Texas oil leaseRRC 7B-12111Producing
Freeman, A.
One well in Stephens County. The lease produced 78 barrels of oil in the last 12 months, through August 2026.
- Operator
- Itx Corporation
- County
- Stephens
- Field
- Veale (Marble Falls)
- On record since
- September 2023
- Newest report on file
- August 2026
- Wells
- 1
The story, from 36 monthly reports
2023 to 2026: it sold the most in 2023
November 2023: the first month the lease sold oil on record, 180 barrels.
August 2026 is the newest monthly production report on file.
SourceRailroad Commission production reports, September 2023 through August 2026. Not a forecast, not reserves.
36 months against 7 other recordsNew
Every month since September 2023, and what else happened that month
The lease is the line on top. Under it, on the same clock: the weather, the State, the price, the wells next door, who ran the lease, who bought from it and the rest of the field. Move across it.
Oil averaged $83.90 a barrel · Itx Corporation
- Nothing else on record this month.
Move the pointer or drag across the chart.
Monthly oil sold from this lease since September 2023, with eight record tracks beneath it. Use the left and right arrow keys to move month by month.. 36 months from September 2023 to August 2026. The most in one month: 180 barrels, November 2023. The newest month: 0 barrels. 34 months with nothing reported.
No numbered drop comparison is on file here.
Some comparison records were unavailable when this page was read.
SourcesProduction, cut-offs, operators and buyers: Railroad Commission of Texas. Weather: NOAA. Prices: U.S. Energy Information Administration. Fracs: FracFocus. A record in the same month is not proof of a cause. Through August 2026.
Royalty Watch tells you the month a drop starts, with the records from that month.Watch this lease
One line per month
No silent months since September 2023
months with a report on file showing no oil and no gas.
months with oil or gas produced.
months in view.
SourcesRailroad Commission production reports, through August 2026.
Royalty Watch follows the months when production goes quiet.Watch this lease
34 years of state records, 1993 to 2026
Sold since January 1993
$2.09million
Only filed sales with a published price are included. Some sales figures or prices are unavailable.
- Oil sold
- 16,242barrels
- Gas sold
- 414,288thousand cubic feet
| Year | Oil, dollars | Gas, dollars | Total |
|---|---|---|---|
| 1993 | $21,400 | $86,100 | $107,000 |
| 1994 | $19,200 | $76,600 | $95,800 |
| 1995 | $20,800 | $61,100 | $81,900 |
| 1996 | $20,900 | $80,900 | $102,000 |
| 1997 | $21,000 | $60,200 in priced filings | $81,100 in priced filings |
| 1998 | $11,000 | $49,700 | $60,700 |
| 1999 | $16,900 | $56,600 | $73,500 |
| 2000 | $26,500 | $94,500 | $121,000 |
| 2001 | $18,600 | $73,100 | $91,700 |
| 2002 | $19,600 | $64,800 | $84,400 |
| 2003 | $16,300 | $95,100 | $111,000 |
| 2004 | $26,000 | $94,300 | $120,000 |
| 2005 | $30,600 | $139,000 | $170,000 |
| 2006 | $36,100 | $78,000 | $114,000 |
| 2007 | $43,500 | $81,500 | $125,000 |
| 2008 | $32,300 | $80,700 | $113,000 |
| 2009 | $13,600 | $26,700 in priced filings | $40,300 in priced filings |
| 2010 | $29,800 | $30,100 | $59,900 |
| 2011 | $17,400 | $23,300 | $40,700 |
| 2012 | $33,400 | $12,200 | $45,600 |
| 2013 | $18,800 | $17,300 | $36,100 |
| 2014 | $18,500 | $20,500 | $39,100 |
| 2015 | $7,420 | $6,920 | $14,300 |
| 2016 | $6,390 | $7,600 | $14,000 |
| 2017 | $8,680 | $4,050 | $12,700 |
| 2018 | $20,200 | $4,050 | $24,200 |
| 2019 | $9,570 | $2,230 | $11,800 |
| 2020 | $12,700 | $1,380 | $14,100 |
| 2021 | $10,000 | $542 | $10,600 |
| 2022 | $33,000 | $349 | $33,300 |
| 2023 | $25,100 | $124 | $25,200 |
| 2024 | $0 | $26 | $26 |
| 2025 | $11,200 | $42 | $11,200 |
| 2026, 2026 so far | $0 | $26 | $26 |
Did a relative own a share of this lease?
