Skip to content

Texas oil lease · RRC district 04 · Lease 14229

Producing

HENDRICKS

Hendricks is an oil lease in Jim Wells County, Texas, operated by Cimarron Engineering, LLC in the Alice, Se. (Scheel) field. The Railroad Commission shows 14,758 bbl of oil in the 12 months through Jul 2026.

Oil lease dossier · 1 well

14,758bbl oil, last 12 months−22% vs prior year
RRC lease
04-14229

Own a share of this lease?

Is your check right?

Upload a check stub or a phone photo. We compare every month with the state numbers on this page.

Check my statement

Free. No account needed. Two to four pages.

Where it sits

This county

Jim Wells CountyJim WellsDuvalMcMullenSan PatricioNuecesKlebergLive OakJim Wells County
Jim Wells County · RRC district 04Open Jim Wells County →
Oil in Jul 2026
1,118 bbl
Reporting to the state
since Jul 2023
Wells
1
Data through
Jul 2026

Production

Month by month, from the state record

What the Railroad Commission says this oil lease produced. Oil is in barrels (bbl). Gas is in thousand cubic feet (mcf).

Oil output fell 22% over the last 12 months

14,758 bbl in the 12 months through Jul 2026, against 18,896 bbl in the 12 months before.

  • Oil (bars, left axis)
  • Last 12 months
Oil output fell 22% over the last 12 monthsMonthly oil production for HENDRICKS, Aug 2023 to Jul 2026. Oil output fell 22% over the last 12 months. 14,758 bbl in the 12 months through Jul 2026, against 18,896 bbl in the 12 months before.Last 12 months: 14,758 bblbbl per month05001,0001,5002,000Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output fell 22% over the last 12 monthsMonthly oil production for HENDRICKS, Aug 2023 to Jul 2026. Oil output fell 22% over the last 12 months. 14,758 bbl in the 12 months through Jul 2026, against 18,896 bbl in the 12 months before.Last 12 monthsbbl per month05001,0001,5002,000Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, oil lease 14229, district 04. Reported through Jul 2026. The state revises recent months.

Gas disposition

Where the gas went

Every month the operator tells the state where each mcf of gas went, using a code. The code decides how your gas is paid.

No gas disposition reported for this lease

The operator has not reported where the gas went in the months we hold.

Operator history

Who has run this lease

The operator runs the wells and pays your royalty. When the operator changes, payments often slip for a month or two.

Cimarron Engineering, LLC has reported this lease for the whole period

No change of operator in the months we hold.

Operators of this lease over timeCimarron Engineering, LLC, Jul 2023 to Jul 2026202420252026Cimarron Engineering, LLCJul 2023 to nowthrough Jul 2026
Operators of this lease over timeCimarron Engineering, LLC, Jul 2023 to Jul 2026202420252026Cimarron Engineering, LLCJul 2023 to nowthrough Jul 2026

SourceTexas Railroad Commission Production Data Query, operator by month. Reported through Jul 2026.

Wells

1 well on this lease

Every well the Railroad Commission links to oil lease 14229 in district 04. The API number is the state’s ID for a well.
Wells on HENDRICKS
API numberWell no.Status
42-249-326681Active

SourceTexas Railroad Commission Wellbore Query, district 04, lease 14229.

Who buys and gathers

Who moves and buys this lease's production

The operator files a Form P-4 with the Railroad Commission naming the companies authorised to gather and buy the oil and gas. The buyer's price is the one your royalty is figured on.
  • Oil

    Genesis Crude Oil, L.p. gathers it.

    100% of it, on the list since Jul 27, 2023

SourceRailroad Commission of Texas, Form P-4 file, dated Sep 24, 2026 (source). A listed company is authorised to move or buy the production; the state does not say what it paid.

Unit and wells

100 acres on the newest permit

Acres and wells as the operator filed them on its Railroad Commission drilling permits. Your decimal is your net acres over the unit acres, so this is the number to hold your division order against.
Wells on the permits
11 not plugged
Horizontal
0
First completion
Jul 27, 2023
Latest permit
May 23, 2023
Wells and acres on the permits for Hendricks
API numberWell no.Acreson the permit
42-249-326681100

SourceRailroad Commission of Texas, drilling permits and wellbore file, Sep 26, 2026 (source 1, source 2). The acres are what the operator filed; they are not a survey.

Estimator

Estimate your royalty for this lease

A rough check before you look at a statement: the state volumes times your decimal, priced at WTI and Henry Hub.

Estimator

What could your check be?

Your decimal interest is the small number on your division order that says what share of the whole lease (8/8ths) is yours. Type it in and we apply it to what the state says HENDRICKS sold each month.

For example 0.00097656, or a fraction like 1/1024.

Dollars per barrel. Your statements show the gap your operator uses. Leave 0 to price oil at WTI.

Your estimate appears here

Enter your decimal to see an estimated royalty for each of the last 12 months this lease reported. Nothing you type leaves your browser.

An estimate, not your check

It ignores gathering and processing fees, taxes, plant products and the price your operator actually gets, so your statement will differ. Use it as a ceiling to compare against.

