Texas oil leaseRRC 10-08915Last oil or gas reported Oct 2023
G. H. Saunders
Six wells on 68 acres in Gray County. The lease produced 6 barrels of oil in its last 12 months on record, through January 2024. No report after January 2024 is on file; the State's newest month is September 2026.
- Last operator
- CLR Secondary Recovery, LLC
- County
- Gray
- On record since
- February 2014
- Newest report on file
- January 2024
- Unit on the newest permit
- 68 acres
Outline: the original land surveys this lease's wells sit in. The State publishes no lease outlines. RRC surveys, 2026-09-29.
What the checks found on this lease
- Reports stopped. This lease no longer reports to the State. The part below says since when, and what to ask.
- 31 silent months. November 2023 to May 2026.
- New operator, November 2023. CLR Secondary Recovery, LLC took over from Vision Stone Petroleum, LLC. A change of operator is when payments most often stop or go into suspense.
Checked, nothing found: buyers and new wells.
Not on file here, or only in part: drops, price and tax and heat from space.
Royalty Watch tells you the month any of this changes on your own lease: a silent month, a drop, a new buyer or a well's next stage.Watch this lease
No oil or gas reported in the 12 months through September 2026
Oil or gas was last reported for October 2023
Its whole life in the Railroad Commission's monthly reports, which start in January 1993; it first reported in October 2013. Royalty owners and their heirs can still be on the county roll after the checks stop.
- October 2013First report
- 2014The year it sold the most
- CLR Secondary Recovery, LLCLast operator, from November 2023
- October 2023Last production
- 31 monthsNo oil or gas reported, November 2023 to May 2026
barrels of oil sold since October 2013.
thousand cubic feet of gas sold since October 2013.
what it all sold for at each month's public prices, 100% of the lease.
SourceRailroad Commission production reports since January 1993 (oil and gas sold); EIA prices, through September 2026.
The story, from 120 monthly reports
On record since February 2014
February 2014: the first month the lease sold oil on record, 183 barrels.
August 2015 to February 2022: 79 months in a row with no oil and no gas reported.
August 2019: Vision Stone Petroleum, LLC took over.
November 2023: CLR Secondary Recovery, LLC took over from Vision Stone Petroleum, LLC.
January 2024 is the newest monthly production report on file.
SourceRailroad Commission production reports, February 2014 through January 2024. Not a forecast, not reserves.
Checks stopped on this lease?
The current operator's P-5 registration is listed as delinquent (last P-5 filed Jul 12, 2023).
SourceRailroad Commission production, P-5 and P-4 records, data through September 2026.See why checks stop on this lease
120 months against 7 other recordsNew
Every month since February 2014, and what else happened that month
The lease is the line on top. Under it, on the same clock: the weather, the State, the price, the wells next door, who ran the lease, who bought from it and the rest of the field. Move across it.
Oil averaged $74.15 a barrel · CLR Secondary Recovery, LLC
- WeatherWinter weather, January 8. Nine days below 20°F in Gray County.
Move the pointer or drag across the chart.
Monthly oil sold from this lease since February 2014, with eight record tracks beneath it. Use the left and right arrow keys to move month by month.. 120 months from February 2014 to January 2024. The most in one month: 186 barrels, November 2014. The newest month: 0 barrels. 114 months with nothing reported.
No numbered drop comparison is on file here.
SourcesProduction, cut-offs, operators and buyers: Railroad Commission of Texas. Weather: NOAA. Prices: U.S. Energy Information Administration. Fracs: FracFocus. A record in the same month is not proof of a cause. Through January 2024.
152 months, one line eachNew
No production was reported from November 2023 through May 2026
A gap is a month with no oil and no gas reported. Many leases end after 60 to 90 days without production unless the lease says otherwise.
months in a row with nothing reported, from November 2023 through May 2026. Of the 31 months, 3 with a report on file showing no oil and no gas and 28 with no report on file.
thousand cubic feet of gas on the newest report on file with oil or gas, for October 2023. The 3 reports on file after it, the newest for January 2024, show no oil and no gas. No report after January 2024 is on file; the State's newest month is September 2026.
of 152 months with oil or gas reported since October 2013.
