Skip to content

Texas oil lease · RRC district 7C · Lease 16927

No report in 6+ months

HANEY

Haney is an oil lease in Irion County, Texas, operated by Rising Star Energy PTR, L.L.C. in the Arden, S. (Canyon SD.) field.

Oil lease dossier · 3 wells

0bbl oil, last 12 months
RRC lease
7C-16927

Own a share of this lease?

Is your check right?

Upload a check stub or a phone photo. We compare every month with the state numbers on this page.

Check my statement

Free. No account needed. Two to four pages.

Where it sits

This county

Irion CountyIrionTom GreenSchleicherSterlingGlasscockReaganCokeIrion County
Irion County · RRC district 7COpen Irion County →
Oil in Apr 2023
0 bbl
Reporting to the state
since Jan 2020
Wells
3
Data through
Apr 2023

Production

Month by month, from the state record

What the Railroad Commission says this oil lease produced. Oil is in barrels (bbl). Gas is in thousand cubic feet (mcf).

No oil produced in the last 12 months

The last month with output was Feb 2022, at 2 bbl.

  • Oil (bars, left axis)
  • Gas (line, right axis)
  • Last 12 months
No oil produced in the last 12 monthsMonthly oil production and gas for HANEY, May 2020 to Apr 2023. No oil produced in the last 12 months. The last month with output was Feb 2022, at 2 bbl.Last 12 months: 0 bblbbl per monthmcf per month0020500401,000601,500802,000Jul 20OctJan 21AprJulOctJan 22AprJulOctJan 23Apr
No oil produced in the last 12 monthsMonthly oil production and gas for HANEY, May 2020 to Apr 2023. No oil produced in the last 12 months. The last month with output was Feb 2022, at 2 bbl.Last 12 monthsbbl per monthmcf per month0020500401,000601,500802,000Jul 20Jan 21JulJan 22JulJan 23

SourceTexas Railroad Commission Production Data Query, oil lease 16927, district 7C. Reported through Jul 2026. The state revises recent months.

Gas disposition

Where the gas went

Every month the operator tells the state where each mcf of gas went, using a code. The code decides how your gas is paid.

All of the gas went to a processing plant in the last 12 months

Each bar is one month. Colors are the disposition codes the operator reported.

All of the gas went to a processing plant in the last 12 monthsShare of HANEY gas by disposition code each month, May 2020 to Apr 2023. All of the gas went to a processing plant in the last 12 months. Share of the lease’s gas by disposition code, per month0%50%100%Jul 20OctJan 21AprJulOctJan 22AprJulOctJan 23Apr
All of the gas went to a processing plant in the last 12 monthsShare of HANEY gas by disposition code each month, May 2020 to Apr 2023. All of the gas went to a processing plant in the last 12 months. Share of gas by disposition code0%50%100%Jul 20Jan 21JulJan 22JulJan 23

SourceTexas Railroad Commission Production Data Query, gas disposition by code, lease 16927, district 7C. Reported through Jul 2026.

Processing plant (3)

Sent to a gas plant that pulls out natural gas liquids. Your statement should show plant products, and may show processing fees.

None of the gas was flared in the last 12 months.

Operator history

Who has run this lease

The operator runs the wells and pays your royalty. When the operator changes, payments often slip for a month or two.

The operator changed once, most recently in Jan 2023

If your statements skip or shrink around a change, ask the new operator's owner relations department whether the month is in suspense.

Operators of this lease over timeWestern Chief Operating, L.L.C., Jan 2020 to Dec 2022; Rising Star Energy PTR, L.L.C., Jan 2023 to Apr 20232020202120222023Changed Jan 2023Western Chief Operating, L.L.…Jan 2020 to Dec 2022Rising Star Energy PTR, L.L.C.Jan 2023 to now
Operators of this lease over timeWestern Chief Operating, L.L.C., Jan 2020 to Dec 2022; Rising Star Energy PTR, L.L.C., Jan 2023 to Apr 20232020202120222023Changed Jan 2023Western Chief Operating, L.L.C.Jan 2020 to Dec 2022Rising Star Energy PTR, L.L.C.Jan 2023 to now

SourceTexas Railroad Commission Production Data Query, operator by month. Reported through Jul 2026.

