Texas gas well · RRC district 03 · Lease 280187
ProducingDLCC
Dlcc is a gas well in Wharton County, Texas, operated by Transpacific Energy, LLC in the Phase Four (9560 Yegua) field. The Railroad Commission shows 10 bbl of oil in the 12 months through Jul 2026.
Oil lease dossier · 1 well
- Operator
- Transpacific Energy, LLC
- County
- Wharton County
- RRC lease
- 03-280187
Own a share of this lease?
Is your check right?
Upload a check stub or a phone photo. We compare every month with the state numbers on this page.
Free. No account needed. Two to four pages.
Where it sits
This county
- Oil in Jul 2026
- 1 bbl
- Reporting to the state
- since Jan 2020
- Wells
- 1
- Data through
- Jul 2026
Production
Month by month, from the state record
Oil output rose 150% over the last 12 months
10 bbl in the 12 months through Jul 2026, against 4 bbl in the 12 months before.
- Oil (bars, left axis)
- Gas (line, right axis)
- Last 12 months
SourceTexas Railroad Commission Production Data Query, gas well 280187, district 03. Reported through Jul 2026. The state revises recent months.
Gas disposition
Where the gas went
Since Jan 2025 the lease's gas goes to lease fuel instead of a transmission line
Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.
- Transmission line (2)
- Lease fuel (1)
SourceTexas Railroad Commission Production Data Query, gas disposition by code, lease 280187, district 03. Reported through Jul 2026.
Transmission line (2)
Sold straight into a pipeline without processing. Processing fees on your statement would be worth asking about.
Lease fuel (1)
Burned to run equipment on the lease. Not sold, so it pays no royalty. A few percent is normal.
None of the gas was flared in the 9 months reported.
Operator history
Who has run this lease
Transpacific Energy, LLC has reported this lease for the whole period
No change of operator in the months we hold.
- Transpacific Energy, LLC Jan 2020 to now
SourceTexas Railroad Commission Production Data Query, operator by month. Reported through Jul 2026.
Wells
1 well on this lease
| API number | Well no. | Status | Total depthft |
|---|---|---|---|
| 42-481-35359 | 1 | Shut-in | – |
SourceTexas Railroad Commission Wellbore Query, district 03, lease 280187.
Who buys and gathers
Who moves and buys this lease's production
Condensate
Gulfmark Energy, Inc. gathers it.
100% of it, on the list since Aug 1, 2020
Gas from gas wells
Dcp Operating Company, LP buys and gathers it.
Dcp Operating Company, LP buys it: 100% of it, on the list since Apr 1, 2017 · Dcp Operating Company, LP gathers it: 100% of it, on the list since Apr 1, 2017
Companies that used to be listed: Sunoco Ptnrs. Mktg.&terminals LP (gathers it, until Aug 1, 2020).
SourceRailroad Commission of Texas, Form P-4 file, dated Sep 24, 2026 (source). A listed company is authorised to move or buy the production; the state does not say what it paid.
Unit and wells
212.55 acres on the newest permit
- Wells on the permits
- 11 not plugged
- Horizontal
- 0
- First completion
- Dec 2, 2014
- Latest permit
- Oct 8, 2014
| API number | Well no. | Permit issued | Completed | Acreson the permit |
|---|---|---|---|---|
| 42-481-35359 | 1 | Oct 8, 2014 | Dec 2, 2014 | 212.55 |
Estimator
Estimate your royalty for this lease
Estimator
What could your check be?
Your decimal interest is the small number on your division order that says what share of the whole lease (8/8ths) is yours. Type it in and we apply it to what the state says DLCC sold each month.
For example 0.00097656, or a fraction like 1/1024.
