A-82 · CLEMENTS, J1A-82CLEMENTS, JHARDIN · 80 ACRESN500 m29.1704° N 96.0191° W · PHOTO: U.S. GEOLOGICAL SURVEY

Texas gas wellRRC 03-291345Last oil or gas reported May 2022

Hardin

The lease produced 113,693 thousand cubic feet of gas in its last 12 months on record, through June 2022. No report after June 2022 is on file; the State's newest month is August 2026.

Is your family on this lease?

Email me when this lease changesI own here

1 location is linked by a filed completion. The primary well record can name a different lease.

County
Wharton
On record since
May 2021
Newest report on file
June 2022
Unit on the newest permit
80 acres

Outline: the original land surveys this lease's wells sit in. The State publishes no lease outlines. RRC surveys, 2026-09-29.

Eight things the public record says about this lease. Each one sets two records side by side, and one that finds nothing still shows and says so. Photo: U.S. Geological Survey.

No oil or gas reported in the 12 months through August 2026

Oil or gas was last reported for May 2022

Its whole life in the Railroad Commission's monthly reports, which start in January 1993; it first reported in May 2021. Royalty owners and their heirs can still be on the county roll after the checks stop.

  1. May 2021First report
  2. 2021The year it sold the most
  3. Forza Operating, LLCLast operator, from May 2021
  4. May 2022Last production
  5. 48 monthsNo oil or gas reported, June 2022 to May 2026
130,557

thousand cubic feet of gas sold since May 2021.

$599,000

what it all sold for at each month's public prices, 100% of the lease.

SourceRailroad Commission production reports since January 1993 (oil and gas sold); EIA prices, through August 2026.

The story, from 14 monthly reports

2021 to 2022: it sold the most in 2021

Gas sold each month since May 2021The numbers match the paragraphs below
20221May 2021220213June 2022May 2021 onward

May 2021: the first month the lease sold gas on record, 7,118 thousand cubic feet.

2021: the year the lease sold the most, $414,000 of oil and gas at public prices.

June 2022 is the newest monthly production report on file.

SourceRailroad Commission production reports, May 2021 through June 2022. Not a forecast, not reserves.

Checks stopped on this lease?

Wells

The one well on this lease is marked plugged.

SourceRailroad Commission production, P-5 and P-4 records, data through August 2026.See why checks stop on this lease

14 months against 7 other recordsNew

Every month since May 2021, and what else happened that month

The lease is the line on top. Under it, on the same clock: the weather, the State, the price, the wells next door, who ran the lease, who bought from it and the rest of the field. Move across it.

Apr 2022
4,022 mcf · down 49.3% on the three months before
Gas averaged $6.60 an mcf · Forza Operating, LLC
  • Nothing else on record this month.
SINCEMAY 2021202204,0008,00012,00016,000MCF A MONTHLAST 12 MONTHS12WEATHERTHE STATEGAS PRICENEXT DOOROPERATORBUYERSTHE FIELDForza Operating, LLC2022
Two drops

Move the pointer or drag across the chart. The numbered buttons jump to each drop.

Monthly gas sold from this lease since May 2021, with seven record tracks beneath it. Use the left and right arrow keys to move month by month.. 14 months from May 2021 to June 2022. The most in one month: 14,523 mcf, July 2021. The newest month: 0 mcf. 1 month with nothing reported. Moments marked: 1, Mar 2022; 2, Apr 2022.

SourcesProduction, cut-offs, operators and buyers: Railroad Commission of Texas. Weather: NOAA. Prices: U.S. Energy Information Administration. Fracs: FracFocus. A record in the same month is not proof of a cause. Through June 2022.

Royalty Watch tells you the month a drop starts, with the records from that month.Watch this lease

61 months, one line eachNew

No production was reported from June 2022 through May 2026

A gap is a month with no oil and no gas reported. Many leases end after 60 to 90 days without production unless the lease says otherwise.

48

months in a row with nothing reported, from June 2022 through May 2026. Of the 48 months, 1 with a report on file showing no oil and no gas and 47 with no report on file.

4,864

thousand cubic feet of gas on the newest report on file with oil or gas, for May 2022. The one report on file after it, for June 2022, shows no oil and no gas. No report after June 2022 is on file; the State's newest month is August 2026.

13

of 61 months with oil or gas reported since May 2021.

May 2021Taller line, more gas soldMay 2026
20222023202420252026ENLARGED BELOW

A shut-in payment or work on the wells can keep a lease alive through a gap. Your own lease paper decides.

SourceRailroad Commission production reports, May 2021 through May 2026. The newest months, after May 2026, are left out of the count because reports arrive late.