SourcesRailroad Commission Production Data Query, every monthly report since January 1993. EIA monthly WTI and Henry Hub prices (before 1997, EIA's Texas wellhead gas price). 2026 is part of a year, drawn lighter. Not a forecast, not reserves.
The newest well, seen from the side
Current well stages unavailable. Well 1 was completed in July 1973.
- Permit filedNot on file
- Drilling startedNot on file
- FrackedNot on file
- Completion filedJuly 9, 1973
- First production on the leaseNot on file
- First checkNot on file
SourcesRailroad Commission drilling permits and well records, and the FracFocus registry. Source date unavailable.
Royalty Watch follows new well permits and completions on this lease.Watch this lease
Wells on this lease and around it
The nearby well map is unavailable. The locator shows Stephens County.
From the State's well records
One well on this lease
| Well | API number | Completed | Depthfeet | Today |
|---|---|---|---|---|
| 1 | 42-429-30291 | July 1973 | 4,100 | Active |
SourceRailroad Commission wellbore and completion records.
Gas · last sale month, August 2026 New
Four prices for the same gas
Last sale August 2026. Henry Hub $2.78 in August 2026, the last sale month.
Texas Comptroller
Lower tax on record?
The tax approval record is unavailable for this lease.
Estimate your royalty
Type the decimal from your division order
The starting decimal is an example. Nothing you type here leaves this page.
$0.01a month
At these prices the whole lease’s reported sales were about $40 over 12 reported months. Your estimated share is $0.16 before taxes and deductions.
Monthly owner volumes and values
| Month | Oil (bbl) | Oil value | Gas (mcf) | Gas value | Total |
|---|---|---|---|---|---|
| August 2026 | 0 | $0.00 | 0.0039 | $0.01 | $0.01 |
| July 2026 | 0 | $0.00 | 0.0039 | $0.01 | $0.01 |
| June 2026 | 0 | $0.00 | 0.0039 | $0.01 | $0.01 |
| May 2026 | 0 | $0.00 | 0.0039 | $0.01 | $0.01 |
| April 2026 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| March 2026 | 0 | $0.00 | 0.0039 | $0.01 | $0.01 |
| February 2026 | 0 | $0.00 | 0.0039 | $0.01 | $0.01 |
| January 2026 | 0 | $0.00 | 0.0039 | $0.03 | $0.03 |
| December 2025 | 0 | $0.00 | 0.0039 | $0.02 | $0.02 |
| November 2025 | 0 | $0.00 | 0.0039 | $0.01 | $0.01 |
| October 2025 | 0 | $0.00 | 0.0039 | $0.01 | $0.01 |
| September 2025 | 0 | $0.00 | 0.0039 | $0.01 | $0.01 |
SourcesRailroad Commission monthly production, EIA Henry Hub, SEC filings and Texas Comptroller records.
Watch Plus sets public prices beside the price on your statement.See Watch Plus
The State’s Form P-4
Who takes the oil and gas
The Form P-4 purchaser records could not be confirmed. A shared owner cannot be checked without the other party.
SourcesRailroad Commission Form P-4.
Royalty Watch follows changes to the buyer and gatherer on record.Watch this lease
Seen from space
Heat at the pad, beside reported gas use
Satellite match
Satellite record unavailable
Satellite coverage for this pad could not be confirmed.
nights of heat
months reporting flared or vented gas among 12 filed months, September 2025 to August 2026
months with heat and none reported
SourcesNOAA VIIRS night readings and Railroad Commission gas disposition reports.
Watch Plus checks statement months beside the satellite record.See Watch Plus
Where the gas went, month by month
Since May 2026 the lease's gas goes to a processing plant instead of lease fuel
Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.
- Processing plant (3)92% · 11 mcf
- Lease fuel (1)8.3% · 1 mcf
SourcesRailroad Commission production reports, gas disposition by code, September 2023 to August 2026.
The county appraisal roll
Roll match unavailable
County mineral roll
Roll match unavailable
The county roll could not be confirmed for this lease.
Source County appraisal district mineral rolls.
From the state record
What owners ask about Freeman, A.
- 01When is the check for August 2026 due?
- Aug 31sale month endsNov 29gas due
- August 2026 is the newest month the state has posted for this lease. Texas law gives the payor until 60 days after the end of the sale month for oil and 90 for gas: the gas by Nov 29, 2026, unless the lease sets another time.
- Source: Railroad Commission production reports; Texas Natural Resources Code §91.402.
- See your next three checks
- 02How many 1099s should an owner expect for 2025?
