Skip to content

Texas gas well · RRC district 7C · Lease 186327

Producing

HALAMICEK

Halamicek is a gas well in Upton County, Texas, operated by Diamondback E&P LLC in the Amacker-Tippett, E. (Devonian) field. The Railroad Commission shows 5,427 mcf of gas in the 12 months through Jul 2026.

Gas well dossier · 1 well

5,427mcf gas, last 12 months0% vs prior year
RRC lease
7C-186327

Own a share of this lease?

Is your check right?

Upload a check stub or a phone photo. We compare every month with the state numbers on this page.

Check my statement

Free. No account needed. Two to four pages.

Where it sits

This county

Upton CountyUptonMidlandCraneGlasscockReaganEctorUpton County
Upton County · RRC district 7COpen Upton County →
Oil, last 12 months
433 bbl
Gas in Jul 2026
717 mcf
Reporting to the state
since Jan 2020
Wells
1

Production

Month by month, from the state record

What the Railroad Commission says this gas well produced. Oil is in barrels (bbl). Gas is in thousand cubic feet (mcf).

Gas output held steady over the last 12 months

5,427 mcf in the 12 months through Jul 2026, against 5,443 mcf in the 12 months before.

  • Gas (bars, left axis)
  • Oil (line, right axis)
  • Last 12 months
Gas output held steady over the last 12 monthsMonthly gas production and oil for HALAMICEK, Aug 2023 to Jul 2026. Gas output held steady over the last 12 months. 5,427 mcf in the 12 months through Jul 2026, against 5,443 mcf in the 12 months before.Last 12 months: 5,427 mcfmcf per monthbbl per month00500251,000501,500752,0001002,500125Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Gas output held steady over the last 12 monthsMonthly gas production and oil for HALAMICEK, Aug 2023 to Jul 2026. Gas output held steady over the last 12 months. 5,427 mcf in the 12 months through Jul 2026, against 5,443 mcf in the 12 months before.Last 12 monthsmcf per monthbbl per month00500251,000501,500752,0001002,500125Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas well 186327, district 7C. Reported through Jul 2026. The state revises recent months.

Gas disposition

Where the gas went

Every month the operator tells the state where each mcf of gas went, using a code. The code decides how your gas is paid.

Since Nov 2024 the lease's gas goes to a transmission line instead of a processing plant

Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.

  • Processing plant (3)
  • Transmission line (2)
  • Flared (4)
Since Nov 2024 the lease's gas goes to a transmission line instead of a processing plantShare of HALAMICEK gas by disposition code each month, Aug 2023 to Jul 2026. Since Nov 2024 the lease's gas goes to a transmission line instead of a processing plant. Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.Share of the lease’s gas by disposition code, per month0%50%100%Nov 2024: plant to lineOct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Since Nov 2024 the lease's gas goes to a transmission line instead of a processing plantShare of HALAMICEK gas by disposition code each month, Aug 2023 to Jul 2026. Since Nov 2024 the lease's gas goes to a transmission line instead of a processing plant. Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.Share of gas by disposition code0%50%100%Nov 24: plant to lineJan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas disposition by code, lease 186327, district 7C. Reported through Jul 2026.

Processing plant (3)

Sent to a gas plant that pulls out natural gas liquids. Your statement should show plant products, and may show processing fees.

Transmission line (2)

Sold straight into a pipeline without processing. Processing fees on your statement would be worth asking about.

Flared (4)

Burned off or vented, not sold. It pays no royalty. More than 3% in a month is worth watching.

None of the gas was flared in the last 12 months.

Operator history

Who has run this lease

The operator runs the wells and pays your royalty. When the operator changes, payments often slip for a month or two.

The operator changed once, most recently in Jan 2025

If your statements skip or shrink around a change, ask the new operator's owner relations department whether the month is in suspense.

Operators of this lease over timeEndeavor Energy Resources L.P., Jan 2020 to Dec 2024; Diamondback E&P LLC, Jan 2025 to Jul 20262020202120222023202420252026Changed Jan 2025Endeavor Energy Resources L.P.Jan 2020 to Dec 2024Diamondback E&P LLCJan 2025 to now
Operators of this lease over timeEndeavor Energy Resources L.P., Jan 2020 to Dec 2024; Diamondback E&P LLC, Jan 2025 to Jul 20262020202120222023202420252026Changed Jan 2025Endeavor Energy Resources L.P.Jan 2020 to Dec 2024Diamondback E&P LLCJan 2025 to now

SourceTexas Railroad Commission Production Data Query, operator by month. Reported through Jul 2026.

