79
June 20260$0.003.5391$11.15$11.15
May 20260$0.003.0508$8.97$8.97
April 20260$0.003.082$8.54$8.54
March 20260$0.002.7383$8.32$8.32
February 20260$0.002.7891$10.10$10.10
January 20260$0.003.3516$25.87$25.87
December 20250$0.002.5313$10.78$10.78
November 20250$0.003.5078$13.29$13.29
October 20250$0.003.5195$11.23$11.23
September 20250$0.004.4023$13.07$13.07
August 20250$0.004.8125$14.00$14.00

SourcesMarket: U.S. Energy Information Administration (Henry Hub for gas, taken per thousand cubic feet). Investors: no public parent's filing is on record for the operator. Tax office and tax approval: Texas Comptroller. The third price shows once the Comptroller's records for this lease have arrived. As of October 1, 2026.

Watch Plus sets these prices beside the price on each of your statements, every month.See Watch Plus

Who takes the oil and gasNew

No buyer shares an owner with the operator

The State lists who gathers and who buys from each lease. Company filings list who owns whom. Here they are on one drawing.

GAS
Runs the leaseRockcliff Energy Operating IIIsince January 2026
Gathers and buys 100%ENTERPRISE PRODUCTS OPERATING LLCsince January 2026

No shared owner, officer or address on record between the gas buyers and the operator.

Earlier buyers and gatherers, back to 1993
Earlier companies named on the Form P-4
CompanyProductRoleFromUntil
SHELBY BOSWELL OPERATOR, LLCGasBuysJun 2019Jan 2026
WEATHERLY OIL & GAS, LLCGasBuysOct 2017Jun 2019

SourcesBuyers and gatherers: Railroad Commission Form P-4 records, as of October 24, 2026. Ownership: U.S. Securities and Exchange Commission filings.

Royalty Watch tells you the day the buyer of your oil or gas changes.Watch this lease

Seen from space, 2025New

No satellite heat at this pad in 2025

Weather satellites pass over Texas every night and record heat on the ground. Drag the photo from day to night. Beside it, each night of 2025 next to what the operator reported burning.

A-757 · WALKER, Z CONE SATELLITE PIXEL, ABOUT 375 M
DAYNIGHT, 2025
Each dot is a nightFlaring reported
JAN0none
FEB0none
MAR0none
APR0none
MAY0none
JUN0none
JUL0none
AUG0none
SEP0none
OCT0none
NOV0none
DEC0none

A lit dot is a night a satellite recorded heat within 500 m of a well on this lease. The red bar is gas reported vented or flared that month.

0

nights with heat recorded at this pad, 2025.

0

months in which flaring was reported.

0

months with heat seen and no flaring reported.

Where the gas went in 2025, as the operator reported it

100%Sold12,286 thousand cubic feet

SourcesHeat: NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data); the readings at this pad from NOAA-20, NOAA-21 and Suomi NPP, through November 16, 2026. Reported flaring and gas use: Railroad Commission production reports. Cloud hides heat, so the count of nights is a floor. The satellite records heat. It does not say what burned.

Watch Plus checks whether you were paid on gas in the months heat was seen.See Watch Plus

Where the gas went, month by month

All of the gas went to a transmission line in the last 12 months

Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.

All of the gas went to a transmission line in the last 12 monthsShare of Davis gas by disposition code each month, September 2023 to July 2026. All of the gas went to a transmission line in the last 12 months.Share of the lease’s gas by disposition code, per month0%50%100%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
All of the gas went to a transmission line in the last 12 monthsShare of Davis gas by disposition code each month, September 2023 to July 2026. All of the gas went to a transmission line in the last 12 months.Share of gas by disposition code0%50%100%Jan 24JulJan 25JulJan 26Jul

SourcesRailroad Commission production reports, gas disposition by code, September 2023 to July 2026.

The county appraisal roll

No public roll figures

County mineral roll

No public roll figures

There are no publishable figures for this lease from the 2026 county mineral roll.

Royalty Clerk has mineral rolls for 146 Texas counties.

Source County appraisal district mineral rolls.

From the state record

What owners ask about Davis

01When is the check for July 2026 due?
July 2026 is the newest month the state has posted for this lease. Texas law gives the payor until 60 days after the end of the sale month for oil and 90 for gas: the gas by Oct 29, 2026, unless the lease sets another time.
Source: Railroad Commission production reports; Texas Natural Resources Code §91.402.
See your next three checks
02Which Texas production tax rate applies?
The Texas Comptroller lists low producing wells for this lease, from Jul 1, 2020. Its file does not give the rate, so we compare your stub with the full 7.5%. That is for July 2026.
Source: Texas Comptroller, approved severance tax exemptions.
Check the tax on your stub
03Who buys the oil and gas?
GASEnterprise Products Operating LLC100%
Gas from gas wells: Enterprise Products Operating LLC buys and gathers it. The buyer's price is what a royalty check is figured on.
Source: Railroad Commission Form P-4, gatherers and purchasers.
See every buyer and past buyers
04How many 1099s should an owner expect for 2025?
1January to December 2025: one operator of record in all 12 months
One company, Shelby Boswell Operator, LLC, filed this lease's reports behind every 2025 check, so most owners get one form. The operator is not always the company that pays, so go by the name on the stubs.
Source: Railroad Commission production reports, operator of record by month.
Check your 1099 against it

