Skip to content

Texas gas well · RRC district 7B · Lease 290540

Producing

HAILEY D

Hailey D is a gas well in Eastland County, Texas, operated by Bear Springs Oil & Gas, L.l.c in the Caddo (Marble Falls) field. The Railroad Commission shows 11,608 mcf of gas in the 12 months through Jun 2026.

Gas well dossier · 1 well

11,608mcf gas, last 12 months−37% vs prior year
RRC lease
7B-290540

Own a share of this lease?

Is your check right?

Upload a check stub or a phone photo. We compare every month with the state numbers on this page.

Check my statement

Free. No account needed. Two to four pages.

Where it sits

This county

Eastland CountyEastlandShackelfordCallahanPalo PintoErathComancheStephensEastland County
Eastland County · RRC district 7BOpen Eastland County →
Oil, last 12 months
557 bbl
Gas in Jun 2026
380 mcf
Reporting to the state
since Dec 2021
Wells
1

Production

Month by month, from the state record

What the Railroad Commission says this gas well produced. Oil is in barrels (bbl). Gas is in thousand cubic feet (mcf).

Gas output fell 37% over the last 12 months

10,529 mcf in the 12 months through Jul 2026, against 16,745 mcf in the 12 months before. Jul 2026 was not reported. A red cross marks each one.

  • Gas (bars, left axis)
  • Oil (line, right axis)
  • Last 12 months
Gas output fell 37% over the last 12 monthsMonthly gas production and oil for HAILEY D, Aug 2023 to Jul 2026. Gas output fell 37% over the last 12 months. 10,529 mcf in the 12 months through Jul 2026, against 16,745 mcf in the 12 months before.Last 12 months: 10,529 mcfmcf per monthbbl per month00500501,0001001,5001502,0002002,500250Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Gas output fell 37% over the last 12 monthsMonthly gas production and oil for HAILEY D, Aug 2023 to Jul 2026. Gas output fell 37% over the last 12 months. 10,529 mcf in the 12 months through Jul 2026, against 16,745 mcf in the 12 months before.Last 12 monthsmcf per monthbbl per month00500501,0001001,5001502,0002002,500250Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas well 290540, district 7B. Reported through Jul 2026. The state revises recent months.

Gas disposition

Where the gas went

Every month the operator tells the state where each mcf of gas went, using a code. The code decides how your gas is paid.

Since Sep 2023 the lease's gas goes to a processing plant instead of a transmission line

Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.

  • Processing plant (3)
  • Transmission line (2)
Since Sep 2023 the lease's gas goes to a processing plant instead of a transmission lineShare of HAILEY D gas by disposition code each month, Aug 2023 to Jul 2026. Since Sep 2023 the lease's gas goes to a processing plant instead of a transmission line. Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.Share of the lease’s gas by disposition code, per month0%50%100%Sep 2023: line to plantOct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Since Sep 2023 the lease's gas goes to a processing plant instead of a transmission lineShare of HAILEY D gas by disposition code each month, Aug 2023 to Jul 2026. Since Sep 2023 the lease's gas goes to a processing plant instead of a transmission line. Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.Share of gas by disposition code0%50%100%Sep 23: line to plantJan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas disposition by code, lease 290540, district 7B. Reported through Jul 2026.

Processing plant (3)

Sent to a gas plant that pulls out natural gas liquids. Your statement should show plant products, and may show processing fees.

Transmission line (2)

Sold straight into a pipeline without processing. Processing fees on your statement would be worth asking about.

None of the gas was flared in the last 12 months.

Operator history

Who has run this lease

The operator runs the wells and pays your royalty. When the operator changes, payments often slip for a month or two.

Bear Springs Oil & Gas, L.l.c has reported this lease for the whole period

No change of operator in the months we hold.

Operators of this lease over timeBear Springs Oil & Gas, L.l.c, Dec 2021 to Jun 202620222023202420252026Bear Springs Oil & Gas, L.l.cDec 2021 to nowthrough Jul 2026
Operators of this lease over timeBear Springs Oil & Gas, L.l.c, Dec 2021 to Jun 202620222023202420252026Bear Springs Oil & Gas, L.l.cDec 2021 to nowthrough Jul 2026

SourceTexas Railroad Commission Production Data Query, operator by month. Reported through Jul 2026.

