Texas oil lease · RRC district 04 · Lease 13482
ProducingDUGGER, L.M.
Dugger, L.m. is an oil lease in Nueces County, Texas, operated by Alegre Operating, Inc. in the Minnie Bock, North (Frio Cons) field. The Railroad Commission shows 2,090 bbl of oil in the 12 months through May 2026.
Oil lease dossier · 7 wells
- Operator
- Alegre Operating, Inc.
- County
- Nueces County
- RRC lease
- 04-13482
Own a share of this lease?
Is your check right?
Upload a check stub or a phone photo. We compare every month with the state numbers on this page.
Free. No account needed. Two to four pages.
Where it sits
This county
- Gas, last 12 months
- 14,942 mcf
- Oil in May 2026
- 177 bbl
- Reporting to the state
- since Jan 2020
- Wells
- 7
Production
Month by month, from the state record
Oil output fell 56% over the last 12 months
1,799 bbl in the 12 months through Jul 2026, against 4,080 bbl in the 12 months before. 2 months were not reported. A red cross marks each one.
- Oil (bars, left axis)
- Gas (line, right axis)
- Last 12 months
SourceTexas Railroad Commission Production Data Query, oil lease 13482, district 04. Reported through Jul 2026. The state revises recent months.
Gas disposition
Where the gas went
Since Feb 2025 the lease's gas goes to lease fuel instead of a transmission line
Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.
- Transmission line (2)
- Lease fuel (1)
SourceTexas Railroad Commission Production Data Query, gas disposition by code, lease 13482, district 04. Reported through Jul 2026.
Transmission line (2)
Sold straight into a pipeline without processing. Processing fees on your statement would be worth asking about.
Lease fuel (1)
Burned to run equipment on the lease. Not sold, so it pays no royalty. A few percent is normal.
None of the gas was flared in the last 12 months.
Operator history
Who has run this lease
The operator changed 2 times, most recently in Nov 2025
If your statements skip or shrink around a change, ask the new operator's owner relations department whether the month is in suspense.
- Alegre Operating, Inc. Nov 2025 to May 2026
- KRC Operating, LLC Nov 2021 to Oct 2025
- Daylight Petroleum LLC Jan 2020 to Oct 2021
SourceTexas Railroad Commission Production Data Query, operator by month. Reported through Jul 2026.
Wells
7 wells on this lease
| API number | Well no. | Status | Total depthft |
|---|---|---|---|
| 42-355-00863 | 1 | Shut-in | – |
| 42-355-32544 | 8 | Shut-in | – |
| 42-355-32591 | 11 | Active | – |
| 42-355-32894 | 12 | Shut-in | – |
| 42-355-33896 | 20 | Shut-in | – |
| 42-355-33936 | 22 | Shut-in | – |
| 42-355-34057 | 26 | Shut-in | – |
SourceTexas Railroad Commission Wellbore Query, district 04, lease 13482.
Who buys and gathers
Who moves and buys this lease's production
Oil
Gulfmark Energy, Inc. and Sunray Marketing, LLC gather it.
Gulfmark Energy, Inc. gathers it: 50% of it, on the list since Nov 1, 2025 · Sunray Marketing, LLC gathers it: 50% of it, on the list since Nov 1, 2025
Gas from oil wells
Enerfin Field Services LLC buys and gathers it.
Enerfin Field Services LLC buys it: 100% of it, on the list since Sep 1, 2015 · Enerfin Field Services LLC gathers it: 100% of it, on the list since Sep 1, 2015
Companies that used to be listed: Dorado Oil Company (gathers it, until Nov 1, 2025); Gulfmark Energy, Inc. (gathers it, until Nov 1, 2021); Shell Trading (Us) Company (gathers it, until Nov 1, 2021); Gulfmark Energy, Inc. (gathers it, until Sep 1, 2020); Gulfmark Energy, Inc. (gathers it, until Jan 29, 2020); Sunoco Ptnrs. Mktg.&terminals LP (gathers it, until Jan 29, 2020).
SourceRailroad Commission of Texas, Form P-4 file, dated Sep 24, 2026 (source). A listed company is authorised to move or buy the production; the state does not say what it paid.
