Skip to content
Royalty Clerk

Texas oil lease · RRC district 09 · Lease 21788

Producing

HARMONSON 100

Harmonson 100 is an oil lease in Archer County, Texas, operated by Borderline Operating Corp. in the Anarene, E. (Caddo) field. The Railroad Commission shows 2,392 bbl of oil in the 12 months through Jul 2026.

Oil lease dossier · 3 wells

2,392bbl oil, last 12 months+48% vs prior year
RRC lease
09-21788

Own a share of this lease?

Is your check right?

Upload a check stub or a phone photo. We compare every month with the state numbers on this page.

Check my statement

Free. No account needed. Two to four pages.

Where it sits

This county

Archer CountyArcherBaylorJackClayWilbargerWichitaArcher County
Archer County · RRC district 09Open Archer County →
Gas, last 12 months
5,272 mcf
Oil in Jul 2026
182 bbl
Reporting to the state
since Jan 2020
Wells
3

Production

Month by month, from the state record

What the Railroad Commission says this oil lease produced. Oil is in barrels (bbl). Gas is in thousand cubic feet (mcf).

Oil output rose 48% over the last 12 months

2,392 bbl in the 12 months through Jul 2026, against 1,620 bbl in the 12 months before.

  • Oil (bars, left axis)
  • Gas (line, right axis)
  • Last 12 months
Oil output rose 48% over the last 12 monthsMonthly oil production and gas for HARMONSON 100, Aug 2023 to Jul 2026. Oil output rose 48% over the last 12 months. 2,392 bbl in the 12 months through Jul 2026, against 1,620 bbl in the 12 months before.Last 12 months: 2,392 bblbbl per monthmcf per month002002504005006007508001,000Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output rose 48% over the last 12 monthsMonthly oil production and gas for HARMONSON 100, Aug 2023 to Jul 2026. Oil output rose 48% over the last 12 months. 2,392 bbl in the 12 months through Jul 2026, against 1,620 bbl in the 12 months before.Last 12 monthsbbl per monthmcf per month002002504005006007508001,000Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, oil lease 21788, district 09. Reported through Jul 2026. The state revises recent months.

Gas disposition

Where the gas went

Every month the operator tells the state where each mcf of gas went, using a code. The code decides how your gas is paid.

All of the gas went to a processing plant in the 7 months reported

Each bar is one month. Colors are the disposition codes the operator reported.

All of the gas went to a processing plant in the 7 months reportedShare of HARMONSON 100 gas by disposition code each month, Aug 2023 to Jul 2026. All of the gas went to a processing plant in the 7 months reported. Share of the lease’s gas by disposition code, per month0%50%100%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
All of the gas went to a processing plant in the 7 months reportedShare of HARMONSON 100 gas by disposition code each month, Aug 2023 to Jul 2026. All of the gas went to a processing plant in the 7 months reported. Share of gas by disposition code0%50%100%Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas disposition by code, lease 21788, district 09. Reported through Jul 2026.

Processing plant (3)

Sent to a gas plant that pulls out natural gas liquids. Your statement should show plant products, and may show processing fees.

None of the gas was flared in the 7 months reported.

Operator history

Who has run this lease

The operator runs the wells and pays your royalty. When the operator changes, payments often slip for a month or two.

The operator changed once, most recently in Sep 2025

If your statements skip or shrink around a change, ask the new operator's owner relations department whether the month is in suspense.

Operators of this lease over timeWalsh & Watts, Inc., Jan 2020 to Aug 2025; Borderline Operating Corp., Sep 2025 to Jul 20262020202120222023202420252026Changed Sep 2025Walsh & Watts, Inc.Jan 2020 to Aug 2025Borderline Operating Corp.Sep 2025 to now
Operators of this lease over timeWalsh & Watts, Inc., Jan 2020 to Aug 2025; Borderline Operating Corp., Sep 2025 to Jul 20262020202120222023202420252026Changed Sep 2025Walsh & Watts, Inc.Jan 2020 to Aug 2025Borderline Operating Corp.Sep 2025 to now

SourceTexas Railroad Commission Production Data Query, operator by month. Reported through Jul 2026.