Wells

1 well on this lease

Every well the Railroad Commission links to gas well 186327 in district 7C. The API number is the state’s ID for a well.
Wells on HALAMICEK
API numberWell no.Status
42-461-341657901HActive

SourceTexas Railroad Commission Wellbore Query, district 7C, lease 186327.

Who buys and gathers

Who moves and buys this lease's production

The operator files a Form P-4 with the Railroad Commission naming the companies authorised to gather and buy the oil and gas. The buyer's price is the one your royalty is figured on.
  • Condensate

    Enterprise Crude Oil LLC gathers it.

    100% of it, on the list since Aug 1, 2025

  • Gas from gas wells

    Et Gathering & Processing LLC buys it; Energy Transfer Company gathers it.

    Et Gathering & Processing LLC buys it: 100% of it, on the list since Mar 1, 2026 · Energy Transfer Company gathers it: 100% of it, on the list since Aug 1, 2024

Companies that used to be listed: Etc Gas Processing, LLC (buys it, until Mar 1, 2026); Oasis Transp & Marketing Corp. (gathers it, until Aug 1, 2025); Etc South Permian Midstream LLC (buys it, until Aug 1, 2025); Wtg South Permian Midstream LLC (gathers it, until Aug 1, 2024); Wtg South Permian Midstream LLC (buys it, until Aug 1, 2024); Wtg Gas Processing, L.p. (gathers it, until May 1, 2021).

SourceRailroad Commission of Texas, Form P-4 file, dated Sep 24, 2026 (source). A listed company is authorised to move or buy the production; the state does not say what it paid.

Unit and wells

282.36 acres on the newest permit

Acres and wells as the operator filed them on its Railroad Commission drilling permits. Your decimal is your net acres over the unit acres, so this is the number to hold your division order against.
Wells on the permits
11 not plugged
Horizontal
1
First completion
Jul 31, 2001
Latest permit
Apr 4, 2001

A pooling certificate was filed

Your tract may share its production with neighbours in a pooled unit. The unit acres the operator uses to divide production can differ from the acreage on one permit.

Wells and acres on the permits for Halamicek
API numberWell no.Acreson the permit
42-461-341657901H282.36

SourceRailroad Commission of Texas, drilling permits and wellbore file, Sep 26, 2026 (source 1, source 2). The acres are what the operator filed; they are not a survey.

What the operator reported

What Diamondback Energy, Inc. told investors it received

Diamondback E&P LLC is linked to Diamondback Energy, Inc. (FANG). Public companies report the average price they realize each quarter. It is an average across everything the company operates, not the price on this lease.
Realized prices reported by Diamondback Energy, Inc.
QuarterOil$ per bblFiling
Q2 2026$96.82SEC filing
Q1 2026$73.47SEC filing
Q4 2025$58.00SEC filing
Q3 2025$64.60SEC filing
Q2 2025$63.23SEC filing
Q1 2025$70.95SEC filing

SourceDiamondback Energy, Inc. quarterly reports on SEC EDGAR, prices before hedging where the company states both. Read by machine from each filing’s tables; the link opens the filing so you can check the figure.

Estimator

Estimate your royalty for this lease

A rough check before you look at a statement: the state volumes times your decimal, priced at WTI and Henry Hub.

Estimator

What could your check be?

Your decimal interest is the small number on your division order that says what share of the whole lease (8/8ths) is yours. Type it in and we apply it to what the state says HALAMICEK sold each month.

For example 0.00097656, or a fraction like 1/1024.

Dollars per barrel. Your statements show the gap your operator uses. Leave 0 to price oil at WTI.

Your estimate appears here

Enter your decimal to see an estimated royalty for each of the last 12 months this lease reported. Nothing you type leaves your browser.

An estimate, not your check

It ignores gathering and processing fees, taxes, plant products and the price your operator actually gets, so your statement will differ. Use it as a ceiling to compare against. Regional gas prices are often below Henry Hub.