Every monthly report the State holds

188 months, newest first

Ledger for Davis
MonthGas soldthousand cubic feetFlared or ventedthousand cubic feetSold forat public pricesOperator
AugustAug 2026No report on file–
JulyJul 20268670$2,510Rockcliff Energy Operating III
JuneJun 20269060$2,850Rockcliff Energy Operating III
MayMay 20267810$2,300Rockcliff Energy Operating III
AprilApr 20267890$2,190Rockcliff Energy Operating III
MarchMar 20267010$2,130Rockcliff Energy Operating III
FebruaryFeb 20267140$2,580Rockcliff Energy Operating III
JanuaryJan 20268580$6,620Rockcliff Energy Operating III
DecemberDec 20256480$2,760Shelby Boswell Operator, LLC
NovemberNov 20258980$3,400Shelby Boswell Operator, LLC
OctoberOct 20259010$2,870Shelby Boswell Operator, LLC
SeptemberSep 20251,1270$3,350Shelby Boswell Operator, LLC
AugustAug 20251,2320$3,590Shelby Boswell Operator, LLC
JulyJul 20251,2110$3,880Shelby Boswell Operator, LLC
JuneJun 20258270$2,500Shelby Boswell Operator, LLC
MayMay 20251,1100$3,460Shelby Boswell Operator, LLC
AprilApr 20251,2510$4,280Shelby Boswell Operator, LLC
MarchMar 20251,0800$4,450Shelby Boswell Operator, LLC

SourcesTexas Railroad Commission Production Data Query, through August 2026. Prices: EIA.

Do your checks match this lease?

Check my statement

Likely owed Jan 2025

A whole month was never paid

The state shows 28,175 bbl of oil sold from this lease in January 2025, so your share is 27.51 bbl. No statement covers January 2025. That is the month the operator changed from Endeavor Energy Resources to Diamondback.

Ask Diamondback owner relations: is January 2025 being held in suspense after the change of operator?

$2,277oil + gas

A sample finding, from our example check. The full example found $3,328 likely owed.

Around this lease

Nearby

Rockcliff Energy Operating III in Shelby County

All Rockcliff Energy Operating III leases

Carthage (Haynesville Shale) field

All leases in this field

Leases within 10 km

  • Nobles5,844 mcf last 12 months · 0.9 km
  • Pilot24,915 mcf last 12 months · 1.9 km
  • Samford31,494 mcf last 12 months · 1.9 km
  • Peace21,007 mcf last 12 months · 2.7 km
  • Hawkeyeno production in the last 12 months · 2.8 km
  • Lamkin45 mcf last 12 months · 2.8 km
  • Gilbert Wheeler Gas Unit21,045 mcf last 12 months · 3 km
  • Jarry31,568 mcf last 12 months · 3.1 km
  • Duke11,906 mcf last 12 months · 3.5 km
  • Lamkin19,452 mcf last 12 months · 3.7 km

Drilling permits within 10 km

  • BULLITT C #6Hnew drill · horizontal · Silver Hill Energy Operating LLC · Sept 29, 2026 · 5.5 km
  • BULLITT C #5Hnew drill · horizontal · Silver Hill Energy Operating LLC · Sept 15, 2026 · 5.5 km
  • BULLITT B #4Hnew drill · horizontal · Silver Hill Energy Operating LLC · Sept 11, 2026 · 5.5 km
  • BULLITT A #1Hnew drill · horizontal · Silver Hill Energy Operating LLC · Sept 11, 2026 · 5.5 km
  • BULLITT A #2Hnew drill · horizontal · Silver Hill Energy Operating LLC · Sept 11, 2026 · 5.5 km

Same name in district 06

  • Davis95,502 bbl last 12 months
  • Davis2,524 bbl last 12 months
  • Davis17,235 mcf last 12 months
  • Davis16,206 mcf last 12 months
  • Davis3,012 mcf last 12 months
  • Davisno production in the last 12 months
  • Davisno production in the last 12 months
  • Davisno production in the last 12 months
  • Davisno production in the last 12 months
  • Davisno production in the last 12 months
  • Davisno production in the last 12 months

Where it sits

This county

Shelby CountyShelbyPanolaSan AugustineNacogdochesSabineRuskShelby County
Shelby County

Where this page comes from

  • Railroad Commission of Texas production, Form P-4, permits, wells
  • Texas Comptroller tax approvals, lease values
  • U.S. Energy Information Administration prices
  • NOAA storms and cold
  • NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data) night heat
  • U.S. Geological Survey photos