Skip to content

Texas oil lease · RRC district 03 · Lease 28010

Producing

HOWARD-MOORE UNIT

Howard-Moore Unit is an oil lease in Madison County, Texas, operated by Vess Oil Corporation in the Madisonville, W. (Woodbine -A-) field. The Railroad Commission shows 19,408 bbl of oil in the 12 months through Jul 2026.

Oil lease dossier · 1 well

19,408bbl oil, last 12 months−29% vs prior year
RRC lease
03-28010

Own a share of this lease?

Is your check right?

Upload a check stub or a phone photo. We compare every month with the state numbers on this page.

Check my statement

Free. No account needed. Two to four pages.

Where it sits

This county

Madison CountyMadisonWalkerLimestoneHoustonLeonBrazosRobertsonMadison County
Madison County · RRC district 03Open Madison County →
Gas, last 12 months
7,423 mcf
Oil in Jul 2026
1,439 bbl
Reporting to the state
since Sep 2022
Wells
1

Production

Month by month, from the state record

What the Railroad Commission says this oil lease produced. Oil is in barrels (bbl). Gas is in thousand cubic feet (mcf).

Oil output fell 29% over the last 12 months

19,408 bbl in the 12 months through Jul 2026, against 27,500 bbl in the 12 months before.

  • Oil (bars, left axis)
  • Gas (line, right axis)
  • Last 12 months
Oil output fell 29% over the last 12 monthsMonthly oil production and gas for HOWARD-MOORE UNIT, Aug 2023 to Jul 2026. Oil output fell 29% over the last 12 months. 19,408 bbl in the 12 months through Jul 2026, against 27,500 bbl in the 12 months before.Last 12 months: 19,408 bblbbl per monthmcf per month001,0005002,0001,0003,0001,5004,0002,000Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output fell 29% over the last 12 monthsMonthly oil production and gas for HOWARD-MOORE UNIT, Aug 2023 to Jul 2026. Oil output fell 29% over the last 12 months. 19,408 bbl in the 12 months through Jul 2026, against 27,500 bbl in the 12 months before.Last 12 monthsbbl per monthmcf per month001,0005002,0001,0003,0001,5004,0002,000Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, oil lease 28010, district 03. Reported through Jul 2026. The state revises recent months.

Gas disposition

Where the gas went

Every month the operator tells the state where each mcf of gas went, using a code. The code decides how your gas is paid.

Since Nov 2024 the lease's gas goes to a processing plant instead of other uses

Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.

  • Processing plant (3)
  • Lease fuel (1)
  • Other (5 to 8)
Since Nov 2024 the lease's gas goes to a processing plant instead of other usesShare of HOWARD-MOORE UNIT gas by disposition code each month, Aug 2023 to Jul 2026. Since Nov 2024 the lease's gas goes to a processing plant instead of other uses. Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.Share of the lease’s gas by disposition code, per month0%50%100%Nov 2024: other to plantOct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Since Nov 2024 the lease's gas goes to a processing plant instead of other usesShare of HOWARD-MOORE UNIT gas by disposition code each month, Aug 2023 to Jul 2026. Since Nov 2024 the lease's gas goes to a processing plant instead of other uses. Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.Share of gas by disposition code0%50%100%Nov 24: other to plantJan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, gas disposition by code, lease 28010, district 03. Reported through Jul 2026.

Processing plant (3)

Sent to a gas plant that pulls out natural gas liquids. Your statement should show plant products, and may show processing fees.

Lease fuel (1)

Burned to run equipment on the lease. Not sold, so it pays no royalty. A few percent is normal.

Other (5 to 8)

Gas lift, repressure, carbon black or another use the operator reported.

None of the gas was flared in the last 12 months.

Operator history

Who has run this lease

The operator runs the wells and pays your royalty. When the operator changes, payments often slip for a month or two.

Vess Oil Corporation has reported this lease for the whole period

No change of operator in the months we hold.