Unit and wells
320 acres on the newest permit
- Wells on the permits
- 96 not plugged
- Horizontal
- 0
- First completion
- Jun 10, 1977
- Latest permit
- May 1, 2012
9 wells are listed on this lease
Each well can have its own unit. The decimal for one well does not have to equal the decimal for another.
| API number | Well no. | Permit issued | Completed | Acreson the permit |
|---|---|---|---|---|
| 42-355-34057 | 26 | May 1, 2012 | Sep 21, 2012 | 320 |
| 42-355-32544 | 8 | Sep 16, 2011 | Aug 30, 2011 | 320 |
| 42-355-33936 | 22 | Nov 19, 2009 | Oct 13, 2009 | 320 |
| 42-355-33896 | 20 | Nov 20, 2008 | Oct 23, 2008 | 320 |
| 42-355-32894 | 12 | Feb 6, 2008 | Feb 1, 2008 | 320 |
| 42-355-33152 | 16 | Jan 29, 2003 | Jan 31, 2003 | 320 |
| 42-355-32569 | 9R | Jul 27, 2000 | Jul 28, 2000 | 320 |
| 42-355-32591 | 11 | Sep 25, 1991 | Dec 4, 1996 | 320 |
| 42-355-00863 | 1 | Jul 15, 1977 | Jun 10, 1977 | 320 |
Estimator
Estimate your royalty for this lease
Estimator
What could your check be?
Your decimal interest is the small number on your division order that says what share of the whole lease (8/8ths) is yours. Type it in and we apply it to what the state says DUGGER, L.M. sold each month.
For example 0.00097656, or a fraction like 1/1024.
Dollars per barrel. Your statements show the gap your operator uses. Leave 0 to price oil at WTI.
Your estimate appears here
An estimate, not your check
Ledger
36 months, newest first
| Month | Oil producedbbl | Oil soldbbl | Gas producedmcf | Gas soldmcf, codes 2+3 | Flaredmcf, code 4 | WTI$ per bbl | Henry Hub$ per MMBtu |
|---|---|---|---|---|---|---|---|
| Jul 2026No report | – | – | – | – | – | $80.46 | $2.89 |
| Jun 2026No report | – | – | – | – | – | $84.81 | $3.15 |
| May 2026Alegre Operating, | 177 | 181 | 0 | 0 | 0 | $102.13 | $2.94 |
| Apr 2026Alegre Operating, | 5 | 0 | 0 | 0 | 0 | $100.32 | $2.77 |
| Mar 2026Alegre Operating, | 5 | 0 | 0 | 0 | 0 | $91.38 | $3.04 |
| Feb 2026Alegre Operating, | 35 | 162 | 0 | 0 | 0 | $64.51 | $3.62 |
| Jan 2026Alegre Operating, | 121 | 0 | 320 | 0 | 0 | $60.04 | $7.72 |
| Dec 2025Alegre Operating, | 203 | 147 | 624 | 0 | 0 | $57.97 | $4.26 |
| Nov 2025Alegre Operating, | 90 | 83 | 1,403 | 0 | 0 | $60.06 | $3.79 |
| Oct 2025KRC Operating, | 484 | 586 | 3,406 | 806 | 0 | $60.89 | $3.19 |
| Sep 2025KRC Operating, | 354 | 364 | 3,493 | 1,322 | 0 | $63.96 | $2.97 |
| Aug 2025KRC Operating, | 325 | 373 | 2,055 | 823 | 0 | $64.86 | $2.91 |
| Jul 2025KRC Operating, | 214 | 195 | 2,084 | 944 | 0 | $68.39 | $3.20 |
| Jun 2025KRC Operating, | 77 | 0 | 1,557 | 565 | 0 | $68.17 | $3.02 |
| May 2025KRC Operating, | 356 | 529 | 1,422 | 486 | 0 | $62.17 | $3.12 |
| Apr 2025KRC Operating, | 353 | 371 | 1,574 | 449 | 0 | $63.54 | $3.42 |
| Mar 2025KRC Operating, | 392 | 348 | 1,599 | 607 | 0 | $68.24 | $4.12 |
| Feb 2025KRC Operating, | 327 | 380 | 2,670 | 1,250 | 0 | $71.53 | $4.19 |
| Jan 2025KRC Operating, | 327 | 178 | 2,437 | 1,877 | 0 | $75.74 | $4.13 |
| Dec 2024KRC Operating, | 406 | 518 | 4,843 | 3,366 | 0 | $70.12 | $3.01 |
| Nov 2024KRC Operating, | 458 | 378 | 3,334 | 1,447 | 0 | $69.95 | $2.12 |
| Oct 2024KRC Operating, | 367 | 553 | 1,321 | 493 | 0 | $71.99 | $2.20 |
| Sep 2024KRC Operating, | 352 | 197 | 2,345 | 748 | 0 | $70.24 | $2.28 |
| Aug 2024KRC Operating, | 451 | 513 | 2,461 | 864 | 0 | $76.68 | $1.99 |
| Jul 2024KRC Operating, | 395 | 142 | 2,305 | 748 | 0 | $81.80 | $2.07 |
| Jun 2024KRC Operating, | 511 | 597 | 2,105 | 548 | 0 | $79.77 | $2.54 |
| May 2024KRC Operating, | 508 | 475 | 1,647 | 692 | 0 | $80.02 | $2.12 |
| Apr 2024KRC Operating, | 382 | 464 | 1,713 | 751 | 0 | $85.35 | $1.60 |
| Mar 2024KRC Operating, | 241 | 276 | 1,928 | 767 | 0 | $81.28 | $1.49 |
| Feb 2024KRC Operating, | 770 | 618 | 5,892 | 1,454 | 0 | $77.25 | $1.72 |
| Jan 2024KRC Operating, | 343 | 465 | 855 | 419 | 0 | $74.15 | $3.18 |
| Dec 2023KRC Operating, | 424 | 284 | 1,695 | 605 | 0 | $71.90 | $2.52 |
| Nov 2023KRC Operating, | 67 | 174 | 181 | 57 | 0 | $77.69 | $2.71 |
| Oct 2023KRC Operating, | 87 | 0 | 489 | 131 | 0 | $85.64 | $2.98 |
| Sep 2023KRC Operating, | 187 | 178 | 7,369 | 1,532 | 0 | $89.43 | $2.64 |
| Aug 2023KRC Operating, | 126 | 138 | 426 | 133 | 0 | $81.39 | $2.58 |
No report filed More than 3% of gas flared
SourceVolumes: Texas Railroad Commission Production Data Query, reported through Jul 2026. Prices: EIA WTI Cushing spot and Henry Hub spot, monthly, through Aug 2026. “Gas sold” is gas sent to a transmission line (code 2) or a plant (code 3).