Wells

1 well on this lease

Every well the Railroad Commission links to gas well 290540 in district 7B. The API number is the state’s ID for a well.
Wells on HAILEY D
API numberWell no.Status
42-133-382849Active

SourceTexas Railroad Commission Wellbore Query, district 7B, lease 290540.

Who buys and gathers

Who moves and buys this lease's production

The operator files a Form P-4 with the Railroad Commission naming the companies authorised to gather and buy the oil and gas. The buyer's price is the one your royalty is figured on.
  • Condensate

    Gulfmark Energy, Inc. gathers it.

    100% of it, on the list since Jan 16, 2021

  • Gas from gas wells

    Hanlon Gas Processing, Ltd. buys and gathers it.

    Hanlon Gas Processing, Ltd. buys it: 100% of it, on the list since Jan 16, 2021 · Hanlon Gas Processing, Ltd. gathers it: 100% of it, on the list since Jan 16, 2021

SourceRailroad Commission of Texas, Form P-4 file, dated Sep 24, 2026 (source). A listed company is authorised to move or buy the production; the state does not say what it paid.

Unit and wells

70 acres on the newest permit

Acres and wells as the operator filed them on its Railroad Commission drilling permits. Your decimal is your net acres over the unit acres, so this is the number to hold your division order against.
Wells on the permits
11 not plugged
Horizontal
0
First completion
Jan 16, 2021
Latest permit
Aug 11, 2020
Wells and acres on the permits for Hailey D
API numberWell no.Acreson the permit
42-133-38284970

SourceRailroad Commission of Texas, drilling permits and wellbore file, Sep 26, 2026 (source 1, source 2). The acres are what the operator filed; they are not a survey.

Estimator

Estimate your royalty for this lease

A rough check before you look at a statement: the state volumes times your decimal, priced at WTI and Henry Hub.

Estimator

What could your check be?

Your decimal interest is the small number on your division order that says what share of the whole lease (8/8ths) is yours. Type it in and we apply it to what the state says HAILEY D sold each month.

For example 0.00097656, or a fraction like 1/1024.

Dollars per barrel. Your statements show the gap your operator uses. Leave 0 to price oil at WTI.

Your estimate appears here

Enter your decimal to see an estimated royalty for each of the last 12 months this lease reported. Nothing you type leaves your browser.

An estimate, not your check

It ignores gathering and processing fees, taxes, plant products and the price your operator actually gets, so your statement will differ. Use it as a ceiling to compare against. Regional gas prices are often below Henry Hub.

