Texas gas wellRRC 04-276355Producing
Gates 05D
One well on 12,618 acres in Webb County. The lease produced 54,935 thousand cubic feet of gas in the last 12 months, through September 2026.
- Operator
- Rosetta Resources Operating LP
- County
- Webb
- On record since
- November 2014
- Newest report on file
- September 2026
- Unit on the newest permit
- 12,618 acres
Outline: the original land surveys this lease's wells sit in. The State publishes no lease outlines. RRC surveys, 2026-09-29.
What the checks found on this lease
- 2 silent months. September to October 2019.
Checked, nothing found: drops, operator changes, buyers, price and tax, heat from space and new wells.
Royalty Watch tells you the month any of this changes on your own lease: a silent month, a drop, a new buyer or a well's next stage.Watch this lease
The story, from 143 monthly reports
On record since November 2014
November 2014: the first month the lease sold gas on record, 109,791 thousand cubic feet.
September 2019 to October 2019: two months in a row with no oil and no gas reported.
September 2026 is the newest monthly production report on file.
SourceRailroad Commission production reports, November 2014 through September 2026. Not a forecast, not reserves.
143 months against 7 other recordsNew
Every month since November 2014, and what else happened that month
The lease is the line on top. Under it, on the same clock: the weather, the State, the price, the wells next door, who ran the lease, who bought from it and the rest of the field. Move across it.
Gas averaged $3.79 an mcf · Rosetta Resources Operating LP
- Next doorA well 0.3 miles away on another lease was fracked September 15 to October 9, 2025. Two wells within 1 km of this lease's wells were fracked that month or the month before.
Move the pointer or drag across the chart. The numbered buttons jump to each drop.
Monthly gas sold from this lease since November 2014, with eight record tracks beneath it. Use the left and right arrow keys to move month by month.. 143 months from November 2014 to September 2026. The most in one month: 221,307 mcf, December 2014. The newest month: 5,063 mcf. 5 months with nothing reported. Moments marked: 1, May 2015; 2, Oct 2025; 3, Nov 2025.
SourcesProduction, cut-offs, operators and buyers: Railroad Commission of Texas. Weather: NOAA. Prices: U.S. Energy Information Administration. Fracs: FracFocus. A record in the same month is not proof of a cause. Through September 2026.
139 months, one line eachNew
Two months of silence in 2019
A gap is a month with no oil and no gas reported. Many leases end after 60 to 90 days without production unless the lease says otherwise.
months in a row with nothing reported, September to October 2019. Of the 2 months, 1 with a report on file showing no oil and no gas and 1 with a report on file showing a sale and nothing produced. The longest silence on record here.
thousand cubic feet of gas and 262 barrels of oil on the newest report on file with oil or gas, for September 2026, the State's newest month.
of 139 months with oil or gas reported since November 2014.
thousand cubic feet of gas a day on average from September 2025 through August 2026, counting a month with no report on file as zero.
A shut-in payment or work on the wells can keep a lease alive through a gap. Your own lease paper decides.
SourceRailroad Commission production reports, November 2014 through May 2026. The newest months, after May 2026, are left out of the count because reports arrive late.
13 years of state records, 2014 to 2026
Sold since November 2014
$24.5million
Only filed sales with a published price are included. Some sales figures or prices are unavailable.
- Oil sold
- 191,444barrels
- Gas sold
- 4,696,825thousand cubic feet
| Year | Oil, dollars | Gas, dollars | Total |
|---|---|---|---|
| 2014 | $1.36 million | $1.22 million | $2.59 million |
| 2015 | $3.22 million | $3.28 million in priced filings | $6.5 million in priced filings |
| 2016 | $1.1 million | $1.65 million | $2.75 million |
| 2017 | $753,000 | $1.65 million | $2.41 million |
| 2018 | $730,000 | $1.42 million | $2.15 million |
| 2019 | $753,000 | $794,000 in priced filings | $1.55 million in priced filings |
| 2020 | $232,000 | $707,000 | $939,000 |
| 2021 | $362,000 | $819,000 | $1.18 million |
| 2022 | $685,000 | $1.02 million | $1.7 million |
| 2023 | $556,000 | $415,000 | $971,000 |
| 2024 | $462,000 | $303,000 | $766,000 |
| 2025 | $298,000 | $329,000 | $628,000 |
| 2026, 2026 so far | $238,000 | $175,000 | $413,000 |
Did a relative own a share of this lease?