Check your statements
Do your checks match this lease?
Upload your statements for DUGGER, L.M.. We compare volumes, prices, deductions and timing with the state record and give you the exact question to ask Alegre Operating, Inc.
- A month that was never paid
- Your share of the barrels and mcf
- The price against WTI and Henry Hub
- Fees taken on gas
- Late payment interest
Around this lease
Walk the neighborhood
This lease belongs to
Alegre Operating, Inc. in Nueces County
- BICKLER-MOSELY
10,850 mcf last 12 months
- EWING, J. H.
7,458 mcf last 12 months
- BICKLER-MOSELY
24,301 mcf last 12 months
- EWING, J. H.
13,865 mcf last 12 months
- LUBY J. P.
2,060 bbl last 12 months
Minnie Bock, North (Frio Cons) field
- BICKLER-MOSELY
10,850 mcf last 12 months
- BICKLER-MOSELY
24,301 mcf last 12 months
- EWING, J. H.
13,865 mcf last 12 months
- BICKLER-MOSELY
24,910 mcf last 12 months
- HERRING ELLA
338 bbl last 12 months
Leases within 10 km
Found by the location of their wells.
- DUGGER, L. M.
5,540 mcf last 12 months · 0.2 km away
- DUGGER, L. M.
0 mcf last 12 months · 0.3 km away
- DUGGER, L. M.
0 mcf last 12 months · 0.4 km away
- DUGGER, L. M.
0 mcf last 12 months · 0.4 km away
- HERRING ELLA
338 bbl last 12 months · 0.5 km away
Drilling permits within 10 km
HARLAN #1
new drill · Paloma Operating, LLC · Nueces County · 8.9 km away
Permit 0916490 · Jun 18, 2026
RIVERS #1
new drill · Paloma Operating, LLC · Nueces County · 8 km away
Permit 0912711 · Jan 14, 2026
DRISCOLL FOUNDATION #1D
re-entry · Paloma Operating, LLC · Nueces County · 8.7 km away
Permit 0911800 · Nov 18, 2025
KITTOE #1
new drill · Pangea's Edge Operating Co LLC · Nueces County · 8 km away
Permit 0910960 · Oct 16, 2025
DRISCOLL FOUNDATION #1
new drill · Paloma Operating, LLC · Nueces County · 8.6 km away
Permit 0906298 · Mar 3, 2025
How to read this page
Questions owners ask
What is a decimal interest?
It is your share of the whole lease, written as a decimal. A 1/4 royalty on 5 net acres in a 1,280-acre unit is 1/4 × 5 ÷ 1,280 = 0.00097656. Your division order states yours.
How do I use this page to check a royalty check?
Take the “Oil sold” volume for the month the check covers and multiply it by your decimal. The answer should match the barrels on your statement. If it does not, upload the statement and we will show where the two differ.
Why is the newest month May 2026?
The Railroad Commission publishes production two to three months after the fact and revises recent months. We re-pull the latest three months on every update.
Does this page show what my check should be?
No. It shows what the state recorded. Prices, fees and taxes depend on your lease and on what your operator gets for the oil and gas. The estimator gives a ceiling to compare against.
Sources and method
Where these numbers come from
- Production and disposition by month: Texas Railroad Commission Production Data Query, oil lease 13482, district 04, reported through Jul 2026.
- Wells: Texas Railroad Commission Wellbore Query.
- Prices: U.S. Energy Information Administration, WTI Cushing spot and Henry Hub spot, monthly.
- Page updated Sep 28, 2026.
We show the state’s numbers as filed. Where the state has no report for a month, we say so instead of guessing.