A shut-in payment or work on the wells can keep a lease alive through a gap. Your own lease paper decides.
SourceRailroad Commission production reports, October 2013 through May 2026. The newest months, after May 2026, are left out of the count because reports arrive late.
11 years of state records, 2014 to 2024
Sold since February 2014
$113,000
Only filed sales with a published price are included. Some sales figures or prices are unavailable.
- Oil sold
- 1,011barrels
- Gas sold
- 5,795thousand cubic feet
| Year | Oil, dollars | Gas, dollars | Total |
|---|---|---|---|
| 2014 | $87,500 | $8,470 in priced filings | $96,000 in priced filings |
| 2015 | $0 | $5,620 in priced filings | $5,620 in priced filings |
| 2016 | $0 | Unavailable | Unavailable |
| 2017 | $0 | Unavailable | Unavailable |
| 2018 | $0 | Unavailable | Unavailable |
| 2019 | $5,700 | Unavailable | $5,700 in priced filings |
| 2020 | $0 | $0 | $0 |
| 2021 | $0 | $0 | $0 |
| 2022 | $0 | $1,720 | $1,720 |
| 2023 | $0 | $3,560 | $3,560 |
| 2024, 2024 so far | $0 | $0 | $0 |
Did a relative own a share of this lease?
SourcesRailroad Commission Production Data Query, every monthly report since February 2014. EIA monthly WTI and Henry Hub prices. 2024 is part of a year, drawn lighter. Not a forecast, not reserves.
Who has run this lease
The operator changed three times, most recently in November 2023
The company named on each monthly report to the State. The operator is not always the company that pays.
- CLR Secondary Recovery, LLCNovember 2023 to January 2024
- Vision Stone Petroleum, LLCAugust 2019 to October 2023
- Operator number 76743August 2018 to July 2019
- Operator number 638492February 2014 to July 2018
A new operator sets up every owner again before it pays, and often sends a new division order. See what you may sign
SourcesRailroad Commission production reports, the operator on each month’s report, February 2014 through January 2024.
The newest well, seen from the side
No well on the way. Well 6 was completed in December 2013.
- Permit filedNot on file
- Drilling startedNot on file
- FrackedNot on file
- Completion filedDecember 20, 2013
- First production on the leaseNot on file
- First checkNot on file
SourcesRailroad Commission drilling permits and well records, and the FracFocus registry. Lease record built November 18, 2026.
About 7 miles across
Wells on this lease and around it
For a lawyer, a buyer or a probate file. Wells and permits within about 2 miles. Railroad Commission of Texas, FracFocus and USGS imagery.
From the State's well records
Six wells on this lease
| Well | API number | Completed | Depthfeet | Today |
|---|---|---|---|---|
| 2 | 42-179-32608 | October 2013 | 3,471 | Shut in |
| 3 | 42-179-32609 | October 2013 | 3,753 | Shut in |
| 4 | 42-179-32610 | November 2013 | 4,141 | Shut in |
| 5 | 42-179-32611 | December 2013 | 3,545 | Shut in |
| 6 | 42-179-32612 | December 2013 | 3,372 | Shut in |
| 7 | 42-179-32613 | December 2013 | 3,370 | Shut in |
SourceRailroad Commission wellbore and completion records.
What the drilling permits say
68acres on the newest permit
- 68 acres, on the 2013 permits
Gas · last sale month, October 2023 New
Four prices for the same gas
Last sale October 2023. Henry Hub $2.98 in October 2023, the last sale month.
Texas Comptroller
Lower tax on record?
No lower tax approval appears on the Comptroller’s list for this lease.