SourcesRailroad Commission Production Data Query, every monthly report since November 2014. EIA monthly WTI and Henry Hub prices. 2026 is part of a year, drawn lighter. Not a forecast, not reserves.
The newest well, seen from the side
No well on the way. Well 2019 was completed in November 2014.
- Permit filedNot on file
- Drilling startedNot on file
- FrackedNot on file
- Completion filedNovember 14, 2014
- First production on the leaseNot on file
- First checkNot on file
SourcesRailroad Commission drilling permits and well records, and the FracFocus registry. Lease record built November 17, 2026.
About 6 miles across
Wells on this lease and around it
For a lawyer, a buyer or a probate file. Wells and permits within about 2 miles. Railroad Commission of Texas, FracFocus and USGS imagery.
From the State's well records
One well on this lease
| Well | API number | Completed | Sidewaysfeet | Depthfeet | Today |
|---|---|---|---|---|---|
| 2019 | 42-479-42653 | November 2014 | 7,720 | 8,539 | Active |
SourceRailroad Commission wellbore and completion records.
What the drilling permits say
12,618acres on the newest permit
- 12,618 acres, on the 2014 permits
Gas, August 2026, dollars per thousand cubic feet New
Four prices for the same gas
What the market paid, what the operator told its investors, what it told the tax office for this lease, and the one only you hold.
No lower tax approval on file
- Usual gas rate
- 7.50%
- Usual oil rate
- 4.60%
No lower tax approval appears for this lease in the two years covered by the Comptroller’s list as of October 1, 2026.
Estimate your royalty
Type the decimal from your division order
The starting decimal is an example. Nothing you type here leaves this page.
$145a month
At these prices the whole lease’s reported sales were about $446,000 over 12 reported months. Your estimated share is $1,740 before taxes and deductions.
Monthly owner volumes and values
| Month | Oil (bbl) | Oil value | Gas (mcf) | Gas value | Total |
|---|---|---|---|---|---|
| September 2026 | 1.0234 | $99.59 | 19.7773 | $58.34 | $157.93 |
| August 2026 | 1.0859 | $91.11 | 20.8359 | $57.92 | $149.03 |
| July 2026 | 1.1406 | $91.77 | 21.4844 | $62.09 | $153.86 |
| June 2026 | 1.0898 | $92.43 | 20.8242 | $65.60 | $158.03 |
| May 2026 | 1.1523 | $117.69 | 18.9531 | $55.72 | $173.41 |
| April 2026 | 1.5195 | $152.44 | 21.1289 | $58.53 | $210.97 |
| March 2026 | 1.1797 | $107.80 | 21.2266 | $64.53 | $172.33 |
| February 2026 | 1.4375 | $92.73 | 18.9531 | $68.61 | $161.34 |
| January 2026 | 1.4063 | $84.43 | 24.7109 | $190.77 | $275.20 |
| December 2025 | 0.7031 | $40.76 | 6.4609 | $27.52 | $68.28 |
| November 2025 | 0.5703 | $34.25 | 6.0352 | $22.87 | $57.13 |
| October 2025 | 0.043 | $2.62 | 0.4258 | $1.36 | $3.97 |
SourcesMarket: U.S. Energy Information Administration (Henry Hub for gas, taken per thousand cubic feet; WTI Cushing for oil). Investors: no public parent's filing is on record for the operator. Tax office and tax approval: Texas Comptroller. The third price shows once the Comptroller's records for this lease have arrived. As of October 1, 2026.
Watch Plus sets these prices beside the price on each of your statements, every month.See Watch Plus
Who takes the oil and gasNew
No buyer shares an owner with the operator
The State lists who gathers and who buys from each lease. Company filings list who owns whom. Here they are on one drawing.
No shared owner, officer or address on record between the gas buyers and the operator.
No shared owner, officer or address on record between the oil buyers and the operator.
