Texas oil lease
ProducingDUNN A
Dunn A is an oil lease in Robertson County, Texas, operated by Wildfire Energy Operating LLC in the Aguila Vado (Eagleford) field.
2 wells
- Operator
- Wildfire Energy Operating LLC
- County
- Robertson County
- RRC lease
- 05-04097
Is your family on this lease?
Where it sits
This county
- Gas, last 12 months
- 1,692 mcf
- Oil in Jul 2026
- 583 bbl
Did a relative own a share of this lease?
Pick the year they passed and see what the lease has sold since.
Wells on this lease and around it
- This lease2Its wells, ringed on the map: all producing
- Drilling locations0Permits issued in the last two years
- Producing wells33On a lease reporting production now
- Not producing6Shut in, inactive or no lease on record
- Plugged3The state's wellbore record says plugged
The 2 ringed dots are this lease's wells, each where the Railroad Commission's map puts it. The other dots are wells and drilling permits of the last 24 months on the land around it; the counts are for everything in the picture, which is about 6 miles across. The thin brown lines are the original land surveys; where there is room, a survey carries its abstract number, the number deeds and division orders cite. Sources: Railroad Commission of Texas well layers, drilling permit files and survey lines, US Census Bureau county outlines, base map from USGS The National Map.
A one-page map of this lease to print, for a lawyer, a buyer or a probate file.
Use this map on your site
You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.
<a href="https://royaltyclerk.com/texas/leases/dunn-a-05-04097"><img src="https://royaltyclerk.com/maps/lease-wells/dunn-a-05-04097.svg" alt="Map of the Dunn A lease in Robertson County, Texas: its 2 wells ringed, among 42 wells and 0 recent drilling locations in a picture about 6 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/leases/dunn-a-05-04097">Wells on the Dunn A lease, Robertson County, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>Production by month
Oil output fell 3% over the last 12 months
3 months were not reported.
- Oil (bars)
- Gas (line)
- Last 12 months
SourceTexas Railroad Commission Production Data Query, through Aug 2026.
From the state record
What owners ask about Dunn A
- When is the check for July 2026 due?
- July 2026 is the newest month the state has posted for this lease. Texas law gives the payor until 60 days after the end of the sale month for oil and 90 for gas: the oil by Sep 29, 2026 and the gas by Oct 29, 2026, unless the lease sets another time.
- Source: Railroad Commission production reports; Texas Natural Resources Code §91.402.
- See your next three checks
- Which Texas production tax rate applies?
- The Texas Comptroller lists low producing leases for this lease, from Nov 1, 2020. Its file does not give the rate, so we compare your stub with the full 4.6%. That is for July 2026.
- Source: Texas Comptroller, approved severance tax exemptions.
- Check the tax on your stub
- Who buys the oil and gas?
- Oil: Energy Trans Crude Marketing LLC gathers it. Gas from oil wells: Energy Transfer Company buys it; Wildfire Energy Midstream LLC gathers it. The buyer's price is what a royalty check is figured on.
- Source: Railroad Commission Form P-4, gatherers and purchasers.
- See every buyer and past buyers
- How many 1099s should an owner expect for 2025?
- One company, Wildfire Energy Operating LLC, filed this lease's reports behind every 2025 check, so most owners get one form. The operator is not always the company that pays, so go by the name on the stubs.
- Source: Railroad Commission production reports, operator of record by month.
- Check your 1099 against it
Free tools, already on this lease
Ask a question about Dunn A
33 years of state records, 1993–2026
DUNN A since 2014
We read every monthly report the Railroad Commission holds, back to January 1993. This lease first reported in October 2014. It filed 140 monthly reports through August 2026.
Sold since 2014
$14.3 million
What the whole lease’s oil and gas sold for at each month’s public prices, before tax and the operator’s deductions. A royalty owner’s share is their decimal of it.