Royalty Watch tells you when a silent month starts, and drafts the letter asking whether the lease is still in force.Watch this lease

2 years of state records, 2021 to 2022

Sold since May 2021

$599,000

Sales at public prices before tax and deductions. Multiply by your decimal interest to estimate your share.

Gas sold
130,557thousand cubic feet
Best year
2021$414,000 sold
Sold each year, at that month's pricesOilGas
What the oil and gas from this lease sold for each year, 2021 to 2022, at each month's public prices.
YearOil, dollarsGas, dollarsTotal
2021$0$414,000$414,000, sold the most
2022, 2022 so far$0$184,000$184,000

Did a relative own a share of this lease?

The bars show every year. Pick one to add up what the lease has sold since.

SourcesRailroad Commission Production Data Query, every monthly report since May 2021. EIA monthly WTI and Henry Hub prices. 2022 is part of a year, drawn lighter. Not a forecast, not reserves.

The newest well, seen from the side

No well on the way.

No dated well completion is on file for this lease.

  1. Permit filedNot on file
  2. Drilling startedNot on file
  3. FrackedNot on file
  4. Completion filedNot on file
  5. First production on the leaseNot on file
  6. First checkNot on file

SourcesRailroad Commission drilling permits and well records, and the FracFocus registry. Lease record built November 17, 2026.

Royalty Watch follows new well permits and completions on this lease.Watch this lease

About 6 miles across

Wells on this lease and around it

1this lease, ringed
138producing
0fracked and waiting
2permits, last 24 months
79plugged
15original land surveys

For a lawyer, a buyer or a probate file. Wells and permits within about 2 miles. Railroad Commission of Texas, FracFocus and USGS imagery.

Use this map on your site

You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.

Download the picture (WebP)
<a href="https://royaltyclerk.com/texas/leases/hardin-03-291345-g"><img src="https://royaltyclerk.com/maps/lease-wells/hardin-03-291345-g.svg" alt="Map of the Hardin lease in Wharton County, Texas: its well ringed, among 232 wells and 2 recent drilling locations in a picture about 6 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/leases/hardin-03-291345-g">Wells on the Hardin lease, Wharton County, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>

From the State's well records

Wells on this lease

No wells are linked to this lease in the State’s well records. Production is still reported at lease level.

SourceRailroad Commission wellbore and completion records.

Other leases on these wells

The Railroad Commission files the same API numbers under these leases too: a well keeps its number when it moves into a unit or is recompleted under another lease. A deed older than the unit may name one of them.

Hardin (Wharton County, 1 shared well) · Hardin (Wharton County, 1 shared well) · Hardin (Wharton County, 1 shared well) · Hardin (Wharton County, 1 shared well) · Hardin (Wharton County, 1 shared well)

What the drilling permits say

80acres on the newest permit

80 ACRES
  • 80 acres, on the 2024 permits
Worth asking

A Rule 37 case is listed The RRC permit records list a Rule 37 case. This does not establish your royalty share. Ask for the permit and unit plat for your well.

Check your decimal on this lease

Gas · last sale month, May 2022 New

Four prices for the same gas

Last sale May 2022. Henry Hub $8.14 in May 2022, the last sale month.

$8.14
The marketEIA Henry Hub, May 2022, the last sale month
not on file
Told its investorsNo comparable investor filing on file.
not on file yet
Told the tax officeTexas Comptroller, this lease
?
Your statementOnly you hold this one.

Texas Comptroller

Lower tax on record?

No lower tax approval appears on the Comptroller’s list for this lease.

EIA record dated October 1, 2026

Estimate your royalty

Type the decimal from your division order

The starting decimal is an example. Nothing you type here leaves this page.

$178a month

At these prices the whole lease’s reported sales were about $546,000 over 12 reported months. Your estimated share is $2,130 before taxes and deductions.

Monthly owner volumes and values
Estimated share before tax and deductions
MonthOil (bbl)Oil valueGas (mcf)Gas valueTotal
June 20220$0.000$0.00$0.00
May 20220$0.0019$154.66$154.66
April 20220$0.0015.7109$103.69$103.69
March 20220$0.0023.3047$114.19$114.19
February 20220$0.0031.0117$145.44$145.44
January 20220$0.0046.1641$202.20$202.20
December 20210$0.0042.1289$158.40$158.40
November 20210$0.0049.7148$251.06$251.06
October 20210$0.0051.4258$283.36$283.36
September 20210$0.0055.0156$283.88$283.88
August 20210$0.0053.9063$219.40$219.40
July 20210$0.0056.7305$217.85$217.85

SourcesRailroad Commission monthly production, EIA Henry Hub, SEC filings and Texas Comptroller records.