Wells

3 wells on this lease

Every well the Railroad Commission links to oil lease 21788 in district 09. The API number is the state’s ID for a well.
Wells on HARMONSON 100
API numberWell no.Status
42-009-357651Active
42-009-379702Active
42-009-434031RActive

SourceTexas Railroad Commission Wellbore Query, district 09, lease 21788.

Who buys and gathers

Who moves and buys this lease's production

The operator files a Form P-4 with the Railroad Commission naming the companies authorised to gather and buy the oil and gas. The buyer's price is the one your royalty is figured on.
  • Oil

    True Oil Trucking & Mktg, LLC gathers it.

    100% of it, on the list since Sep 4, 2025

  • Gas from oil wells

    Targa Midstream Services LLC buys and gathers it.

    Targa Midstream Services LLC buys it: 100% of it, on the list since Sep 1, 2026 · Targa Midstream Services LLC gathers it: 100% of it, on the list since Sep 1, 2026

Companies that used to be listed: Energy Transfer Marketing & Term (gathers it, until Sep 4, 2025); Sunoco Ptnrs. Mktg.&terminals LP (gathers it, until Dec 1, 2022); Gulfmark Energy, Inc. (gathers it, until Apr 1, 2019).

SourceRailroad Commission of Texas, Form P-4 file, dated Sep 24, 2026 (source). A listed company is authorised to move or buy the production; the state does not say what it paid.

Unit and wells

100 acres on the newest permit

Acres and wells as the operator filed them on its Railroad Commission drilling permits. Your decimal is your net acres over the unit acres, so this is the number to hold your division order against.
Wells on the permits
31 not plugged
Horizontal
0
First completion
Jan 10, 1982
Latest permit
Sep 16, 2025

The wells on this lease state different acreage

The permits state between 100 and 110 acres. Use the acres from your own division order for the well you are paid on.

Wells and acres on the permits for Harmonson 100
API numberWell no.Acreson the permit
42-009-434031R100
42-009-379702107
42-009-357651110

SourceRailroad Commission of Texas, drilling permits and wellbore file, Sep 26, 2026 (source 1, source 2). The acres are what the operator filed; they are not a survey.

Estimator

Estimate your royalty for this lease

A rough check before you look at a statement: the state volumes times your decimal, priced at WTI and Henry Hub.

Estimator

What could your check be?

Your decimal interest is the small number on your division order that says what share of the whole lease (8/8ths) is yours. Type it in and we apply it to what the state says HARMONSON 100 sold each month.

For example 0.00097656, or a fraction like 1/1024.

Dollars per barrel. Your statements show the gap your operator uses. Leave 0 to price oil at WTI.

Your estimate appears here

Enter your decimal to see an estimated royalty for each of the last 12 months this lease reported. Nothing you type leaves your browser.

An estimate, not your check

It ignores gathering and processing fees, taxes, plant products and the price your operator actually gets, so your statement will differ. Use it as a ceiling to compare against. Regional gas prices are often below Henry Hub.

Ledger

36 months, newest first

Compare these numbers with your statements. Your share of a month is the “Oil sold” volume times your decimal. Scroll sideways on a phone.
Monthly production, disposition and prices for HARMONSON 100
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3Flaredmcf, code 4WTI$ per bblHenry Hub$ per MMBtu
Jul 2026Borderline Operating1821829809800$80.46$2.89
Jun 2026Borderline Operating1701708688680$84.81$3.15
May 2026Borderline Operating3653656966960$102.13$2.94
Apr 2026Borderline Operating1801807217210$100.32$2.77
Mar 2026Borderline Operating3323325835830$91.38$3.04
Feb 2026Borderline Operating5565567607600$64.51$3.62
Jan 2026Borderline Operating6077176646640$60.04$7.72
Dec 2025Borderline Operating00000$57.97$4.26
Nov 2025Borderline Operating00000$60.06$3.79
Oct 2025Borderline Operating00000$60.89$3.19
Sep 2025Borderline Operating00000$63.96$2.97
Aug 2025Walsh &00000$64.86$2.91
Jul 2025Walsh &20000$68.39$3.20
Jun 2025Walsh &00000$68.17$3.02
May 2025Walsh &30000$62.17$3.12
Apr 2025Walsh &00000$63.54$3.42
Mar 2025Walsh &380000$68.24$4.12
Feb 2025Walsh &11000$71.53$4.19
Jan 2025Walsh &151185000$75.74$4.13
Dec 2024Walsh &266373000$70.12$3.01
Nov 2024Walsh &307356000$69.95$2.12
Oct 2024Walsh &350184000$71.99$2.20
Sep 2024Walsh &333366000$70.24$2.28
Aug 2024Walsh &169169000$76.68$1.99
Jul 2024Walsh &326360000$81.80$2.07
Jun 2024Walsh &335361000$79.77$2.54
May 2024Walsh &359361000$80.02$2.12
Apr 2024Walsh &371359000$85.35$1.60
Mar 2024Walsh &404374000$81.28$1.49
Feb 2024Walsh &418367000$77.25$1.72
Jan 2024Walsh &403516000$74.15$3.18
Dec 2023Walsh &502531000$71.90$2.52
Nov 2023Walsh &418356000$77.69$2.71
Oct 2023Walsh &443538000$85.64$2.98
Sep 2023Walsh &468530000$89.43$2.64
Aug 2023Walsh &500532000$81.39$2.58