Ledger

36 months, newest first

Compare these numbers with your statements. Your share of a month is the “Oil sold” volume times your decimal. Scroll sideways on a phone.
Monthly production, disposition and prices for HENDRICKS
MonthOil producedbblOil soldbblWTI$ per bblHenry Hub$ per MMBtu
Jul 2026Cimarron Engineering,1,1181,101$80.46$2.89
Jun 2026Cimarron Engineering,1,0771,093$84.81$3.15
May 2026Cimarron Engineering,1,1331,098$102.13$2.94
Apr 2026Cimarron Engineering,1,0751,102$100.32$2.77
Mar 2026Cimarron Engineering,1,2421,283$91.38$3.04
Feb 2026Cimarron Engineering,1,1331,106$64.51$3.62
Jan 2026Cimarron Engineering,1,3231,296$60.04$7.72
Dec 2025Cimarron Engineering,1,2751,290$57.97$4.26
Nov 2025Cimarron Engineering,1,2741,292$60.06$3.79
Oct 2025Cimarron Engineering,1,3151,275$60.89$3.19
Sep 2025Cimarron Engineering,1,3331,451$63.96$2.97
Aug 2025Cimarron Engineering,1,4601,464$64.86$2.91
Jul 2025Cimarron Engineering,1,4501,460$68.39$3.20
Jun 2025Cimarron Engineering,1,3231,281$68.17$3.02
May 2025Cimarron Engineering,1,2871,271$62.17$3.12
Apr 2025Cimarron Engineering,1,5321,475$63.54$3.42
Mar 2025Cimarron Engineering,1,5641,646$68.24$4.12
Feb 2025Cimarron Engineering,1,4911,477$71.53$4.19
Jan 2025Cimarron Engineering,1,6921,634$75.74$4.13
Dec 2024Cimarron Engineering,1,6741,840$70.12$3.01
Nov 2024Cimarron Engineering,1,6891,462$69.95$2.12
Oct 2024Cimarron Engineering,1,7842,036$71.99$2.20
Sep 2024Cimarron Engineering,1,6051,472$70.24$2.28
Aug 2024Cimarron Engineering,1,8051,824$76.68$1.99
Jul 2024Cimarron Engineering,1,6641,996$81.80$2.07
Jun 2024Cimarron Engineering,1,5661,271$79.77$2.54
May 2024Cimarron Engineering,1,6801,639$80.02$2.12
Apr 2024Cimarron Engineering,1,6321,642$85.35$1.60
Mar 2024Cimarron Engineering,1,4971,650$81.28$1.49
Feb 2024Cimarron Engineering,1,4571,290$77.25$1.72
Jan 2024Cimarron Engineering,1,1751,304$74.15$3.18
Dec 2023Cimarron Engineering,1,2721,127$71.90$2.52
Nov 2023Cimarron Engineering,923917$77.69$2.71
Oct 2023Cimarron Engineering,784903$85.64$2.98
Sep 2023Cimarron Engineering,650531$89.43$2.64
Aug 2023Cimarron Engineering,480356$81.39$2.58

No report filed More than 3% of gas flared

SourceVolumes: Texas Railroad Commission Production Data Query, reported through Jul 2026. Prices: EIA WTI Cushing spot and Henry Hub spot, monthly, through Aug 2026. “Gas sold” is gas sent to a transmission line (code 2) or a plant (code 3).

Check your statements

Do your checks match this lease?

Upload your statements for HENDRICKS. We compare volumes, prices, deductions and timing with the state record and give you the exact question to ask Cimarron Engineering, LLC.

  • A month that was never paid
  • Your share of the barrels and mcf
  • The price against WTI and Henry Hub
  • Fees taken on gas
  • Late payment interest

Around this lease

Walk the neighborhood

Everything on this page connects to the operator, field and county records. Start from any of them.

Cimarron Engineering, LLC in Jim Wells County

All Cimarron Engineering, LLC leases →

Alice, Se. (Scheel) field

All leases in this field →

Leases within 10 km

Found by the location of their wells.

Drilling permits within 10 km

How to read this page

Questions owners ask

What is a decimal interest?

It is your share of the whole lease, written as a decimal. A 1/4 royalty on 5 net acres in a 1,280-acre unit is 1/4 × 5 ÷ 1,280 = 0.00097656. Your division order states yours.

How do I use this page to check a royalty check?

Take the “Oil sold” volume for the month the check covers and multiply it by your decimal. The answer should match the barrels on your statement. If it does not, upload the statement and we will show where the two differ.

Why is the newest month Jul 2026?

The Railroad Commission publishes production two to three months after the fact and revises recent months. We re-pull the latest three months on every update.

Does this page show what my check should be?

No. It shows what the state recorded. Prices, fees and taxes depend on your lease and on what your operator gets for the oil and gas. The estimator gives a ceiling to compare against.

Sources and method

Where these numbers come from

  • Production and disposition by month: Texas Railroad Commission Production Data Query, oil lease 14229, district 04, reported through Jul 2026.
  • Wells: Texas Railroad Commission Wellbore Query.
  • Prices: U.S. Energy Information Administration, WTI Cushing spot and Henry Hub spot, monthly.
  • Page updated Sep 28, 2026.

We show the state’s numbers as filed. Where the state has no report for a month, we say so instead of guessing.