Skip to content
A-790 · RODRIGUEZ, J J18A-790RODRIGUEZ, J JDAVIS, A.E. · 3,560 ACRESN500 m31.5656° N 99.0736° W · PHOTO: U.S. GEOLOGICAL SURVEY

Texas gas wellRRC 7B-119330Last oil or gas reported Dec 2022

Davis, A.e.

One well on 3,560 acres in Brown County. The lease produced 329 thousand cubic feet of gas in its last 12 months on record, through December 2022. No report after December 2022 is on file; the State's newest month is August 2026.

Is your family on this lease?

Email me when this lease changesI own here

County
Brown
On record since
August 1998
Newest report on file
December 2022
Unit on the newest permit
3,560 acres

Outline: the original land surveys this lease's wells sit in. The State publishes no lease outlines. RRC surveys, 2026-09-29.

Eight things the public record says about this lease. Each one sets two records side by side, and one that finds nothing still shows and says so. Photo: U.S. Geological Survey.

No oil or gas reported in the 12 months through August 2026

Oil or gas was last reported for December 2022

Its whole life in the Railroad Commission's monthly reports, which start in January 1993; it was already producing then. Royalty owners and their heirs can still be on the county roll after the checks stop.

  1. 1993Already producing when the records start
  2. 2007The year it sold the most
  3. Subsurface Production, Inc.Last operator, from January 2020
  4. December 2022Last production
  5. 41 monthsNo oil or gas reported, January 2023 to May 2026
5,412

thousand cubic feet of gas sold since 1993.

$27,200

what it all sold for at each month's public prices, 100% of the lease.

SourceRailroad Commission production reports since January 1993 (oil and gas sold); EIA prices, through August 2026.

The story, from 292 monthly reports

On record since August 1998

Gas reported each month (sales where filed, otherwise production) since August 1998The numbers match the paragraphs below
200020052010201520201Aug 19982Dec 20113December 2022Aug 1998 onward

August 1998: the first month the lease sold gas on record, 3 thousand cubic feet.

December 2011: Subsurface Production, Inc. took over.

December 2022 is the newest monthly production report on file.

SourceRailroad Commission production reports, August 1998 through December 2022. Not a forecast, not reserves.

Checks stopped on this lease?

P-5

The current operator's P-5 registration is listed as delinquent (last P-5 filed Oct 14, 2019).

SourceRailroad Commission production, P-5 and P-4 records, data through August 2026.See why checks stop on this lease

293 months against 7 other recordsNew

Every month since August 1998, and what else happened that month

The lease is the line on top. Under it, on the same clock: the weather, the State, the price, the wells next door, who ran the lease, who bought from it and the rest of the field. Move across it.

Dec 2022
32 mcf · level with the three months before
Gas averaged $5.53 an mcf · Subsurface Production, Inc.
  • Nothing else on record this month.
SINCEAUG 199820002005201020152020010203040MCF A MONTHLAST 12 MONTHSWEATHERTHE STATEGAS PRICENEXT DOOROPERATORBUYERSTHE FIELDSubsurface Production, Inc.2013201420152016201720182019202020212022

Move the pointer or drag across the chart.

Monthly gas sold from this lease since August 1998, with seven record tracks beneath it. Use the left and right arrow keys to move month by month.. 293 months from August 1998 to December 2022. The most in one month: 80 mcf, March 2005. The newest month: 32 mcf. 22 months with nothing reported.

No numbered drop comparison is on file here.

SourcesProduction, cut-offs, operators and buyers: Railroad Commission of Texas. Weather: NOAA. Prices: U.S. Energy Information Administration. Fracs: FracFocus. A record in the same month is not proof of a cause. Through December 2022.

Royalty Watch tells you the month a drop starts, with the records from that month.Watch this lease

334 months, one line eachNew

No production was reported from January 2023 through May 2026

A gap is a month with no oil and no gas reported. Many leases end after 60 to 90 days without production unless the lease says otherwise.

41

months in a row with nothing reported, from January 2023 through May 2026. No report is on file for any of the 41 months.

32

thousand cubic feet of gas on the newest report on file with oil or gas, for December 2022. No report after December 2022 is on file; the State's newest month is August 2026.

282

of 334 months with oil or gas reported since August 1998.

August 1998Taller line, more gas soldMay 2026
200020052010201520202025ENLARGED BELOW

A shut-in payment or work on the wells can keep a lease alive through a gap. Your own lease paper decides.

SourceRailroad Commission production reports, August 1998 through May 2026. The newest months, after May 2026, are left out of the count because reports arrive late.

Royalty Watch tells you when a silent month starts, and drafts the letter asking whether the lease is still in force.Watch this lease

25 years of state records, 1998 to 2022

Sold since August 1998

$27,200

Only filed sales with a published price are included. Some sales figures or prices are unavailable.