No report filed More than 3% of gas flared

SourceVolumes: Texas Railroad Commission Production Data Query, reported through Jul 2026. Prices: EIA WTI Cushing spot and Henry Hub spot, monthly, through Aug 2026. “Gas sold” is gas sent to a transmission line (code 2) or a plant (code 3).

Check your statements

Do your checks match this lease?

Upload your statements for HARMONSON 100. We compare volumes, prices, deductions and timing with the state record and give you the exact question to ask Borderline Operating Corp.

  • A month that was never paid
  • Your share of the barrels and mcf
  • The price against WTI and Henry Hub
  • Fees taken on gas
  • Late payment interest

Around this lease

Walk the neighborhood

Everything on this page connects to the operator, field and county records. Start from any of them.

Borderline Operating Corp. in Archer County

All Borderline Operating Corp. leases →

Anarene, E. (Caddo) field

All leases in this field →

Leases within 10 km

Found by the location of their wells.

Drilling permits within 10 km

How to read this page

Questions owners ask

What is a decimal interest?

It is your share of the whole lease, written as a decimal. A 1/4 royalty on 5 net acres in a 1,280-acre unit is 1/4 × 5 ÷ 1,280 = 0.00097656. Your division order states yours.

How do I use this page to check a royalty check?

Take the “Oil sold” volume for the month the check covers and multiply it by your decimal. The answer should match the barrels on your statement. If it does not, upload the statement and we will show where the two differ.

Why is the newest month Jul 2026?

The Railroad Commission publishes production two to three months after the fact and revises recent months. We re-pull the latest three months on every update.

Does this page show what my check should be?

No. It shows what the state recorded. Prices, fees and taxes depend on your lease and on what your operator gets for the oil and gas. The estimator gives a ceiling to compare against.

Sources and method

Where these numbers come from

  • Production and disposition by month: Texas Railroad Commission Production Data Query, oil lease 21788, district 09, reported through Jul 2026.
  • Wells: Texas Railroad Commission Wellbore Query.
  • Prices: U.S. Energy Information Administration, WTI Cushing spot and Henry Hub spot, monthly.
  • Page updated Sep 28, 2026.

We show the state’s numbers as filed. Where the state has no report for a month, we say so instead of guessing.

FAQ

Questions about HARMONSON 100

Who operates the HARMONSON 100 lease?

The Railroad Commission lists Borderline Operating Corp. (operator number 082999) as the operator of this lease in Archer County, Texas. The operator history on this page shows earlier operators and when the record changed.

How much has the HARMONSON 100 lease produced?

The lease reported 2,392 bbl of oil and 5,272 mcf of gas in the last 12 months through Jul 2026. Monthly figures for 36 months are in the ledger on this page, taken from the Railroad Commission's production data.

Does this page show who owns the royalty?

No. Railroad Commission records show who operates a lease and what it reported, not who owns the minerals or receives royalty. Your division order and royalty stub name the lease and your decimal interest.

How do I check my royalty stub against this lease?

Multiply the lease's volume for a month by your decimal interest and compare it with the barrels and mcf on your stub for the same month. The two are seldom identical, since sales and reporting months can differ, but a large gap is worth a question to the operator.

Check my statement