Ledger

36 months, newest first

Compare these numbers with your statements. Your share of a month is the “Gas sold” volume times your decimal. Scroll sideways on a phone.
Monthly production, disposition and prices for HAILEY D
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3Flaredmcf, code 4WTI$ per bblHenry Hub$ per MMBtu
Jul 2026No report–––––$80.46$2.89
Jun 2026Bear Springs6103803800$84.81$3.15
May 2026Bear Springs003953950$102.13$2.94
Apr 2026Bear Springs909479470$100.32$2.77
Mar 2026Bear Springs431701,0651,0650$91.38$3.04
Feb 2026Bear Springs5401,3261,3260$64.51$3.62
Jan 2026Bear Springs4808948940$60.04$7.72
Dec 2025Bear Springs4701,0851,0850$57.97$4.26
Nov 2025Bear Springs451749649640$60.06$3.79
Oct 2025Bear Springs4501,0461,0460$60.89$3.19
Sep 2025Bear Springs4401,0271,0270$63.96$2.97
Aug 2025Bear Springs951701,4001,4000$64.86$2.91
Jul 2025Bear Springs6601,0791,0790$68.39$3.20
Jun 2025Bear Springs691671,1181,1180$68.17$3.02
May 2025Bear Springs17301,2741,2740$62.17$3.12
Apr 2025Bear Springs861681,0021,0020$63.54$3.42
Mar 2025Bear Springs11101,3971,3970$68.24$4.12
Feb 2025Bear Springs971699879870$71.53$4.19
Jan 2025Bear Springs811331,3361,3360$75.74$4.13
Dec 2024Bear Springs971751,8141,8140$70.12$3.01
Nov 2024Bear Springs8401,8491,8490$69.95$2.12
Oct 2024Bear Springs1031522,1192,1190$71.99$2.20
Sep 2024Bear Springs84901,3851,3850$70.24$2.28
Aug 2024Bear Springs1021561,3851,3850$76.68$1.99
Jul 2024Bear Springs009119110$81.80$2.07
Jun 2024Bear Springs00000$79.77$2.54
May 2024Bear Springs13305705700$80.02$2.12
Apr 2024Bear Springs1000000$85.35$1.60
Mar 2024Bear Springs005945940$81.28$1.49
Feb 2024Bear Springs004884880$77.25$1.72
Jan 2024Bear Springs006486480$74.15$3.18
Dec 2023Bear Springs007067060$71.90$2.52
Nov 2023Bear Springs005035030$77.69$2.71
Oct 2023Bear Springs004934930$85.64$2.98
Sep 2023Bear Springs006336330$89.43$2.64
Aug 2023Bear Springs006496490$81.39$2.58

No report filed More than 3% of gas flared

SourceVolumes: Texas Railroad Commission Production Data Query, reported through Jul 2026. Prices: EIA WTI Cushing spot and Henry Hub spot, monthly, through Aug 2026. “Gas sold” is gas sent to a transmission line (code 2) or a plant (code 3).

Check your statements

Do your checks match this lease?

Upload your statements for HAILEY D. We compare volumes, prices, deductions and timing with the state record and give you the exact question to ask Bear Springs Oil & Gas, L.l.c.

  • A month that was never paid
  • Your share of the barrels and mcf
  • The price against WTI and Henry Hub
  • Fees taken on gas
  • Late payment interest

Around this lease

Walk the neighborhood

Everything on this page connects to the operator, field and county records. Start from any of them.

Bear Springs Oil & Gas, L.l.c in Eastland County

No other producing leases from this operator in this county are in our data yet.

Caddo (Marble Falls) field

No other producing leases in this field are in our data yet.

Leases within 10 km

Found by the location of their wells.

  • HAILEY D

    0 bbl last 12 months · 0.2 km away

  • HAILEY D

    0 bbl last 12 months · 0.2 km away

  • HAILEY D

    0 mcf last 12 months · 0.3 km away

  • HAILEY D

    0 bbl last 12 months · 0.3 km away

  • HAILEY D

    0 mcf last 12 months · 0.3 km away

Drilling permits within 10 km

How to read this page

Questions owners ask

What is a decimal interest?

It is your share of the whole lease, written as a decimal. A 1/4 royalty on 5 net acres in a 1,280-acre unit is 1/4 × 5 ÷ 1,280 = 0.00097656. Your division order states yours.

How do I use this page to check a royalty check?

Take the “Gas sold” volume for the month the check covers and multiply it by your decimal. The answer should match the mcf on your statement. If it does not, upload the statement and we will show where the two differ.

Why is the newest month Jun 2026?

The Railroad Commission publishes production two to three months after the fact and revises recent months. We re-pull the latest three months on every update.

Does this page show what my check should be?

No. It shows what the state recorded. Prices, fees and taxes depend on your lease and on what your operator gets for the oil and gas. The estimator gives a ceiling to compare against.

Sources and method

Where these numbers come from

  • Production and disposition by month: Texas Railroad Commission Production Data Query, gas well 290540, district 7B, reported through Jul 2026.
  • Wells: Texas Railroad Commission Wellbore Query.
  • Prices: U.S. Energy Information Administration, WTI Cushing spot and Henry Hub spot, monthly.
  • Page updated Sep 28, 2026.

We show the state’s numbers as filed. Where the state has no report for a month, we say so instead of guessing.