Skip to content

Texas oil lease · RRC district 08 · Lease 47670

Producing

GOODBAR 89

Goodbar 89 is an oil lease in Upton County, Texas, operated by Great American Resources Inc. in the McElroy field. The Railroad Commission shows 13,058 bbl of oil in the 12 months through Jul 2026.

Oil lease dossier · 4 wells

13,058bbl oil, last 12 months−9% vs prior year
Field
McElroy
RRC lease
08-47670

Own a share of this lease?

Is your check right?

Upload a check stub or a phone photo. We compare every month with the state numbers on this page.

Check my statement

Free. No account needed. Two to four pages.

Where it sits

This county

Upton CountyUptonMidlandCraneGlasscockReaganEctorUpton County
Upton County · RRC district 08Open Upton County →
Gas, last 12 months
5,645 mcf
Oil in Jul 2026
1,191 bbl
Reporting to the state
since Jan 2020
Wells
4

Production

Month by month, from the state record

What the Railroad Commission says this oil lease produced. Oil is in barrels (bbl). Gas is in thousand cubic feet (mcf).

Oil output fell 9% over the last 12 months

13,058 bbl in the 12 months through Jul 2026, against 14,272 bbl in the 12 months before.

  • Oil (bars, left axis)
  • Gas (line, right axis)
  • Last 12 months
Oil output fell 9% over the last 12 monthsMonthly oil production and gas for GOODBAR 89, Aug 2023 to Jul 2026. Oil output fell 9% over the last 12 months. 13,058 bbl in the 12 months through Jul 2026, against 14,272 bbl in the 12 months before.Last 12 months: 13,058 bblbbl per monthmcf per month005002501,0005001,5007502,0001,000Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output fell 9% over the last 12 monthsMonthly oil production and gas for GOODBAR 89, Aug 2023 to Jul 2026. Oil output fell 9% over the last 12 months. 13,058 bbl in the 12 months through Jul 2026, against 14,272 bbl in the 12 months before.Last 12 monthsbbl per monthmcf per month005002501,0005001,5007502,0001,000Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, oil lease 47670, district 08. Reported through Jul 2026. The state revises recent months.

Gas disposition

Where the gas went

Every month the operator tells the state where each mcf of gas went, using a code. The code decides how your gas is paid.

Since Jul 2025 the lease's gas goes to a transmission line instead of lease fuel

Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.

  • Transmission line (2)
  • Lease fuel (1)
Since Jul 2025 the lease's gas goes to a transmission line instead of lease fuelShare of GOODBAR 89 gas by disposition code each month, Aug 2023 to Jul 2026. Since Jul 2025 the lease's gas goes to a transmission line instead of lease fuel. Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.Share of the lease’s gas by disposition code, per month0%50%100%Jul 2025: fuel to lineOct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Since Jul 2025 the lease's gas goes to a transmission line instead of lease fuelShare of GOODBAR 89 gas by disposition code each month, Aug 2023 to Jul 2026. Since Jul 2025 the lease's gas goes to a transmission line instead of lease fuel. Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.Share of gas by disposition code0%50%100%Jul 25: fuel to lineJan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas disposition by code, lease 47670, district 08. Reported through Jul 2026.

Transmission line (2)

Sold straight into a pipeline without processing. Processing fees on your statement would be worth asking about.

Lease fuel (1)

Burned to run equipment on the lease. Not sold, so it pays no royalty. A few percent is normal.

None of the gas was flared in the last 12 months.

Operator history

Who has run this lease

The operator runs the wells and pays your royalty. When the operator changes, payments often slip for a month or two.

The operator changed 3 times, most recently in Aug 2025

If your statements skip or shrink around a change, ask the new operator's owner relations department whether the month is in suspense.

Operators of this lease over timeCri Operating LLC, Jan 2020 to Aug 2020; Mito Resources TX LLC, Sep 2020 to Apr 2023; Nec Operating, LLC, May 2023 to Jul 2025; Great American Resources Inc., Aug 2025 to Jul 20262020202120222023202420252026Changed Sep 2020Changed May 2023Changed Aug 2025Cri Operating LLCJan 2020 to Aug 2020Mito Resources TX LLCSep 2020 to Apr 2023Nec Operating, LLCMay 2023 to Jul 2025Great American Resources Inc.Aug 2025 to now
Operators of this lease over timeCri Operating LLC, Jan 2020 to Aug 2020; Mito Resources TX LLC, Sep 2020 to Apr 2023; Nec Operating, LLC, May 2023 to Jul 2025; Great American Resources Inc., Aug 2025 to Jul 20262020202120222023202420252026Changed Sep 2020Changed May 2023Changed Aug 2025Cri Operating LLCJan 2020 to Aug 2020Mito Resources TX LLCSep 2020 to Apr 2023Nec Operating, LLCMay 2023 to Jul 2025Great American Resources Inc.Aug 2025 to now

SourceTexas Railroad Commission Production Data Query, operator by month. Reported through Jul 2026.