Your estimate appears here
An estimate, not your check
Ledger
36 months, newest first
| Month | Oil producedbbl | Oil soldbbl | Gas producedmcf | Gas soldmcf, codes 2+3 | Flaredmcf, code 4 | WTI$ per bbl | Henry Hub$ per MMBtu |
|---|---|---|---|---|---|---|---|
| Jul 2026Transpacific Energy, | 1 | 0 | 0 | 0 | 0 | $80.46 | $2.89 |
| Jun 2026Transpacific Energy, | 0 | 0 | 0 | 0 | 0 | $84.81 | $3.15 |
| May 2026Transpacific Energy, | 2 | 0 | 0 | 0 | 0 | $102.13 | $2.94 |
| Apr 2026Transpacific Energy, | 0 | 0 | 0 | 0 | 0 | $100.32 | $2.77 |
| Mar 2026Transpacific Energy, | 2 | 0 | 0 | 0 | 0 | $91.38 | $3.04 |
| Feb 2026Transpacific Energy, | 0 | 0 | 0 | 0 | 0 | $64.51 | $3.62 |
| Jan 2026Transpacific Energy, | 2 | 0 | 0 | 0 | 0 | $60.04 | $7.72 |
| Dec 2025Transpacific Energy, | 0 | 0 | 0 | 0 | 0 | $57.97 | $4.26 |
| Nov 2025Transpacific Energy, | 2 | 0 | 0 | 0 | 0 | $60.06 | $3.79 |
| Oct 2025Transpacific Energy, | 0 | 0 | 0 | 0 | 0 | $60.89 | $3.19 |
| Sep 2025Transpacific Energy, | 1 | 0 | 0 | 0 | 0 | $63.96 | $2.97 |
| Aug 2025Transpacific Energy, | 0 | 0 | 0 | 0 | 0 | $64.86 | $2.91 |
| Jul 2025Transpacific Energy, | 1 | 0 | 0 | 0 | 0 | $68.39 | $3.20 |
| Jun 2025Transpacific Energy, | 0 | 0 | 0 | 0 | 0 | $68.17 | $3.02 |
| May 2025Transpacific Energy, | 2 | 0 | 0 | 0 | 0 | $62.17 | $3.12 |
| Apr 2025Transpacific Energy, | 0 | 0 | 0 | 0 | 0 | $63.54 | $3.42 |
| Mar 2025Transpacific Energy, | 1 | 0 | 0 | 0 | 0 | $68.24 | $4.12 |
| Feb 2025Transpacific Energy, | 0 | 0 | 0 | 0 | 0 | $71.53 | $4.19 |
| Jan 2025Transpacific Energy, | 0 | 0 | 52 | 3 | 0 | $75.74 | $4.13 |
| Dec 2024Transpacific Energy, | 0 | 0 | 135 | 117 | 0 | $70.12 | $3.01 |
| Nov 2024Transpacific Energy, | 0 | 0 | 0 | 0 | 0 | $69.95 | $2.12 |
| Oct 2024Transpacific Energy, | 0 | 0 | 0 | 0 | 0 | $71.99 | $2.20 |
| Sep 2024Transpacific Energy, | 0 | 0 | 67 | 67 | 0 | $70.24 | $2.28 |
| Aug 2024Transpacific Energy, | 0 | 0 | 67 | 67 | 0 | $76.68 | $1.99 |
| Jul 2024Transpacific Energy, | 1 | 0 | 39 | 39 | 0 | $81.80 | $2.07 |
| Jun 2024Transpacific Energy, | 0 | 0 | 58 | 58 | 0 | $79.77 | $2.54 |
| May 2024Transpacific Energy, | 0 | 0 | 56 | 56 | 0 | $80.02 | $2.12 |
| Apr 2024Transpacific Energy, | 0 | 0 | 55 | 55 | 0 | $85.35 | $1.60 |
| Mar 2024Transpacific Energy, | 0 | 0 | 247 | 195 | 0 | $81.28 | $1.49 |
| Feb 2024Transpacific Energy, | 0 | 0 | 0 | 0 | 0 | $77.25 | $1.72 |
| Jan 2024Transpacific Energy, | 2 | 0 | 0 | 0 | 0 | $74.15 | $3.18 |
| Dec 2023Transpacific Energy, | 0 | 0 | 0 | 0 | 0 | $71.90 | $2.52 |
| Nov 2023Transpacific Energy, | 1 | 0 | 0 | 0 | 0 | $77.69 | $2.71 |
| Oct 2023Transpacific Energy, | 1 | 0 | 0 | 0 | 0 | $85.64 | $2.98 |
| Sep 2023Transpacific Energy, | 1 | 0 | 0 | 0 | 0 | $89.43 | $2.64 |
| Aug 2023Transpacific Energy, | 1 | 0 | 0 | 0 | 0 | $81.39 | $2.58 |
No report filed More than 3% of gas flared
SourceVolumes: Texas Railroad Commission Production Data Query, reported through Jul 2026. Prices: EIA WTI Cushing spot and Henry Hub spot, monthly, through Aug 2026. “Gas sold” is gas sent to a transmission line (code 2) or a plant (code 3).
