Skip to content
A-780 · SKINNER, C1A-780SKINNER, CHALCOMBN500 m33.2404° N 97.6638° W · PHOTO: U.S. GEOLOGICAL SURVEY

Texas gas wellRRC 09-071226Producing

Halcomb

One well in Wise County. The lease produced 1,131 thousand cubic feet of gas in the last 12 months, through August 2026.

13 accounts on the county roll

Is your family on this lease?

Email me when this lease changesI own here

County
Wise
On record since
January 1993
Newest report on file
August 2026
Wells
1

Outline: the original land surveys this lease's wells sit in. The State publishes no lease outlines. RRC surveys, 2026-09-29.

Eight things the public record says about this lease. Each one sets two records side by side, and one that finds nothing still shows and says so. Photo: U.S. Geological Survey.

The story, from 404 monthly reports

1993 to 2026: it sold the most in 2005

Gas sold each month since January 1993The numbers match the paragraphs below
199520002005201020152020202511993220053August 2026Jan 1993 onward

January 1993, where the State's monthly records start: the lease sold 459 thousand cubic feet of gas that month.

2005: the year the lease sold the most, $29,400 of oil and gas at public prices.

August 2026 is the newest monthly production report on file.

SourceRailroad Commission production reports, January 1993 through August 2026. Not a forecast, not reserves.

Checks stopped on this lease?

Buyer

Buyer changed: COLT G & P (NORTH TEXAS) L.P. replaced MIDCOAST G & P (NORTH TEXAS)L.P. as the buyer of this lease's gas from gas wells on Nov 1, 2024.

SourceRailroad Commission production, P-5 and P-4 records, data through August 2026.See why checks stop on this lease

404 months against 7 other recordsNew

Every month since January 1993, and what else happened that month

The lease is the line on top. Under it, on the same clock: the weather, the State, the price, the wells next door, who ran the lease, who bought from it and the rest of the field. Move across it.

Aug 2026
94 mcf · level with the three months before
Gas averaged $2.78 an mcf · General Operating Company
  • Nothing else on record this month.
SINCEJAN 19931995200020052010201520202025075150225300MCF A MONTHLAST 12 MONTHSWEATHERTHE STATEGAS PRICENEXT DOOROPERATORBUYERSTHE FIELDGeneral Operating Company2017201820192020202120222023202420252026

Move the pointer or drag across the chart.

Monthly gas sold from this lease since January 1993, with seven record tracks beneath it. Use the left and right arrow keys to move month by month.. 404 months from January 1993 to August 2026. The most in one month: 535 mcf, October 1993. The newest month: 94 mcf.

No numbered drop comparison is on file here.

SourcesProduction, cut-offs, operators and buyers: Railroad Commission of Texas. Weather: NOAA. Prices: U.S. Energy Information Administration. Fracs: FracFocus. A record in the same month is not proof of a cause. Through August 2026.

Royalty Watch tells you the month a drop starts, with the records from that month.Watch this lease

401 months, one line eachNew

No silent months since January 1993

A gap is a month with no oil and no gas reported. Many leases end after 60 to 90 days without production unless the lease says otherwise.

0

runs of two or more months with nothing reported, since January 1993.

94

thousand cubic feet of gas on the newest report on file with oil or gas, for August 2026, the State's newest month.

401

of 401 months with oil or gas reported since January 1993.

3.10

thousand cubic feet of gas a day on average from September 2025 through August 2026, counting a month with no report on file as zero.

January 1993Taller line, more gas soldMay 2026
1995200020052010201520202025

A shut-in payment or work on the wells can keep a lease alive through a gap. Your own lease paper decides.

SourceRailroad Commission production reports, January 1993 through May 2026. The newest months, after May 2026, are left out of the count because reports arrive late.

Royalty Watch tells you when a silent month starts, and drafts the letter asking whether the lease is still in force.Watch this lease

34 years of state records, 1993 to 2026

Sold since January 1993

$311,000

Sales at public prices before tax and deductions. Multiply by your decimal interest to estimate your share.