EIA record dated October 1, 2026Estimate your royalty
Type the decimal from your division order
The starting decimal is an example. Nothing you type here leaves this page.
$0.98a month
At these prices the whole lease’s reported sales were about $3,010 over 12 reported months. Your estimated share is $12 before taxes and deductions.
Monthly owner volumes and values
| Month | Oil (bbl) | Oil value | Gas (mcf) | Gas value | Total |
|---|---|---|---|---|---|
| January 2024 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| December 2023 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| November 2023 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| October 2023 | 0 | $0.00 | 1.2695 | $3.78 | $3.78 |
| September 2023 | 0 | $0.00 | 1.0938 | $2.89 | $2.89 |
| August 2023 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| July 2023 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| June 2023 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| May 2023 | 0 | $0.00 | 0.3047 | $0.66 | $0.66 |
| April 2023 | 0 | $0.00 | 0.6836 | $1.48 | $1.48 |
| March 2023 | 0 | $0.00 | 0.7188 | $1.66 | $1.66 |
| February 2023 | 0 | $0.00 | 0.5508 | $1.31 | $1.31 |
SourcesRailroad Commission monthly production, EIA Henry Hub, SEC filings and Texas Comptroller records.
Watch Plus sets public prices beside the price on your statement.See Watch Plus
Who takes the oil and gasNew
No buyer shares an owner with the operator
The State lists who gathers and who buys from each lease. Company filings list who owns whom. Here they are on one drawing.
No shared owner, officer or address on record between the oil buyers and the operator.
No shared owner, officer or address on record between the gas buyers and the operator.
Earlier buyers and gatherers, back to 1993
| Company | Product | Role | From | Until |
|---|---|---|---|---|
| ENERGY TRANSFER COMPANY | Gas | Gathers and buys | Nov 2015 | Mar 2022 |
| EASTEX CRUDE COMPANY | Oil | Gathers | Oct 2013 | Apr 2022 |
Who buys my oilOil price check
SourcesBuyers and gatherers: Railroad Commission Form P-4 records, as of October 24, 2026. Ownership: U.S. Securities and Exchange Commission filings.
Seen from space
Heat at the pad, beside reported gas use
Satellite match
Not matched
The lease’s newest month on record, January 2024, is before the satellites’ record begins in February 2024.
nights of heat
months with reported flaring (disposition records unavailable)
months with heat and none reported
SourcesNOAA VIIRS night readings and Railroad Commission gas disposition reports. Satellite record through November 17, 2026.
Watch Plus checks statement months beside the satellite record.See Watch Plus
Where the gas went, month by month
Since Jan 2023 the lease's gas goes to a transmission line instead of lease fuel
Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.
- Transmission line (2)92% · 1,600 mcf
- Lease fuel (1)8.0% · 140 mcf
SourcesRailroad Commission production reports, gas disposition by code, May 2022 to October 2023.
The county appraisal roll
Roll not on file
County mineral roll
Roll not on file
Gray Appraisal District’s mineral roll has not been read here yet.
Royalty Clerk has mineral rolls for 166 Texas counties.
Source County appraisal district mineral rolls.
From the state record
Ask a question about G. H. Saunders
The available public records have no additional lease-specific answers as of November 28, 2026.