Watch Plus sets public prices beside the price on your statement.See Watch Plus

Who takes the oil and gasNew

No buyer shares an owner with the operator

The State lists who gathers and who buys from each lease. Company filings list who owns whom. Here they are on one drawing.

GAS
Runs the leaseForza Operating, LLCsince May 2021
Gathers and buys 100%WHITE OAK OPERATING COMPANY LLCsince May 2021

No shared owner, officer or address on record between the gas buyers and the operator.

SourcesBuyers and gatherers: Railroad Commission Form P-4 records, as of October 24, 2026. Ownership: U.S. Securities and Exchange Commission filings.

Royalty Watch tells you the day the buyer of your oil or gas changes.Watch this lease

Seen from space

Heat at the pad, beside reported gas use

A-82 · CLEMENTS, JONE SATELLITE PIXEL, ABOUT 375 M
DAYNIGHT

Satellite match

Not matched

The lease’s newest month on record, June 2022, is before the satellites’ record begins in February 2024.

—

nights of heat

—

months with reported flaring (disposition records unavailable)

—

months with heat and none reported

SourcesNOAA VIIRS night readings and Railroad Commission gas disposition reports. Satellite record through November 16, 2026.

Watch Plus checks statement months beside the satellite record.See Watch Plus

Where the gas went, month by month

All of the gas went to a transmission line in the last 12 months

Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.

All of the gas went to a transmission line in the last 12 monthsShare of Hardin gas by disposition code each month, May 2021 to May 2022. All of the gas went to a transmission line in the last 12 months.Share of the lease’s gas by disposition code, per month0%50%100%Jul 21OctJan 22Apr
All of the gas went to a transmission line in the last 12 monthsShare of Hardin gas by disposition code each month, May 2021 to May 2022. All of the gas went to a transmission line in the last 12 months.Share of gas by disposition code0%50%100%Jul 21Jan 22

SourcesRailroad Commission production reports, gas disposition by code, May 2021 to May 2022.

The county appraisal roll

No public roll figures

County mineral roll

No public roll figures

There are no publishable figures for this lease from the 2026 county mineral roll.

Royalty Clerk has mineral rolls for 158 Texas counties.

Source County appraisal district mineral rolls.

From the state record

Ask a question about Hardin

The available public records have no additional lease-specific answers as of November 23, 2026.

Every monthly report the State holds

14 months, newest first

Ledger for Hardin
MonthGas soldthousand cubic feetFlared or ventedthousand cubic feetSold forat public prices
JuneJun 2022No oil or gas reported
MayMay 20224,8640$39,600
AprilApr 20224,0220$26,500
MarchMar 20225,9660$29,200
FebruaryFeb 20227,9390$37,200
JanuaryJan 202211,8180$51,800
DecemberDec 202110,7850$40,600
NovemberNov 202112,7270$64,300
OctoberOct 202113,1650$72,500
SeptemberSep 202114,0840$72,700
AugustAug 202113,8000$56,200
JulyJul 202114,5230$55,800
JuneJun 20219,7460$31,800
MayMay 20217,1180$20,700

SourcesTexas Railroad Commission Production Data Query, through June 2022. Prices: EIA.

Do your checks match this lease?

Check my statement

Likely owed Jan 2025

A whole month was never paid

The state shows 28,175 bbl of oil sold from this lease in January 2025, so your share is 27.51 bbl. No statement covers January 2025. That is the month the operator changed from Endeavor Energy Resources to Diamondback.

Ask Diamondback owner relations: is January 2025 being held in suspense after the change of operator?

$2,277oil + gas

A sample finding, from our example check. The full example found $3,328 likely owed.

Around this lease

Nearby

New drilling permits in Wharton County

  • CAROLYN LANGE #4new drill · MB Energy, LLC · Nov 6, 2026
  • APPLING #1new drill · Paloma Operating, LLC · Aug 26, 2026
  • PIERCE ESTATES #C269new drill · Remora Management, LLC · May 28, 2026
  • BROUSSARD, J. E. NCT-1 #64new drill · Remora Management, LLC · May 20, 2026
  • KAINER HEIRS UNIT #2new drill · MB Energy, LLC · Apr 30, 2026

Same name in district 03

  • Hardin50,654 mcf last 12 months
  • Hardin43,768 mcf last 12 months
  • Hardin15,425 mcf last 12 months
  • Hardinno production in the last 12 months
  • Hardinno production in the last 12 months

Where it sits

This county

Wharton CountyWhartonLavacaFayetteAustinColoradoFort BendJacksonWharton County
Wharton County

Where this page comes from

  • Railroad Commission of Texas production, Form P-4, permits, wells
  • U.S. Energy Information Administration prices
  • NOAA storms and cold
  • U.S. Geological Survey photos