Gas sold
81,619thousand cubic feet
Best year
2005$29,400 sold
Sold each year, at that month's pricesOilGas
What the oil and gas from this lease sold for each year, 1993 to 2026, at each month's public prices.
YearOil, dollarsGas, dollarsTotal
1993$0$11,100$11,100
1994$0$7,520$7,520
1995$0$6,100$6,100
1996$0$7,190$7,190
1997$0$7,700$7,700
1998$0$6,860$6,860
1999$0$9,290$9,290
2000$0$15,900$15,900
2001$0$13,800$13,800
2002$0$11,900$11,900
2003$0$15,600$15,600
2004$0$20,200$20,200
2005$0$29,400$29,400, sold the most
2006$0$15,000$15,000
2007$0$17,200$17,200
2008$0$21,300$21,300
2009$0$10,900$10,900
2010$0$9,070$9,070
2011$0$6,370$6,370
2012$0$5,500$5,500
2013$0$6,820$6,820
2014$0$6,800$6,800
2015$0$3,660$3,660
2016$0$4,290$4,290
2017$0$5,260$5,260
2018$0$5,570$5,570
2019$0$3,480$3,480
2020$0$2,500$2,500
2021$0$4,780$4,780
2022$0$7,660$7,660
2023$0$2,830$2,830
2024$0$2,560$2,560
2025$0$4,130$4,130
2026, 2026 so far$0$2,730$2,730

Did a relative own a share of this lease?

The bars show every year. Pick one to add up what the lease has sold since.

SourcesRailroad Commission Production Data Query, every monthly report since January 1993. EIA monthly WTI and Henry Hub prices (before 1997, EIA's Texas wellhead gas price). 2026 is part of a year, drawn lighter. Not a forecast, not reserves.

The newest well, seen from the side

No well on the way. Well 1 was completed in May 1977.

ground2,000 ft4,000 ft6,000 ft16,482 ft deep
  1. Permit filedNot on file
  2. Drilling startedNot on file
  3. FrackedNot on file
  4. Completion filedMay 2, 1977
  5. First production on the leaseNot on file
  6. First checkNot on file

SourcesRailroad Commission drilling permits and well records, and the FracFocus registry. Lease record built November 17, 2026.

Royalty Watch follows new well permits and completions on this lease.Watch this lease

About 6 miles across

Wells on this lease and around it

1this lease, ringed
113producing
1fracked and waiting
1permits, last 24 months
15plugged
31original land surveys

For a lawyer, a buyer or a probate file. Wells and permits within about 2 miles. Railroad Commission of Texas, FracFocus and USGS imagery.

Use this map on your site

You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.

Download the picture (WebP)
<a href="https://royaltyclerk.com/texas/leases/halcomb-09-071226-g"><img src="https://royaltyclerk.com/maps/lease-wells/halcomb-09-071226-g.svg" alt="Map of the Halcomb lease in Wise County, Texas: its well ringed, among 161 wells and 1 recent drilling location in a picture about 6 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/leases/halcomb-09-071226-g">Wells on the Halcomb lease, Wise County, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>

From the State's well records

One well on this lease

Wells on Halcomb
WellAPI numberCompletedDepthfeetToday
142-497-30548May 19776,482Active

SourceRailroad Commission wellbore and completion records.

Gas, August 2026, dollars per thousand cubic feet New

Four prices for the same gas

What the market paid, what the operator told its investors, what it told the tax office for this lease, and the one only you hold.

$2.78
The marketHenry Hub, August 2026
none on file
Told its investorsno public parent's filing on record
not on file yet
Told the tax officeTexas Comptroller, this lease
?
Your statementonly you hold this one
On recordA lower tax is on record

The State approved a lower tax for this lease

Kind
Low Producing Wells
Wells
The whole lease
Runs
June 2010 to no end date on file
Rate
Not given in the file

Look at the tax line on your statement for this lease. The record says which rate applies.

Estimate your royalty

Type the decimal from your division order

The starting decimal is an example. Nothing you type here leaves this page.

$1.34a month

At these prices the whole lease’s reported sales were about $4,120 over 12 reported months. Your estimated share is $16 before taxes and deductions.