Ledger

36 months, newest first

Compare these numbers with your statements. Your share of a month is the “Gas sold” volume times your decimal. Scroll sideways on a phone.
Monthly production, disposition and prices for HALAMICEK
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3Flaredmcf, code 4WTI$ per bblHenry Hub$ per MMBtu
Jul 2026Diamondback E&P15367177170$80.46$2.89
Jun 2026Diamondback E&P33314804800$84.81$3.15
May 2026Diamondback E&P27484334330$102.13$2.94
Apr 2026Diamondback E&P37579969960$100.32$2.77
Mar 2026Diamondback E&P83351,7521,7520$91.38$3.04
Feb 2026Diamondback E&P72311110$64.51$3.62
Jan 2026Diamondback E&P11220200$60.04$7.72
Dec 2025Diamondback E&P1612429290$57.97$4.26
Nov 2025Diamondback E&P48015150$60.06$3.79
Oct 2025Diamondback E&P102771651650$60.89$3.19
Sep 2025Diamondback E&P1103643640$63.96$2.97
Aug 2025Diamondback E&P43674454450$64.86$2.91
Jul 2025Diamondback E&P4701021020$68.39$3.20
Jun 2025Diamondback E&P25341041040$68.17$3.02
May 2025Diamondback E&P1201401400$62.17$3.12
Apr 2025Diamondback E&P24493433430$63.54$3.42
Mar 2025Diamondback E&P1705025020$68.24$4.12
Feb 2025Diamondback E&P53708518438$71.53$4.19
Jan 2025Diamondback E&P576776074515$75.74$4.13
Dec 2024Endeavor Energy70566686653$70.12$3.01
Nov 2024Endeavor Energy45466886835$69.95$2.12
Oct 2024Endeavor Energy49654614610$71.99$2.20
Sep 2024Endeavor Energy42843623620$70.24$2.28
Aug 2024Endeavor Energy8004624620$76.68$1.99
Jul 2024Endeavor Energy25493993990$81.80$2.07
Jun 2024Endeavor Energy41446026020$79.77$2.54
May 2024Endeavor Energy38484454450$80.02$2.12
Apr 2024Endeavor Energy4607487480$85.35$1.60
Mar 2024Endeavor Energy22471471470$81.28$1.49
Feb 2024Endeavor Energy2801001000$77.25$1.72
Jan 2024Endeavor Energy161915150$74.15$3.18
Dec 2023Endeavor Energy7013130$71.90$2.52
Nov 2023Endeavor Energy72822220$77.69$2.71
Oct 2023Endeavor Energy8026260$85.64$2.98
Sep 2023Endeavor Energy1737000$89.43$2.64
Aug 2023Endeavor Energy17046460$81.39$2.58

No report filed More than 3% of gas flared

SourceVolumes: Texas Railroad Commission Production Data Query, reported through Jul 2026. Prices: EIA WTI Cushing spot and Henry Hub spot, monthly, through Aug 2026. “Gas sold” is gas sent to a transmission line (code 2) or a plant (code 3).

Check your statements

Do your checks match this lease?

Upload your statements for HALAMICEK. We compare volumes, prices, deductions and timing with the state record and give you the exact question to ask Diamondback E&P LLC.

  • A month that was never paid
  • Your share of the barrels and mcf
  • The price against WTI and Henry Hub
  • Fees taken on gas
  • Late payment interest

Around this lease

Walk the neighborhood

Everything on this page connects to the operator, field and county records. Start from any of them.

Diamondback E&P LLC in Upton County

All Diamondback E&P LLC leases →

Amacker-Tippett, E. (Devonian) field

All leases in this field →

Leases within 10 km

Found by the location of their wells.

  • CORDES

    36,555 bbl last 12 months · 0.3 km away

  • HANGAR "B"

    1,226 mcf last 12 months · 0.4 km away

  • OLA

    11,572 bbl last 12 months · 0.4 km away

  • HANGAR "A"

    4,086 mcf last 12 months · 0.8 km away

  • HANGAR

    1,564 mcf last 12 months · 1.2 km away

Drilling permits within 10 km

How to read this page

Questions owners ask

What is a decimal interest?

It is your share of the whole lease, written as a decimal. A 1/4 royalty on 5 net acres in a 1,280-acre unit is 1/4 × 5 ÷ 1,280 = 0.00097656. Your division order states yours.

How do I use this page to check a royalty check?

Take the “Gas sold” volume for the month the check covers and multiply it by your decimal. The answer should match the mcf on your statement. If it does not, upload the statement and we will show where the two differ.

Why is the newest month Jul 2026?

The Railroad Commission publishes production two to three months after the fact and revises recent months. We re-pull the latest three months on every update.

Does this page show what my check should be?

No. It shows what the state recorded. Prices, fees and taxes depend on your lease and on what your operator gets for the oil and gas. The estimator gives a ceiling to compare against.

Sources and method

Where these numbers come from

  • Production and disposition by month: Texas Railroad Commission Production Data Query, gas well 186327, district 7C, reported through Jul 2026.
  • Wells: Texas Railroad Commission Wellbore Query.
  • Prices: U.S. Energy Information Administration, WTI Cushing spot and Henry Hub spot, monthly.
  • Page updated Sep 28, 2026.

We show the state’s numbers as filed. Where the state has no report for a month, we say so instead of guessing.