Wells

4 wells on this lease

Every well the Railroad Commission links to oil lease 47670 in district 08. The API number is the state’s ID for a well.
Wells on GOODBAR 89
API numberWell no.Status
42-461-401414HActive
42-461-406171HActive
42-461-407243HActive
42-461-407795HActive

SourceTexas Railroad Commission Wellbore Query, district 08, lease 47670.

Who buys and gathers

Who moves and buys this lease's production

The operator files a Form P-4 with the Railroad Commission naming the companies authorised to gather and buy the oil and gas. The buyer's price is the one your royalty is figured on.
  • Oil

    Lpc Crude Iii, LLC gathers it.

    100% of it, on the list since May 15, 2023

  • Gas from oil wells

    Dcp Operating Company, LP buys and gathers it.

    Dcp Operating Company, LP buys it: 100% of it, on the list since Apr 1, 2017 · Dcp Operating Company, LP gathers it: 100% of it, on the list since Apr 1, 2017

Companies that used to be listed: Cp Energy, L.l.c. (gathers it, until May 15, 2023); Cp Energy, L.l.c. (gathers it, until Feb 1, 2020); Plains Marketing, L.p. (gathers it, until Feb 1, 2020); Cp Energy, L.l.c. (gathers it, until Nov 5, 2019); Plains Marketing, L.p. (gathers it, until Nov 5, 2019).

SourceRailroad Commission of Texas, Form P-4 file, dated Sep 24, 2026 (source). A listed company is authorised to move or buy the production; the state does not say what it paid.

Unit and wells

654.08 acres on the newest permit

Acres and wells as the operator filed them on its Railroad Commission drilling permits. Your decimal is your net acres over the unit acres, so this is the number to hold your division order against.
Wells on the permits
44 not plugged
Horizontal
4
First completion
Oct 14, 2015
Latest permit
Mar 9, 2018
Wells and acres on the permits for Goodbar 89
API numberWell no.Acreson the permit
42-461-407795H654.08
42-461-407243H654.08
42-461-406171H654.08
42-461-401414H654.08

SourceRailroad Commission of Texas, drilling permits and wellbore file, Sep 26, 2026 (source 1, source 2). The acres are what the operator filed; they are not a survey.

Estimator

Estimate your royalty for this lease

A rough check before you look at a statement: the state volumes times your decimal, priced at WTI and Henry Hub.

Estimator

What could your check be?

Your decimal interest is the small number on your division order that says what share of the whole lease (8/8ths) is yours. Type it in and we apply it to what the state says GOODBAR 89 sold each month.

For example 0.00097656, or a fraction like 1/1024.

Dollars per barrel. Your statements show the gap your operator uses. Leave 0 to price oil at WTI.

Your estimate appears here

Enter your decimal to see an estimated royalty for each of the last 12 months this lease reported. Nothing you type leaves your browser.

An estimate, not your check

It ignores gathering and processing fees, taxes, plant products and the price your operator actually gets, so your statement will differ. Use it as a ceiling to compare against. Regional gas prices are often below Henry Hub.