Earlier buyers and gatherers, back to 1993
| Company | Product | Role | From | Until |
|---|---|---|---|---|
| MLTM L.P. | Oil | Gathers | Jul 2019 | Jan 2023 |
| VITOL INC. | Oil | Gathers | Jul 2018 | Jan 2023 |
| TRAFIGURA TRADING LLC | Oil | Gathers | Jul 2018 | Jan 2023 |
| SHELL TRADING (US) COMPANY | Oil | Gathers | Jul 2018 | Jan 2023 |
| EASTEX CRUDE COMPANY | Oil | Gathers | Jul 2018 | Jan 2023 |
| PLAINS PIPELINE L.P. | Oil | Gathers | Nov 2014 | Jan 2023 |
| ENTERPRISE CRUDE OIL LLC | Oil | Gathers | Nov 2014 | Jan 2023 |
| ELTM, L.P. | Oil | Gathers | Nov 2014 | Jul 2019 |
| ROSETTA RESOURCES OPERATING LP | Gas | Buys | Nov 2014 | Jan 2023 |
Who buys my oilOil price check
SourcesBuyers and gatherers: Railroad Commission Form P-4 records, as of October 24, 2026. Ownership: U.S. Securities and Exchange Commission filings.
Seen from space, 2025New
No satellite heat at this pad in 2025
Weather satellites pass over Texas every night and record heat on the ground. Drag the photo from day to night. Beside it, each night of 2025 next to what the operator reported burning.
A lit dot is a night a satellite recorded heat within 500 m of a well on this lease. The red bar is gas reported vented or flared that month.
nights with heat recorded at this pad, 2025.
months in which flaring was reported.
months with heat seen and no flaring reported.
Where the gas went in 2025, as the operator reported it
SourcesHeat: NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data); the readings at this pad from NOAA-20, NOAA-21 and Suomi NPP, through November 23, 2026. Reported flaring and gas use: Railroad Commission production reports. Cloud hides heat, so the count of nights is a floor. The satellite records heat. It does not say what burned.
Watch Plus checks whether you were paid on gas in the months heat was seen.See Watch Plus
Where the gas went, month by month
94% of the gas went to a processing plant in the last 12 months
Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.
- Processing plant (3)94% · 51,409 mcf
- Lease fuel (1)6.4% · 3,526 mcf
SourcesRailroad Commission production reports, gas disposition by code, October 2023 to September 2026.
Webb County Appraisal District, 2026 mineral roll
53 royalty accounts on the county roll
- Owners
- 48
- Accounts
- 54
- Appraised in all
- $1.2M$1,205,060
Is one of these yours?
Each square is one account
- Royalty 53
- Working interest 1
SourceWebb County Appraisal District, 2026 mineral roll (source), read October 8, 2026. Accounts matched to this lease by RRC number or lease name.
From the state record
What owners ask about Gates 05D
- 01When is the check for September 2026 due?
- Sept 30sale month endsNov 29oil dueDec 29gas due
- September 2026 is the newest month the state has posted for this lease. Texas law gives the payor until 60 days after the end of the sale month for oil and 90 for gas: the oil by Nov 29, 2026 and the gas by Dec 29, 2026, unless the lease sets another time.
- Source: Railroad Commission production reports; Texas Natural Resources Code §91.402.
- See your next three checks
- 02Which Texas production tax rate applies?
- Gas7.50%Oil4.60%
- The Texas Comptroller lists no approved exemption or reduced rate for this lease for September 2026, so the full 4.6% on oil and 7.5% on gas applies.
- Source: Texas Comptroller, approved severance tax exemptions.
- Check the tax on your stub
- 03Who buys the oil and gas?
- CONDShell Trading (Us) Company100%GASNextera Energy Marketing, LLC100%
- Condensate: Shell Trading (Us) Company gathers it. Gas from gas wells: Nextera Energy Marketing, LLC buys it; Energy Transfer Company gathers it. The buyer's price is what a royalty check is figured on.
- Source: Railroad Commission Form P-4, gatherers and purchasers.
- See every buyer and past buyers
- 04How many 1099s should an owner expect for 2025?
- 1January to December 2025: one operator of record in all 12 months
- One company, Rosetta Resources Operating LP, filed this lease's reports behind every 2025 check, so most owners get one form. The operator is not always the company that pays, so go by the name on the stubs.
- Source: Railroad Commission production reports, operator of record by month.