Monthly owner volumes and values
Estimated share before tax and deductions
MonthOil (bbl)Oil valueGas (mcf)Gas valueTotal
August 20260$0.000.3672$1.02$1.02
July 20260$0.000.3828$1.11$1.11
June 20260$0.000.3516$1.11$1.11
May 20260$0.000.375$1.10$1.10
April 20260$0.000.3516$0.97$0.97
March 20260$0.000.3516$1.07$1.07
February 20260$0.000.3008$1.09$1.09
January 20260$0.000.4141$3.20$3.20
December 20250$0.000.3906$1.66$1.66
November 20250$0.000.3906$1.48$1.48
October 20250$0.000.3516$1.12$1.12
September 20250$0.000.3906$1.16$1.16

SourcesMarket: U.S. Energy Information Administration (Henry Hub for gas, taken per thousand cubic feet). Investors: no public parent's filing is on record for the operator. Tax office and tax approval: Texas Comptroller. The third price shows once the Comptroller's records for this lease have arrived. As of October 1, 2026.

Watch Plus sets these prices beside the price on each of your statements, every month.See Watch Plus

Who takes the oil and gasNew

No buyer shares an owner with the operator

The State lists who gathers and who buys from each lease. Company filings list who owns whom. Here they are on one drawing.

GAS
Runs the leaseGeneral Operating Companysince January 1993
Gathers 100%COLT GATHERING (NORTH TEXAS)L.P.since November 2024
Buys 100%COLT G & P (NORTH TEXAS) L.P.since November 2024

No shared owner, officer or address on record between the gas buyers and the operator.

Earlier buyers and gatherers, back to 1993
Earlier companies named on the Form P-4
CompanyProductRoleFromUntil
MIDCOAST GATHERING (N TX) L.P.GasGathersOct 2018Nov 2024
MIDCOAST G & P (NORTH TEXAS)L.P.GasBuysOct 2018Nov 2024
PLAINS MARKETING, L.P.OilGathersJul 2000Nov 2024

SourcesBuyers and gatherers: Railroad Commission Form P-4 records, as of October 24, 2026. Ownership: U.S. Securities and Exchange Commission filings.

Royalty Watch tells you the day the buyer of your oil or gas changes.Watch this lease

Seen from space, 2025New

No satellite heat at this pad in 2025

Weather satellites pass over Texas every night and record heat on the ground. Drag the photo from day to night. Beside it, each night of 2025 next to what the operator reported burning.

A-780 · SKINNER, CONE SATELLITE PIXEL, ABOUT 375 M
DAYNIGHT, 2025
Each dot is a nightFlaring reported
JAN0none
FEB0none
MAR0none
APR0none
MAY0none
JUN0none
JUL0none
AUG0none
SEP0none
OCT0none
NOV0none
DEC0none

A lit dot is a night a satellite recorded heat within 500 m of a well on this lease. The red bar is gas reported vented or flared that month.

0

nights with heat recorded at this pad, 2025.

0

months in which flaring was reported.

0

months with heat seen and no flaring reported.

Where the gas went in 2025, as the operator reported it

100%Sold1,165 thousand cubic feet

SourcesHeat: NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data); the readings at this pad from NOAA-20, NOAA-21 and Suomi NPP, through November 16, 2026. Reported flaring and gas use: Railroad Commission production reports. Cloud hides heat, so the count of nights is a floor. The satellite records heat. It does not say what burned.

Watch Plus checks whether you were paid on gas in the months heat was seen.See Watch Plus

Where the gas went, month by month

All of the gas went to a transmission line in the last 12 months

Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.

All of the gas went to a transmission line in the last 12 monthsShare of Halcomb gas by disposition code each month, September 2023 to August 2026. All of the gas went to a transmission line in the last 12 months.Share of the lease’s gas by disposition code, per month0%50%100%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
All of the gas went to a transmission line in the last 12 monthsShare of Halcomb gas by disposition code each month, September 2023 to August 2026. All of the gas went to a transmission line in the last 12 months.Share of gas by disposition code0%50%100%Jan 24JulJan 25JulJan 26Jul

SourcesRailroad Commission production reports, gas disposition by code, September 2023 to August 2026.

Wise County Appraisal District, 2026 mineral roll

13 accounts on the county roll

Wise County Appraisal DistrictMineral roll 2026 · RRC 09-071226
ReadOct 7, 2026
Owners
12
Accounts
13
Appraised in all
$6,609

Is one of these yours?

Each square is one account

  • Overriding royalty 12
  • Working interest 1

SourceWise County Appraisal District, 2026 mineral roll (source), read October 7, 2026. Accounts matched to this lease by RRC number or lease name.