Gas sold
5,412thousand cubic feet
Sold each year, at that month's pricesOilGas
What the oil and gas from this lease sold for each year, 1998 to 2022, at each month's public prices.
YearOil, dollarsGas, dollarsTotal
1998$0$29$29
1999$0$254$254
2000$0$405$405
2001$0$235 in priced filings$235 in priced filings
2002$0$162$162
2003$0$489 in priced filings$489 in priced filings
2004$0$777 in priced filings$777 in priced filings
2005$0$2,260 in priced filings$2,260 in priced filings
2006$0$1,110$1,110
2007$0$4,530$4,530
2008$0$3,660$3,660
2009$0$1,640$1,640
2010$0$2,630$2,630
2011$0$1,350$1,350
2012$0$705$705
2013$0$584$584
2014$0$960 in priced filings$960 in priced filings
2015$0$543$543
2016$0$64 in priced filings$64 in priced filings
2017$0$420$420
2018$0$530$530
2019$0$185$185
2020$0$118$118
2021$0$1,360$1,360
2022$0$2,180$2,180

Did a relative own a share of this lease?

The bars show every year. Pick one to add up what the lease has sold since.

SourcesRailroad Commission Production Data Query, every monthly report since August 1998. EIA monthly WTI and Henry Hub prices. Not a forecast, not reserves.

Who has run this lease

The operator changed two times, most recently in December 2011

The company named on each monthly report to the State. The operator is not always the company that pays.

  1. Subsurface Production, Inc.December 2011 to December 2022
  2. Operator number 171415January 2005 to November 2011
  3. Operator number 172244August 1998 to December 2004

SourcesRailroad Commission production reports, the operator on each month’s report, August 1998 through December 2022.

The newest well, seen from the side

No well on the way. Well 18 was completed in June 1985.

ground1,000 ft181,330 ft deep
  1. Permit filedNot on file
  2. Drilling startedNot on file
  3. FrackedNot on file
  4. Completion filedJune 18, 1985
  5. First production on the leaseNot on file
  6. First checkNot on file

SourcesRailroad Commission drilling permits and well records, and the FracFocus registry. Lease record built November 18, 2026.

Royalty Watch follows new well permits and completions on this lease.Watch this lease

About 6 miles across

Wells on this lease and around it

1this lease, ringed
0producing
0fracked and waiting
0permits, last 24 months
11plugged
40original land surveys

For a lawyer, a buyer or a probate file. Wells and permits within about 2 miles. Railroad Commission of Texas, FracFocus and USGS imagery.

Use this map on your site

You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.

Download the picture (WebP)
<a href="https://royaltyclerk.com/texas/leases/davis-a-e-7b-119330-g"><img src="https://royaltyclerk.com/maps/lease-wells/davis-a-e-7b-119330-g.svg" alt="Map of the Davis, A.e. lease in Brown County, Texas: its well ringed, among 38 wells and 0 recent drilling locations in a picture about 6 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/leases/davis-a-e-7b-119330-g">Wells on the Davis, A.e. lease, Brown County, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>

From the State's well records

One well on this lease

Wells on Davis, A.e.
WellAPI numberCompletedDepthfeetToday
1842-049-34143June 19851,330Shut in

SourceRailroad Commission wellbore and completion records.

What the drilling permits say

3,560acres on the newest permit

3,560 ACRES
  • 3,560 acres, on the 1984 permits
Check your decimal on this lease

Gas · last sale month, December 2022 New

Four prices for the same gas

Last sale December 2022. Henry Hub $5.53 in December 2022, the last sale month.

$5.53
The marketEIA Henry Hub, December 2022, the last sale month
not on file
Told its investorsNo comparable investor filing on file.
not on file yet
Told the tax officeTexas Comptroller, this lease
?
Your statementOnly you hold this one.

Texas Comptroller

Tax approval on record

TWO YEAR INACTIVE WELL, approved January 9, 2009.

EIA record dated October 1, 2026

Estimate your royalty

Type the decimal from your division order

The starting decimal is an example. Nothing you type here leaves this page.

$0.74a month

At these prices the whole lease’s reported sales were about $2,290 over 12 reported months. Your estimated share is $8.94 before taxes and deductions.

Monthly owner volumes and values
Estimated share before tax and deductions
MonthOil (bbl)Oil valueGas (mcf)Gas valueTotal
December 20220$0.000.125$0.69$0.69
November 20220$0.000.1172$0.64$0.64
October 20220$0.000.1172$0.66$0.66
September 20220$0.000.1211$0.95$0.95
August 20220$0.000.125$1.10$1.10
July 20220$0.000.1094$0.80$0.80
June 20220$0.000.1133$0.87$0.87
May 20220$0.000.1211$0.99$0.99
April 20220$0.000.1172$0.77$0.77
March 20220$0.000.1133$0.56$0.56
February 20220$0.000.1055$0.49$0.49
December 20210$0.000.1094$0.41$0.41

SourcesRailroad Commission monthly production, EIA Henry Hub, SEC filings and Texas Comptroller records.