- Check your 1099 against it
Every monthly report the State holds
143 months, newest first
| Month | Oil soldbarrels | Gas soldthousand cubic feet | Flared or ventedthousand cubic feet | Sold forat public prices |
|---|---|---|---|---|
| SeptemberSep 2026 | 262 | 5,063 | 0 | $40,400 |
| AugustAug 2026 | 278 | 5,334 | 0 | $38,200 |
| JulyJul 2026 | 292 | 5,500 | 0 | $39,400 |
| JuneJun 2026 | 279 | 5,331 | 0 | $40,500 |
| MayMay 2026 | 295 | 4,852 | 0 | $44,400 |
| AprilApr 2026 | 389 | 5,409 | 0 | $54,000 |
| MarchMar 2026 | 302 | 5,434 | 0 | $44,100 |
| FebruaryFeb 2026 | 368 | 4,852 | 0 | $41,300 |
| JanuaryJan 2026 | 360 | 6,326 | 0 | $70,500 |
| DecemberDec 2025 | 180 | 1,654 | 0 | $17,500 |
| NovemberNov 2025 | 146 | 1,545 | 0 | $14,600 |
| OctoberOct 2025 | 11 | 109 | 0 | $1,020 |
| SeptemberSep 2025 | 317 | 7,339 | 0 | $42,100 |
| AugustAug 2025 | 320 | 9,266 | 0 | $47,700 |
| JulyJul 2025 | 401 | 8,989 | 0 | $56,200 |
| JuneJun 2025 | 470 | 10,177 | 0 | $62,800 |
| MayMay 2025 | 506 | 10,574 | 0 | $64,400 |
| AprilApr 2025 | 495 | 10,953 | 0 | $68,900 |
SourcesTexas Railroad Commission Production Data Query, through September 2026. Prices: EIA.
Example
A whole month was never paid
The State shows 28,175 barrels of oil sold from the lease in the month its operator changed from Operator A to Operator B, so the owner's share is 27.51 barrels. No statement covers that month.
Ask Operator B's owner relations: is that month held in suspense after the change of operator?
$2,277oil and gas
A sample finding, from our example check.
Around this lease
Nearby
Rosetta Resources Operating LP in Webb County
- Gates 10 Rose A Unit A74,597 mcf last 12 months
- Gates 05D51,652 mcf last 12 months
- Gates 05D63,263 mcf last 12 months
- Gates 10 Rose A33,148 mcf last 12 months
- Gates 05-D60,579 mcf last 12 months
- Gates 09 Rose A BVP63,038 mcf last 12 months
- Gates 05D39,468 mcf last 12 months
- Gates 05-D87,868 mcf last 12 months
- Gates 09 Rose B Gu 976,655 mcf last 12 months
- Gates 10 Rose A58,873 mcf last 12 months
Gates Ranch (Eagle Ford Shale) field
- Gates 10 Rose A Unit A74,597 mcf last 12 months
- Gates 05D51,652 mcf last 12 months
- Gates 05D63,263 mcf last 12 months
- Gates 10 Rose A33,148 mcf last 12 months
- Gates 05-D60,579 mcf last 12 months
- Gates 09 Rose A BVP63,038 mcf last 12 months
- Gates 05D39,468 mcf last 12 months
- Gates 05-D87,868 mcf last 12 months
- Gates 09 Rose B Gu 976,655 mcf last 12 months
- Gates 10 Rose A58,873 mcf last 12 months
Leases within 10 km
- Gates 05D12,459 mcf last 12 months · 0 km
- Gates 05D41,558 mcf last 12 months · 0 km
- Gates 05D162,736 mcf last 12 months · 0 km
- Gates 05D Unit D208,939 mcf last 12 months · 0.1 km
- Gates 05D Unit C286,102 mcf last 12 months · 0.1 km
- Gates 05D Unit C293,097 mcf last 12 months · 0.1 km
- Gates 05D126,802 mcf last 12 months · 0.3 km
- Gates 05D36,045 mcf last 12 months · 0.3 km
- Gates 05D67,031 mcf last 12 months · 0.3 km
- Gates 09 Rose B16,118 mcf last 12 months · 0.4 km
Drilling permits within 10 km
- GATES 09 ROSE B JJ #2046Hnew drill · horizontal · Rosetta Resources Operating LP · Oct 20, 2026 · 1.9 km
- GATES 09 ROSE B KK #2047Hnew drill · horizontal · Rosetta Resources Operating LP · Oct 20, 2026 · 1.9 km
- GATES 09 ROSE B LL #2048Hnew drill · horizontal · Rosetta Resources Operating LP · Oct 20, 2026 · 1.9 km
- GATES 09 ROSE B MM #2049Hnew drill · horizontal · Rosetta Resources Operating LP · Oct 20, 2026 · 1.9 km
- LOMA BLANCA #201Hnew drill · horizontal · Fasken Oil and Ranch, Ltd. · Sept 17, 2026 · 5.6 km
Same name in district 04, 60 of 71