Wells

3 wells on this lease

Every well the Railroad Commission links to oil lease 16927 in district 7C. The API number is the state’s ID for a well.
Wells on HANEY
API numberWell no.Status
42-235-344211Active
42-235-344672Active
42-235-344713Active

SourceTexas Railroad Commission Wellbore Query, district 7C, lease 16927.

Who buys and gathers

Who moves and buys this lease's production

The operator files a Form P-4 with the Railroad Commission naming the companies authorised to gather and buy the oil and gas. The buyer's price is the one your royalty is figured on.
  • Oil

    Energy Trans Crude Marketing LLC gathers it.

    100% of it, on the list since Jan 1, 2023

Companies that used to be listed: Targa Midstream Services LLC (gathers it, until Jan 1, 2023); Targa Midstream Services LLC (buys it, until Jan 1, 2023); Sunoco Ptnrs. Mktg.&terminals LP (gathers it, until Jan 1, 2023).

SourceRailroad Commission of Texas, Form P-4 file, dated Sep 24, 2026 (source). A listed company is authorised to move or buy the production; the state does not say what it paid.

Unit and wells

560.38 acres on the newest permit

Acres and wells as the operator filed them on its Railroad Commission drilling permits. Your decimal is your net acres over the unit acres, so this is the number to hold your division order against.
Wells on the permits
31 not plugged
Horizontal
0
First completion
Apr 15, 2009
Latest permit
Nov 19, 2009

The wells on this lease state different acreage

The permits state between 210.24 and 560.38 acres. Use the acres from your own division order for the well you are paid on.

Wells and acres on the permits for Haney
API numberWell no.Acreson the permit
42-235-344713560.38
42-235-344672210.24
42-235-344211210.24

SourceRailroad Commission of Texas, drilling permits and wellbore file, Sep 26, 2026 (source 1, source 2). The acres are what the operator filed; they are not a survey.

Estimator

Estimate your royalty for this lease

A rough check before you look at a statement: the state volumes times your decimal, priced at WTI and Henry Hub.

Estimator

What could your check be?

Your decimal interest is the small number on your division order that says what share of the whole lease (8/8ths) is yours. Type it in and we apply it to what the state says HANEY sold each month.

For example 0.00097656, or a fraction like 1/1024.

Dollars per barrel. Your statements show the gap your operator uses. Leave 0 to price oil at WTI.

Your estimate appears here

Enter your decimal to see an estimated royalty for each of the last 12 months this lease reported. Nothing you type leaves your browser.

An estimate, not your check

It ignores gathering and processing fees, taxes, plant products and the price your operator actually gets, so your statement will differ. Use it as a ceiling to compare against.