- Oil sold
- 244,480 bbl
- Gas sold
- 48,965 mcf
- Best year
- 2015$3.5 million sold
- Last report
- Jul 2026First: Oct 2014
Its best year was 2015: $3.5 million of oil and gas sold
Each bar is what the lease’s oil and gas sold for that year, at that month’s prices. 2026 is only part of a year in the records, drawn lighter.
- Oil
- Gas
SourceTexas Railroad Commission Production Data Query, every monthly report since January 1993; EIA monthly WTI and Henry Hub prices (before 1997, EIA's yearly Texas natural gas wellhead price), through August 2026.
Every year as a table
| Year | Months | Oil sold, bbl | Gas sold, mcf | Sold for |
|---|---|---|---|---|
| 2026 * | 7 | 4,535 | 1,134 | $376,560 |
| 2025 | 10 | 6,333 | 405 | $416,097 |
| 2024 | 12 | 8,970 | 4 | $689,077 |
| 2023 | 12 | 10,003 | 1,032 | $784,527 |
| 2022 | 12 | 8,092 | 1,953 | $795,034 |
| 2021 | 12 | 11,759 | 4,509 | $802,505 |
| 2020 | 12 | 10,910 | 547 | $433,485 |
| 2019 | 12 | 14,371 | 857 | $824,691 |
| 2018 | 12 | 16,634 | 5,046 | $1,091,006 |
| 2017 | 12 | 21,651 | 7,271 | $1,122,733 |
| 2016 | 12 | 29,218 | 5,251 | $1,261,458 |
| 2015 | 12 | 69,616 | 19,734 | $3,510,757 |
| 2014 | 3 | 32,388 | 1,222 | $2,279,007 |
* Part of the year: the records run through August 2026.
Where the gas went
91% of the gas went to a transmission line in the last 12 months
Flaring peaked at 100.0% of the gas in Feb 2024.
- Processing plant (3)
- Transmission line (2)
- Lease fuel (1)
- Flared (4)
SourceTexas Railroad Commission Production Data Query, through Aug 2026.
Transmission line (2)
91% · 1,539 mcf
Lease fuel (1)
9.0% · 153 mcf
Who has run this lease
The operator changed 3 times, most recently in Jul 2024
- Wildfire Energy Operating LLC Jul 2024 to Jul 2026
- Baytex Energy USA, Inc. Jan 2024 to Jun 2024
- Rocc Operating, LLC Dec 2022 to Dec 2023
- Lonestar Operating, LLC Jan 2020 to Nov 2022
SourceTexas Railroad Commission Production Data Query, through Aug 2026.
2 wells on this lease
| API number | Well | Status | Completed |
|---|---|---|---|
| 42-395-31956 | Dunn A 1H | Active | Oct 29, 2014 |
| 42-395-31957 | Dunn A 2H | Active | Oct 29, 2014 |
SourceTexas Railroad Commission production records and full wellbore file.
Buyers and gatherers
| Company | Product | Role | Share% | From | Until |
|---|---|---|---|---|---|
| Energy Trans Crude Marketing LLC | Oil | Gathers | 100 | Feb 1, 2022 | – |
| Energy Transfer Company | Casinghead gas | Buys | 100 | Feb 1, 2022 | – |
| Wildfire Energy Midstream LLC | Casinghead gas | Gathers | 100 | Aug 1, 2022 | – |
| Hawkwood Energy Midstream, LLC | Casinghead gas | Gathers | 100 | Feb 1, 2022 | Aug 1, 2022 |
| Halcon Field Services, LLC | Casinghead gas | Gathers | 100 | Oct 29, 2014 | Feb 1, 2022 |
| Halcon Field Services, LLC | Casinghead gas | Buys | 100 | Oct 29, 2014 | Feb 1, 2022 |
| Shell Trading (Us) Company | Oil | Gathers | 100 | Oct 1, 2015 | Feb 1, 2022 |
SourceRailroad Commission Form P-4 file, Oct 24, 2026 (source).