- Gates 05D195,112 mcf last 12 months
- Gates 05D239,668 mcf last 12 months
- Gates 05D159,934 mcf last 12 months
- Gates 05D270,553 mcf last 12 months
- Gates 05D171,243 mcf last 12 months
- Gates 05D131,894 mcf last 12 months
- Gates 05D231,717 mcf last 12 months
- Gates 05D224,351 mcf last 12 months
- Gates 05D149,325 mcf last 12 months
- Gates 05D159,542 mcf last 12 months
- Gates 05D155,807 mcf last 12 months
- Gates 05D151,630 mcf last 12 months
- Gates 05D126,802 mcf last 12 months
- Gates 05D140,704 mcf last 12 months
- Gates 05D102,279 mcf last 12 months
- Gates 05D122,211 mcf last 12 months
- Gates 05D162,736 mcf last 12 months
- Gates 05D151,325 mcf last 12 months
- Gates 05D106,309 mcf last 12 months
- Gates 05D130,142 mcf last 12 months
- Gates 05D95,732 mcf last 12 months
- Gates 05D119,870 mcf last 12 months
- Gates 05D117,339 mcf last 12 months
- Gates 05D71,427 mcf last 12 months
- Gates 05D61,713 mcf last 12 months
- Gates 05D84,201 mcf last 12 months
- Gates 05D67,031 mcf last 12 months
- Gates 05D102,203 mcf last 12 months
- Gates 05D53,704 mcf last 12 months
- Gates 05D100,116 mcf last 12 months
- Gates 05D55,059 mcf last 12 months
- Gates 05D78,616 mcf last 12 months
- Gates 05D61,144 mcf last 12 months
- Gates 05D60,217 mcf last 12 months
- Gates 05D35,315 mcf last 12 months
- Gates 05D52,395 mcf last 12 months
- Gates 05D51,652 mcf last 12 months
- Gates 05D63,263 mcf last 12 months
- Gates 05D39,468 mcf last 12 months
- Gates 05D30,349 mcf last 12 months
- Gates 05D27,260 mcf last 12 months
- Gates 05D32,644 mcf last 12 months
- Gates 05D69,556 mcf last 12 months
- Gates 05D42,494 mcf last 12 months
- Gates 05D24,818 mcf last 12 months
- Gates 05D42,166 mcf last 12 months
- Gates 05D29,627 mcf last 12 months
- Gates 05D41,825 mcf last 12 months
- Gates 05D33,309 mcf last 12 months
- Gates 05D36,567 mcf last 12 months
- Gates 05D41,558 mcf last 12 months
- Gates 05D25,818 mcf last 12 months
- Gates 05D35,193 mcf last 12 months
- Gates 05D20,145 mcf last 12 months
- Gates 05D36,045 mcf last 12 months
- Gates 05D28,579 mcf last 12 months
- Gates 05D20,249 mcf last 12 months
- Gates 05D24,214 mcf last 12 months
- Gates 05D31,017 mcf last 12 months
Sister leases, 12 of 19
- Gates 05D Unit255,848 mcf last 12 months
- Gates 05D Unit111,113 mcf last 12 months
- Gates 05D Unit81,920 mcf last 12 months
- Gates 05Sno production in the last 12 months
- Gates 05Sno production in the last 12 months
- Gates 05Sno production in the last 12 months
- Gates 05Sno production in the last 12 months
- Gates 05Sno production in the last 12 months
- Gates 05Sno production in the last 12 months
- Gates 05Sno production in the last 12 months
- Gates 05Sno production in the last 12 months
- Gates 05Sno production in the last 12 months
Where it sits
This county
Where this page comes from
- Railroad Commission of Texas production, Form P-4, permits, wells
- Texas Comptroller tax approvals, lease values
- U.S. Energy Information Administration prices
- FracFocus frac dates
- NOAA storms and cold
- NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data) night heat
- Webb County Appraisal District mineral roll
- U.S. Geological Survey photos
How this page is made
Our software builds this page from the public records above. Every figure on it is computed from them, and the page is rebuilt when a source publishes a new month or a new roll. Where the page has a written summary, our software writes it from the page's own figures, and it is checked against them before it goes up. Royalty Clerk is run by AGI Solutions LLC; no operator pays for a page or sees one first.