Watch Plus sets public prices beside the price on your statement.See Watch Plus

Who takes the oil and gasNew

No buyer shares an owner with the operator

The State lists who gathers and who buys from each lease. Company filings list who owns whom. Here they are on one drawing.

GAS
Runs the leaseSubsurface Production, Inc.since December 2011
Gathers and buys 100%PETROLIA GROUP, L.L.C.since May 2014

No shared owner, officer or address on record between the gas buyers and the operator.

SourcesBuyers and gatherers: Railroad Commission Form P-4 records, as of October 24, 2026. Ownership: U.S. Securities and Exchange Commission filings.

Royalty Watch tells you the day the buyer of your oil or gas changes.Watch this lease

Seen from space

Heat at the pad, beside reported gas use

A-790 · RODRIGUEZ, J JONE SATELLITE PIXEL, ABOUT 375 M
DAYNIGHT

Satellite match

Not matched

The lease’s newest month on record, December 2022, is before the satellites’ record begins in February 2024.

—

nights of heat

—

months with reported flaring (disposition records unavailable)

—

months with heat and none reported

SourcesNOAA VIIRS night readings and Railroad Commission gas disposition reports. Satellite record through November 17, 2026.

Watch Plus checks statement months beside the satellite record.See Watch Plus

Where the gas went, month by month

All of the gas went to a transmission line in the last 12 months

Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.

All of the gas went to a transmission line in the last 12 monthsShare of Davis, A.e. gas by disposition code each month, January 2020 to December 2022. All of the gas went to a transmission line in the last 12 months.Share of the lease’s gas by disposition code, per month0%50%100%Jan 20AprJulOctJan 21AprJulOctJan 22AprJulOct
All of the gas went to a transmission line in the last 12 monthsShare of Davis, A.e. gas by disposition code each month, January 2020 to December 2022. All of the gas went to a transmission line in the last 12 months.Share of gas by disposition code0%50%100%Jan 20JulJan 21JulJan 22Jul

SourcesRailroad Commission production reports, gas disposition by code, January 2020 to December 2022.

The county appraisal roll

No public roll figures

County mineral roll

No public roll figures

There are no publishable figures for this lease from the 2026 county mineral roll.

Royalty Clerk has mineral rolls for 146 Texas counties.

Source County appraisal district mineral rolls.

From the state record

Ask a question about Davis, A.e.

The available public records have no additional lease-specific answers as of November 18, 2026.

Every monthly report the State holds

293 months, newest first

Ledger for Davis, A.e.
MonthGas soldthousand cubic feetFlared or ventedthousand cubic feetSold forat public pricesOperator
DecemberDec 2022320$177Subsurface Production, Inc.
NovemberNov 2022300$164Subsurface Production, Inc.
OctoberOct 2022300$170Subsurface Production, Inc.
SeptemberSep 2022310$244Subsurface Production, Inc.
AugustAug 2022320$282Subsurface Production, Inc.
JulyJul 2022280$204Subsurface Production, Inc.
JuneJun 2022290$223Subsurface Production, Inc.
MayMay 2022310$252Subsurface Production, Inc.
AprilApr 2022300$198Subsurface Production, Inc.
MarchMar 2022290$142Subsurface Production, Inc.
FebruaryFeb 2022270$127Subsurface Production, Inc.
JanuaryJan 2022No report on file–
DecemberDec 2021280$105Subsurface Production, Inc.
NovemberNov 2021300$152Subsurface Production, Inc.
OctoberOct 2021310$171Subsurface Production, Inc.
SeptemberSep 2021320$165Subsurface Production, Inc.
AugustAug 2021300$122Subsurface Production, Inc.
JulyJul 2021320$123Subsurface Production, Inc.

SourcesTexas Railroad Commission Production Data Query, through December 2022. Prices: EIA.

Do your checks match this lease?

Check my statement

Likely owed Jan 2025

A whole month was never paid

The state shows 28,175 bbl of oil sold from this lease in January 2025, so your share is 27.51 bbl. No statement covers January 2025. That is the month the operator changed from Endeavor Energy Resources to Diamondback.

Ask Diamondback owner relations: is January 2025 being held in suspense after the change of operator?

$2,277oil + gas

A sample finding, from our example check. The full example found $3,328 likely owed.

Around this lease

Nearby

Leases within 10 km

New drilling permits in Brown County

  • MOORE, E. C. #5re-entry · Reach Oil · Dec 4, 2024
  • D.V. GOODE 272 #4new drill · Cpmak Investments, Inc. · Oct 12, 2023

Same name in district 7B

Where it sits

This county

Brown CountyBrownCallahanEastlandErathComancheMillsColemanBrown County
Brown County

Where this page comes from

  • Railroad Commission of Texas production, Form P-4, permits, wells
  • Texas Comptroller tax approvals, lease values
  • U.S. Energy Information Administration prices
  • NOAA storms and cold
  • U.S. Geological Survey photos