320 acres on the newest permit
- Good to know
The wells on this lease state different acreage
The permits state between 305.98 and 320 acres. Use the acres from your own division order for the well you are paid on.
| API number | Well no. | Permit issued | Completed | Acreson the permit |
|---|---|---|---|---|
| 42-395-31957 | 2H | Jul 30, 2014 | Oct 29, 2014 | 320 |
| 42-395-31956 | 1H | Jul 19, 2014 | Oct 29, 2014 | 305.98 |
Estimate your royalty
36 months, newest first
| Month | Oil producedbbl | Oil soldbbl | Gas producedmcf | Gas soldmcf, codes 2+3 | Flaredmcf | WTI$/bbl | Henry Hub$/MMBtu |
|---|---|---|---|---|---|---|---|
| Aug 2026No report | – | – | – | – | – | $83.90 | $2.78 |
| Jul 2026Wildfire Energy | 583 | 686 | 162 | 147 | 0 | $80.46 | $2.89 |
| Jun 2026Wildfire Energy | 583 | 720 | 185 | 168 | 0 | $84.81 | $3.15 |
| May 2026Wildfire Energy | 612 | 363 | 208 | 189 | 0 | $102.13 | $2.94 |
| Apr 2026Wildfire Energy | 595 | 707 | 196 | 178 | 0 | $100.32 | $2.77 |
| Mar 2026Wildfire Energy | 651 | 683 | 193 | 176 | 0 | $91.38 | $3.04 |
| Feb 2026Wildfire Energy | 543 | 704 | 145 | 132 | 0 | $64.51 | $3.62 |
| Jan 2026Wildfire Energy | 639 | 672 | 158 | 144 | 0 | $60.04 | $7.72 |
| Dec 2025Wildfire Energy | 611 | 550 | 168 | 153 | 0 | $57.97 | $4.26 |
| Nov 2025Wildfire Energy | 626 | 516 | 187 | 170 | 0 | $60.06 | $3.79 |
| Oct 2025Wildfire Energy | 642 | 527 | 26 | 24 | 0 | $60.89 | $3.19 |
| Sep 2025Wildfire Energy | 568 | 548 | 6 | 5 | 0 | $63.96 | $2.97 |
| Aug 2025Wildfire Energy | 638 | 719 | 58 | 53 | 0 | $64.86 | $2.91 |
| Jul 2025Wildfire Energy | 677 | 713 | 0 | 0 | 0 | $68.39 | $3.20 |
| Jun 2025Wildfire Energy | 635 | 880 | 0 | 0 | 0 | $68.17 | $3.02 |
| May 2025Wildfire Energy | 608 | 355 | 0 | 0 | 0 | $62.17 | $3.12 |
| Apr 2025Wildfire Energy | 674 | 690 | 0 | 0 | 0 | $63.54 | $3.42 |
| Mar 2025No report | – | – | – | – | – | $68.24 | $4.12 |
| Feb 2025No report | – | – | – | – | – | $71.53 | $4.19 |
| Jan 2025Wildfire Energy | 724 | 835 | 0 | 0 | 0 | $75.74 | $4.13 |
| Dec 2024Wildfire Energy | 745 | 718 | 0 | 0 | 0 | $70.12 | $3.01 |
| Nov 2024Wildfire Energy | 805 | 707 | 0 | 0 | 0 | $69.95 | $2.12 |
| Oct 2024Wildfire Energy | 820 | 960 | 0 | 0 | 0 | $71.99 | $2.20 |
| Sep 2024Wildfire Energy | 542 | 522 | 293 | 0 | 293 | $70.24 | $2.28 |
| Aug 2024Wildfire Energy | 691 | 536 | 374 | 0 | 374 | $76.68 | $1.99 |
| Jul 2024Wildfire Energy | 694 | 884 | 390 | 0 | 390 | $81.80 | $2.07 |