From the state record

What owners ask about Halcomb

01When is the check for August 2026 due?
August 2026 is the newest month the state has posted for this lease. Texas law gives the payor until 60 days after the end of the sale month for oil and 90 for gas: the gas by Nov 29, 2026, unless the lease sets another time.
Source: Railroad Commission production reports; Texas Natural Resources Code §91.402.
See your next three checks
02Which Texas production tax rate applies?
The Texas Comptroller lists low producing wells for this lease, from Jun 1, 2010. Its file does not give the rate, so we compare your stub with the full 7.5%. That is for August 2026.
Source: Texas Comptroller, approved severance tax exemptions.
Check the tax on your stub
03Who buys the oil and gas?
GASColt G & P (North Texas) L.p.100%
GASColt Gathering (North Texas)l.p.100%
Gas from gas wells: Colt G & P (North Texas) L.p. buys it. Full well stream: Colt Gathering (North Texas)l.p. gathers it. The buyer's price is what a royalty check is figured on.
Source: Railroad Commission Form P-4, gatherers and purchasers.
See every buyer and past buyers
04How many 1099s should an owner expect for 2025?
1January to December 2025: one operator of record in all 12 months
One company, General Operating Company, filed this lease's reports behind every 2025 check, so most owners get one form. The operator is not always the company that pays, so go by the name on the stubs.
Source: Railroad Commission production reports, operator of record by month.
Check your 1099 against it

Every monthly report the State holds

404 months, newest first

Ledger for Halcomb
MonthGas soldthousand cubic feetFlared or ventedthousand cubic feetSold forat public prices
AugustAug 2026940$261
JulyJul 2026980$283
JuneJun 2026900$284
MayMay 2026960$282
AprilApr 2026900$249
MarchMar 2026900$274
FebruaryFeb 2026770$279
JanuaryJan 20261060$818
DecemberDec 20251000$426
NovemberNov 20251000$379
OctoberOct 2025900$287
SeptemberSep 20251000$297
AugustAug 2025900$262
JulyJul 2025800$256
JuneJun 20251040$314
MayMay 20251000$312
AprilApr 2025900$308
MarchMar 20251080$445

SourcesTexas Railroad Commission Production Data Query, through August 2026. Prices: EIA.

Do your checks match this lease?

Check my statement

Likely owed Jan 2025

A whole month was never paid

The state shows 28,175 bbl of oil sold from this lease in January 2025, so your share is 27.51 bbl. No statement covers January 2025. That is the month the operator changed from Endeavor Energy Resources to Diamondback.

Ask Diamondback owner relations: is January 2025 being held in suspense after the change of operator?

$2,277oil + gas

A sample finding, from our example check. The full example found $3,328 likely owed.

Around this lease

Nearby

General Operating Company in Wise County

All General Operating Company leases

Boonsville (Bend Congl., Gas) field

All leases in this field

Leases within 10 km

Drilling permits within 10 km

  • DECATUR GU 3 1 (AW) #1Hrecompletion · horizontal · BKV Barnett, LLC · Sept 14, 2026 · 8.4 km
  • RAWLE 4H UNIT 1 (AW) #1Hrecompletion · horizontal · BKV Barnett, LLC · Jan 27, 2026 · 1.8 km
  • KEE, BOBBIE B. 3 (AW) #3Hnew drill · horizontal · BKV Barnett, LLC · Sept 9, 2025 · 4.9 km
  • KEE, BOBBIE B. 5 (AW) #5Hnew drill · horizontal · BKV Barnett, LLC · Sept 9, 2025 · 4.9 km
  • KEE, BOBBIE B. 4 (AW) #4Hnew drill · horizontal · BKV Barnett, LLC · Sept 8, 2025 · 4.9 km

Where it sits

This county

Wise CountyWiseJackClayCookeMontagueDentonWise County
Wise County

Where this page comes from

  • Railroad Commission of Texas production, Form P-4, permits, wells
  • Texas Comptroller tax approvals, lease values
  • U.S. Energy Information Administration prices
  • NOAA storms and cold
  • NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data) night heat
  • Wise County Appraisal District mineral roll
  • U.S. Geological Survey photos