Every monthly report the State holds
120 months, newest first
| Month | Oil soldbarrels | Gas soldthousand cubic feet | Flared or ventedthousand cubic feet | Sold forat public prices | Operator |
|---|---|---|---|---|---|
| JanuaryJan 2024 | No oil or gas reported | CLR Secondary Recovery, LLC | |||
| DecemberDec 2023 | No oil or gas reported | CLR Secondary Recovery, LLC | |||
| NovemberNov 2023 | No oil or gas reported | CLR Secondary Recovery, LLC | |||
| OctoberOct 2023 | 0 | 325 | 0 | $969 | Vision Stone Petroleum, LLC |
| SeptemberSep 2023 | 0 | 280 | 0 | $739 | Vision Stone Petroleum, LLC |
| AugustAug 2023 | No oil or gas reported | Vision Stone Petroleum, LLC | |||
| JulyJul 2023 | No oil or gas reported | Vision Stone Petroleum, LLC | |||
| JuneJun 2023 | No oil or gas reported | Vision Stone Petroleum, LLC | |||
| MayMay 2023 | 0 | 78 | 0 | $168 | Vision Stone Petroleum, LLC |
| AprilApr 2023 | 0 | 175 | 0 | $378 | Vision Stone Petroleum, LLC |
| MarchMar 2023 | 0 | 184 | 0 | $425 | Vision Stone Petroleum, LLC |
| FebruaryFeb 2023 | 0 | 141 | 0 | $336 | Vision Stone Petroleum, LLC |
| JanuaryJan 2023 | 0 | 167 | 0 | $546 | Vision Stone Petroleum, LLC |
| DecemberDec 2022 | No oil or gas reported | Vision Stone Petroleum, LLC | |||
| NovemberNov 2022 | 0 | 8 | 0 | $44 | Vision Stone Petroleum, LLC |
| OctoberOct 2022 | 0 | 111 | 0 | $628 | Vision Stone Petroleum, LLC |
| SeptemberSep 2022 | 0 | 67 | 0 | $528 | Vision Stone Petroleum, LLC |
| AugustAug 2022 | No oil or gas reported | Vision Stone Petroleum, LLC | |||
SourcesTexas Railroad Commission Production Data Query, through January 2024. Prices: EIA.
Example
A whole month was never paid
The State shows 28,175 barrels of oil sold from the lease in the month its operator changed from Operator A to Operator B, so the owner's share is 27.51 barrels. No statement covers that month.
Ask Operator B's owner relations: is that month held in suspense after the change of operator?
$2,277oil and gas
A sample finding, from our example check.
Around this lease
Nearby
Panhandle Gray County Field field
- Arnold68 bbl last 12 months
- Sin-Harrah66 bbl last 12 months
- Frashier, O. N.64 bbl last 12 months
- Carpenter, Jim60 bbl last 12 months
- McKay -A-60 bbl last 12 months
- Jackson, Emma, Cons.55 bbl last 12 months
- Hayden53 bbl last 12 months
- Culler47 bbl last 12 months
- Barrett47 bbl last 12 months
- Binkley, O. E.12 bbl last 12 months
Leases within 10 km
- Saunders623 mcf last 12 months · 0.4 km
- Saunders NCT-2no production in the last 12 months · 0.7 km
- Saunders, G. H.5,126 bbl last 12 months · 0.8 km
- Saunders NCT-3no production in the last 12 months · 0.8 km
- Saunders, G. H. Trust No. 5121 bbl last 12 months · 0.9 km
- Saunders NCT-2no production in the last 12 months · 0.9 km
- Lincoln-Saundersno production in the last 12 months · 1 km
- Saunders, G. C. & H. E.102 bbl last 12 months · 1.2 km
- Harrahno production in the last 12 months · 1.2 km
- Saunders NCT-2no production in the last 12 months · 1.3 km
Drilling permits within 10 km
- PARKER FEE -A- #2Arecompletion · O.g.p. Operating, Inc. · Apr 11, 2025 · 9.5 km
Where it sits
This county
Where this page comes from
- Railroad Commission of Texas production, Form P-4, permits, wells
- U.S. Energy Information Administration prices
- NOAA storms and cold
- U.S. Geological Survey photos
How this page is made
Our software builds this page from the public records above. Every figure on it is computed from them, and the page is rebuilt when a source publishes a new month or a new roll. Where the page has a written summary, our software writes it from the page's own figures, and it is checked against them before it goes up. Royalty Clerk is run by AGI Solutions LLC; no operator pays for a page or sees one first.