Ledger

36 months, newest first

Compare these numbers with your statements. Your share of a month is the “Oil sold” volume times your decimal. Scroll sideways on a phone.
Monthly production, disposition and prices for GOODBAR 89
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3Flaredmcf, code 4WTI$ per bblHenry Hub$ per MMBtu
Jul 2026Great American1,1917185695690$80.46$2.89
Jun 2026Great American1,2131,6804354350$84.81$3.15
May 2026Great American1,0705165495490$102.13$2.94
Apr 2026Great American9581,2163113110$100.32$2.77
Mar 2026Great American1,1121,0016096090$91.38$3.04
Feb 2026Great American9811,0391231230$64.51$3.62
Jan 2026Great American9681,1961241240$60.04$7.72
Dec 2025Great American1,1826447807800$57.97$4.26
Nov 2025Great American1,3491,3197857850$60.06$3.79
Oct 2025Great American1,1971,1823443440$60.89$3.19
Sep 2025Great American9448791721720$63.96$2.97
Aug 2025Great American8932,8928448440$64.86$2.91
Jul 2025Nec Operating,9868226646640$68.39$3.20
Jun 2025Nec Operating,1,2041,1978400$68.17$3.02
May 2025Nec Operating,1,2331,3528400$62.17$3.12
Apr 2025Nec Operating,1,0091,2148400$63.54$3.42
Mar 2025Nec Operating,1,0441,0398400$68.24$4.12
Feb 2025Nec Operating,8598488400$71.53$4.19
Jan 2025Nec Operating,1,0421,7788400$75.74$4.13
Dec 2024Nec Operating,1,3031,0178400$70.12$3.01
Nov 2024Nec Operating,1,2891,0088400$69.95$2.12
Oct 2024Nec Operating,1,3541,1708400$71.99$2.20
Sep 2024Nec Operating,1,5091,6758400$70.24$2.28
Aug 2024Nec Operating,1,4401,3628400$76.68$1.99
Jul 2024Nec Operating,1,3601,5458400$81.80$2.07
Jun 2024Nec Operating,1,5381,6478400$79.77$2.54
May 2024Nec Operating,1,7651,6648400$80.02$2.12
Apr 2024Nec Operating,1,7261,9888400$85.35$1.60
Mar 2024Nec Operating,1,4231,8798400$81.28$1.49
Feb 2024Nec Operating,1,3161,1478400$77.25$1.72
Jan 2024Nec Operating,1,7711,1718400$74.15$3.18
Dec 2023Nec Operating,1,9421,7988400$71.90$2.52
Nov 2023Nec Operating,1,9131,7958400$77.69$2.71
Oct 2023Nec Operating,1,9541,4268400$85.64$2.98
Sep 2023Nec Operating,1,5108688400$89.43$2.64
Aug 2023Nec Operating,1,5181,9918400$81.39$2.58

No report filed More than 3% of gas flared

SourceVolumes: Texas Railroad Commission Production Data Query, reported through Jul 2026. Prices: EIA WTI Cushing spot and Henry Hub spot, monthly, through Aug 2026. “Gas sold” is gas sent to a transmission line (code 2) or a plant (code 3).

Check your statements

Do your checks match this lease?

Upload your statements for GOODBAR 89. We compare volumes, prices, deductions and timing with the state record and give you the exact question to ask Great American Resources Inc.

  • A month that was never paid
  • Your share of the barrels and mcf
  • The price against WTI and Henry Hub
  • Fees taken on gas
  • Late payment interest

Around this lease

Walk the neighborhood

Everything on this page connects to the operator, field and county records. Start from any of them.

Great American Resources Inc. in Upton County

All Great American Resources Inc. leases →

McElroy field

All leases in this field →

Leases within 10 km

Found by the location of their wells.

  • GAP

    0 bbl last 12 months · 0.2 km away

  • SNICKERS (A)

    4,510 bbl last 12 months · 0.8 km away

  • SNICKERS B

    2,997 bbl last 12 months · 1.2 km away

  • BELL 88

    1,924 bbl last 12 months · 1.2 km away

  • SNICKERS

    476 bbl last 12 months · 1.6 km away

Drilling permits within 10 km

How to read this page

Questions owners ask

What is a decimal interest?

It is your share of the whole lease, written as a decimal. A 1/4 royalty on 5 net acres in a 1,280-acre unit is 1/4 × 5 ÷ 1,280 = 0.00097656. Your division order states yours.

How do I use this page to check a royalty check?

Take the “Oil sold” volume for the month the check covers and multiply it by your decimal. The answer should match the barrels on your statement. If it does not, upload the statement and we will show where the two differ.

Why is the newest month Jul 2026?

The Railroad Commission publishes production two to three months after the fact and revises recent months. We re-pull the latest three months on every update.

Does this page show what my check should be?

No. It shows what the state recorded. Prices, fees and taxes depend on your lease and on what your operator gets for the oil and gas. The estimator gives a ceiling to compare against.

Sources and method

Where these numbers come from

  • Production and disposition by month: Texas Railroad Commission Production Data Query, oil lease 47670, district 08, reported through Jul 2026.
  • Wells: Texas Railroad Commission Wellbore Query.
  • Prices: U.S. Energy Information Administration, WTI Cushing spot and Henry Hub spot, monthly.
  • Page updated Sep 28, 2026.

We show the state’s numbers as filed. Where the state has no report for a month, we say so instead of guessing.