Ledger

36 months, newest first

Compare these numbers with your statements. Your share of a month is the “Oil sold” volume times your decimal. Scroll sideways on a phone.
Monthly production, disposition and prices for HANEY
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3Flaredmcf, code 4WTI$ per bblHenry Hub$ per MMBtu
Apr 2023Rising Star0184000$79.45$2.16
Mar 2023Rising Star00000$73.28$2.31
Feb 2023Rising Star00000$76.83$2.38
Jan 2023Rising Star00000$78.12$3.27
Dec 2022Western Chief00000$76.44$5.53
Nov 2022Western Chief00000$84.37$5.45
Oct 2022Western Chief00000$87.55$5.66
Sep 2022Western Chief00000$84.26$7.88
Aug 2022Western Chief00000$93.67$8.81
Jul 2022Western Chief00000$101.62$7.28
Jun 2022Western Chief00000$114.84$7.70
May 2022Western Chief00000$109.55$8.14
Apr 2022Western Chief00000$101.78$6.60
Mar 2022Western Chief00000$108.50$4.90
Feb 2022Western Chief201101100$91.64$4.69
Jan 2022Western Chief204504500$83.22$4.38
Dec 2021Western Chief506756750$71.71$3.76
Nov 2021Western Chief5204554550$79.15$5.05
Oct 2021Western Chief761714944940$81.48$5.51
Sep 2021Western Chief4104104100$71.65$5.16
Aug 2021Western Chief1504464460$67.73$4.07
Jul 2021Western Chief2504194190$72.49$3.84
Jun 2021Western Chief4706086080$71.38$3.26
May 2021Western Chief511729079070$65.17$2.91
Apr 2021Western Chief3809169160$61.72$2.66
Mar 2021Western Chief7109039030$62.33$2.62
Feb 2021Western Chief4406786780$59.04$5.35
Jan 2021Western Chief581739299290$52.00$2.71
Dec 2020Western Chief6609749740$47.02$2.58
Nov 2020Western Chief461699349340$40.94$2.61
Oct 2020Western Chief7406246240$39.40$2.39
Sep 2020Western Chief5508258250$39.63$1.92
Aug 2020Western Chief5906366360$42.34$2.30
Jul 2020Western Chief41621,2361,2360$40.71$1.76
Jun 2020Western Chief5201,7071,7070$38.31$1.63
May 2020Western Chief6801,8881,8880$28.56$1.75

No report filed More than 3% of gas flared

SourceVolumes: Texas Railroad Commission Production Data Query, reported through Jul 2026. Prices: EIA WTI Cushing spot and Henry Hub spot, monthly, through Aug 2026. “Gas sold” is gas sent to a transmission line (code 2) or a plant (code 3).

Check your statements

Do your checks match this lease?

Upload your statements for HANEY. We compare volumes, prices, deductions and timing with the state record and give you the exact question to ask Rising Star Energy PTR, L.L.C.

  • A month that was never paid
  • Your share of the barrels and mcf
  • The price against WTI and Henry Hub
  • Fees taken on gas
  • Late payment interest

Around this lease

Walk the neighborhood

Everything on this page connects to the operator, field and county records. Start from any of them.

Rising Star Energy PTR, L.L.C. in Irion County

No other producing leases from this operator in this county are in our data yet.

Arden, S. (Canyon SD.) field

All leases in this field →

Leases within 10 km

Found by the location of their wells.

  • MAYER

    824 bbl last 12 months · 0.4 km away

  • HANEY 4

    479 bbl last 12 months · 0.6 km away

  • TULLOS

    78 bbl last 12 months · 1.1 km away

  • DRESDEN UNIT

    122,348 bbl last 12 months · 1.1 km away

  • NORMANDY UNIT

    140,186 bbl last 12 months · 1.2 km away

Drilling permits within 10 km

How to read this page

Questions owners ask

What is a decimal interest?

It is your share of the whole lease, written as a decimal. A 1/4 royalty on 5 net acres in a 1,280-acre unit is 1/4 × 5 ÷ 1,280 = 0.00097656. Your division order states yours.

How do I use this page to check a royalty check?

Take the “Oil sold” volume for the month the check covers and multiply it by your decimal. The answer should match the barrels on your statement. If it does not, upload the statement and we will show where the two differ.

Why is the newest month Apr 2023?

The Railroad Commission publishes production two to three months after the fact and revises recent months. We re-pull the latest three months on every update.

Does this page show what my check should be?

No. It shows what the state recorded. Prices, fees and taxes depend on your lease and on what your operator gets for the oil and gas. The estimator gives a ceiling to compare against.

Sources and method

Where these numbers come from

  • Production and disposition by month: Texas Railroad Commission Production Data Query, oil lease 16927, district 7C, reported through Jul 2026.
  • Wells: Texas Railroad Commission Wellbore Query.
  • Prices: U.S. Energy Information Administration, WTI Cushing spot and Henry Hub spot, monthly.
  • Page updated Sep 28, 2026.

We show the state’s numbers as filed. Where the state has no report for a month, we say so instead of guessing.