- 1January to December 2025: one operator of record in all 12 months
- One company, Itx Corporation, filed this lease's reports behind every 2025 check, so most owners get one form. The operator is not always the company that pays, so go by the name on the stubs.
- Source: Railroad Commission production reports, operator of record by month.
- Check your 1099 against it
Every monthly report the State holds
36 months, newest first
| Month | Oil soldbarrels | Gas soldthousand cubic feet | Flared or ventedthousand cubic feet | Sold forat public prices |
|---|---|---|---|---|
| AugustAug 2026 | 0 | 1 | 0 | $2.78 |
| JulyJul 2026 | 0 | 1 | 0 | $2.89 |
| JuneJun 2026 | 0 | 1 | 0 | $3.15 |
| MayMay 2026 | 0 | 1 | 0 | $2.94 |
| AprilApr 2026 | No oil or gas reported | |||
| MarchMar 2026 | 0 | 1 | 0 | $3.04 |
| FebruaryFeb 2026 | 0 | 1 | 0 | $3.62 |
| JanuaryJan 2026 | 0 | 1 | 0 | $7.72 |
| DecemberDec 2025 | 0 | 1 | 0 | $4.26 |
| NovemberNov 2025 | 0 | 1 | 0 | $3.79 |
| OctoberOct 2025 | 0 | 1 | 0 | $3.19 |
| SeptemberSep 2025 | 0 | 1 | 0 | $2.97 |
| AugustAug 2025 | 0 | 1 | 0 | $2.91 |
| JulyJul 2025 | 0 | 1 | 0 | $3.20 |
| JuneJun 2025 | 164 | 1 | 0 | $11,200 |
| MayMay 2025 | 0 | 1 | 0 | $3.12 |
| AprilApr 2025 | 0 | 1 | 0 | $3.42 |
| MarchMar 2025 | 0 | 1 | 0 | $4.12 |
SourcesTexas Railroad Commission Production Data Query, through August 2026. Prices: EIA.
Likely owed Jan 2025
A whole month was never paid
The state shows 28,175 bbl of oil sold from this lease in January 2025, so your share is 27.51 bbl. No statement covers January 2025. That is the month the operator changed from Endeavor Energy Resources to Diamondback.
Ask Diamondback owner relations: is January 2025 being held in suspense after the change of operator?
$2,277oil + gas
A sample finding, from our example check. The full example found $3,328 likely owed.
Around this lease
Nearby
Itx Corporation in Stephens County
- Yandell, M.4,205 mcf last 12 months
- Veale,a.s. "C"2,036 mcf last 12 months
- Veale, A. S. "C"933 mcf last 12 months
- Dunlap, J G845 mcf last 12 months
- MM Terry Ranch LTD825 mcf last 12 months
- Veale, A. S., -C-610 mcf last 12 months
- Veale, A.s. "C"94 mcf last 12 months
- Veale, A.s. "C"181 mcf last 12 months
- Walker, G. B.38 mcf last 12 months
- Freeman12 mcf last 12 months
Veale (Marble Falls) field
- Dunlap, J.g.536 bbl last 12 months
- Veale,a.s. "C"7,919 mcf last 12 months
- Yandell, M.4,205 mcf last 12 months
- Veale,a.s. "C"2,036 mcf last 12 months
- Veale Parks "1405"3,511 mcf last 12 months
- Veale, A. S. "C"933 mcf last 12 months
- MM Terry Ranch LTD825 mcf last 12 months
- Veale, A.s. "C"94 mcf last 12 months
- Veale, A.s. "C"181 mcf last 12 months
- Walker, G. B.38 mcf last 12 months
Leases within 10 km
- Freeman12 mcf last 12 months · 0.4 km
- Dunlap, J G845 mcf last 12 months · 0.6 km
- Yandell, M.4,205 mcf last 12 months · 0.8 km
- Dunlap, J.g.536 bbl last 12 months · 0.9 km
- Veale-Parks (Caddo) Unit7,588 bbl last 12 months · 0.9 km
- Swenson, Clara J.no production in the last 12 months · 1 km
- Kight,judith Winston "C"2,868 mcf last 12 months · 1.2 km
- Kight, Judith Winston "D"162 bbl last 12 months · 1.3 km
- Swenson -A-no production in the last 12 months · 1.5 km
- Judith Winston Kight "D"no production in the last 12 months · 1.5 km
Where it sits
This county
Where this page comes from
- Railroad Commission of Texas production, permits, wells
- U.S. Energy Information Administration prices