Check your statements
Do your checks match this lease?
Upload your statements for DLCC. We compare volumes, prices, deductions and timing with the state record and give you the exact question to ask Transpacific Energy, LLC.
- A month that was never paid
- Your share of the barrels and mcf
- The price against WTI and Henry Hub
- Fees taken on gas
- Late payment interest
Around this lease
Walk the neighborhood
This lease belongs to
Transpacific Energy, LLC in Wharton County
- DUSON
59,400 mcf last 12 months
- WATZ
9,618 mcf last 12 months
- VICTOR
3,087 mcf last 12 months
- BETTY MAE UNIT
105 mcf last 12 months
- REED UNIT
107 mcf last 12 months
Phase Four (9560 Yegua) field
No other producing leases in this field are in our data yet.
Leases within 10 km
Found by the location of their wells.
- DLCC
6 bbl last 12 months · 0.1 km away
- ARMOUR TRUST, ET AL
0 bbl last 12 months · 0.4 km away
- PIERCE RANCH N 4900 UNIT
11,366 bbl last 12 months · 1.2 km away
- PIERCE ESTATES -A-
15,608 bbl last 12 months · 1.4 km away
- ARMOUR TRUST ET AL
0 mcf last 12 months · 1.4 km away
Drilling permits within 10 km
KAINER HEIRS UNIT #2
new drill · MB Energy, LLC · Wharton County · 5.7 km away
Permit 0915244 · Apr 30, 2026
KUBELA #3
recompletion · Amexco, LLC · Wharton County · 5.9 km away
Permit 0914240 · Mar 20, 2026
WRIGHT #3
new drill · MB Energy, LLC · Wharton County · 7.7 km away
Permit 0903905 · Nov 12, 2024
MAYFIELD #1
new drill · MB Energy, LLC · Wharton County · 7.2 km away
Permit 0903216 · Oct 14, 2024
MOLLNAR #1
new drill · MB Energy, LLC · Wharton County · 9.1 km away
Permit 0900938 · Jul 2, 2024
How to read this page
Questions owners ask
What is a decimal interest?
It is your share of the whole lease, written as a decimal. A 1/4 royalty on 5 net acres in a 1,280-acre unit is 1/4 × 5 ÷ 1,280 = 0.00097656. Your division order states yours.
How do I use this page to check a royalty check?
Take the “Oil sold” volume for the month the check covers and multiply it by your decimal. The answer should match the barrels on your statement. If it does not, upload the statement and we will show where the two differ.
Why is the newest month Jul 2026?
The Railroad Commission publishes production two to three months after the fact and revises recent months. We re-pull the latest three months on every update.
Does this page show what my check should be?
No. It shows what the state recorded. Prices, fees and taxes depend on your lease and on what your operator gets for the oil and gas. The estimator gives a ceiling to compare against.
Sources and method
Where these numbers come from
- Production and disposition by month: Texas Railroad Commission Production Data Query, gas well 280187, district 03, reported through Jul 2026.
- Wells: Texas Railroad Commission Wellbore Query.
- Prices: U.S. Energy Information Administration, WTI Cushing spot and Henry Hub spot, monthly.
- Page updated Sep 28, 2026.
We show the state’s numbers as filed. Where the state has no report for a month, we say so instead of guessing.