| Jun 2024Baytex Energy | 682 | 681 | 403 | 0 | 403 | $79.77 | $2.54 |
| May 2024Baytex Energy | 730 | 735 | 431 | 1 | 430 | $80.02 | $2.12 |
| Apr 2024Baytex Energy | 799 | 861 | 443 | 0 | 443 | $85.35 | $1.60 |
| Mar 2024Baytex Energy | 816 | 727 | 437 | 0 | 437 | $81.28 | $1.49 |
| Feb 2024Baytex Energy | 773 | 913 | 473 | 0 | 473 | $77.25 | $1.72 |
| Jan 2024Baytex Energy | 851 | 726 | 425 | 3 | 422 | $74.15 | $3.18 |
| Dec 2023Rocc Operating, | 674 | 512 | 319 | 1 | 318 | $71.90 | $2.52 |
| Nov 2023Rocc Operating, | 836 | 868 | 670 | 4 | 666 | $77.69 | $2.71 |
| Oct 2023Rocc Operating, | 1,360 | 1,398 | 758 | 4 | 754 | $85.64 | $2.98 |
| Sep 2023Rocc Operating, | 833 | 703 | 190 | 55 | 135 | $89.43 | $2.64 |
No report filed Flared above 3%
SourceTexas Railroad Commission Production Data Query, through Aug 2026. Prices: EIA.
How to check your stub against this lease Checks stopped on this lease? See the likely reasonsNearby
This lease belongs to
Wildfire Energy Operating LLC in Robertson County
- BLACKTAIL UNIT
8,509 bbl
- MUSE-CASH UNIT
8,004 bbl
- KAPSER UNIT
7,211 bbl
- VARISCO ESTATE UNIT
160,233 mcf
- KIMBLE-HICKS
6,750 bbl
- CLOSS-RULAND UNIT
6,539 bbl
- FLOWERS REISTINO 108 UNIT
6,228 bbl
- KUBIN-POPE UNIT
5,883 bbl
- PAPA JOE SCASTA UNIT 1
6,083 bbl
- LIGHTSEY-CAPPS UNIT
5,487 bbl
Aguila Vado (Eagleford) field
- HINES
7,456 bbl
- RASCO B
7,028 bbl
- CROOK
6,927 bbl
- HEDGE HOG
6,746 bbl
- RASCO A
6,384 bbl
- SCHOPPE C
6,724 bbl
- TORTUGA
6,984 bbl
- WOLVERINE
6,989 bbl
- JOHN MALAZZO B
6,424 bbl
- RFI B
6,242 bbl
Leases within 10 km
- DUNN 'B' UNIT
4,382 bbl · 0.7 km
- PERSIMMON CREEK 'D'
4,405 bbl · 1.2 km
- WILSON-DUNN UNIT
1,148 bbl · 1.4 km
- HEDGE HOG
6,746 bbl · 1.5 km
- HAWK UNIT
6,530 bbl · 1.8 km
- SCASTA UNIT
0 bbl · 2 km
- DUNN, J. B.
11 bbl · 2 km
- SCAMARDO UNIT
2,877 bbl · 2.1 km
- SCASTA UNIT
0 bbl · 2.1 km
- PERSIMMON CREEK "E"
4,623 bbl · 2.3 km
Drilling permits within 10 km
HADRIAN UNIT #1H
new drill · horizontal · Bull Run Resources, LLC · Robertson County · 4.1 km
Permit 0915020 · Apr 23, 2026
ECLIPSE #1HE
new drill · horizontal · Wildfire Energy Operating LLC · Robertson County · 9.7 km
Permit 0904560 · Dec 11, 2024
ASTEROID #1HE
new drill · horizontal · Wildfire Energy Operating LLC · Robertson County · 9.7 km
Permit 0904232 · Nov 25, 2024
GREAT BALLS OF FIRE #1ST
recompletion · horizontal · BBL Operating Company LLC · Robertson County · 7.7 km
Permit 0902122 · Aug 22, 2024