Operators of this lease over timeVess Oil Corporation, Sep 2022 to Jul 20262023202420252026Vess Oil CorporationSep 2022 to nowthrough Jul 2026
Operators of this lease over timeVess Oil Corporation, Sep 2022 to Jul 20262023202420252026Vess Oil CorporationSep 2022 to nowthrough Jul 2026

SourceTexas Railroad Commission Production Data Query, operator by month. Reported through Jul 2026.

Wells

1 well on this lease

Every well the Railroad Commission links to oil lease 28010 in district 03. The API number is the state’s ID for a well.
Wells on HOWARD-MOORE UNIT
API numberWell no.Status
42-313-313881HActive

SourceTexas Railroad Commission Wellbore Query, district 03, lease 28010.

Who buys and gathers

Who moves and buys this lease's production

The operator files a Form P-4 with the Railroad Commission naming the companies authorised to gather and buy the oil and gas. The buyer's price is the one your royalty is figured on.
  • Oil

    Energy Trans Crude Marketing LLC gathers it.

    100% of it, on the list since Sep 18, 2022

  • Gas from oil wells

    Energy Transfer Company buys and gathers it.

    Energy Transfer Company buys it: 100% of it, on the list since Sep 18, 2022 · Energy Transfer Company gathers it: 100% of it, on the list since Sep 18, 2022

SourceRailroad Commission of Texas, Form P-4 file, dated Sep 24, 2026 (source). A listed company is authorised to move or buy the production; the state does not say what it paid.

Unit and wells

1,176.55 acres on the newest permit

Acres and wells as the operator filed them on its Railroad Commission drilling permits. Your decimal is your net acres over the unit acres, so this is the number to hold your division order against.
Wells on the permits
11 not plugged
Horizontal
1
First completion
Sep 18, 2022
Latest permit
Mar 24, 2022

An allocation well is on this lease

A well drilled across several tracts shares its production by an allocation formula, so the decimal is not always your acres over the unit acres. Ask the operator for the allocation formula and the tract factor for your land.

Wells and acres on the permits for Howard-Moore Unit
API numberWell no.Acreson the permit
42-313-313881H1,176.55

SourceRailroad Commission of Texas, drilling permits and wellbore file, Sep 26, 2026 (source 1, source 2). The acres are what the operator filed; they are not a survey.

Estimator

Estimate your royalty for this lease

A rough check before you look at a statement: the state volumes times your decimal, priced at WTI and Henry Hub.

Estimator

What could your check be?

Your decimal interest is the small number on your division order that says what share of the whole lease (8/8ths) is yours. Type it in and we apply it to what the state says HOWARD-MOORE UNIT sold each month.

For example 0.00097656, or a fraction like 1/1024.

Dollars per barrel. Your statements show the gap your operator uses. Leave 0 to price oil at WTI.

Your estimate appears here

Enter your decimal to see an estimated royalty for each of the last 12 months this lease reported. Nothing you type leaves your browser.

An estimate, not your check

It ignores gathering and processing fees, taxes, plant products and the price your operator actually gets, so your statement will differ. Use it as a ceiling to compare against. Regional gas prices are often below Henry Hub.

Ledger

36 months, newest first

Compare these numbers with your statements. Your share of a month is the “Oil sold” volume times your decimal. Scroll sideways on a phone.
Monthly production, disposition and prices for HOWARD-MOORE UNIT
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3Flaredmcf, code 4WTI$ per bblHenry Hub$ per MMBtu
Jul 2026Vess Oil1,4391,3863713450$80.46$2.89
Jun 2026Vess Oil1,4231,4285024630$84.81$3.15
May 2026Vess Oil1,5011,4645354990$102.13$2.94
Apr 2026Vess Oil1,4971,4175454990$100.32$2.77
Mar 2026Vess Oil1,5951,6126496030$91.38$3.04
Feb 2026Vess Oil1,5481,5867286680$64.51$3.62
Jan 2026Vess Oil1,5661,6236796250$60.04$7.72
Dec 2025Vess Oil1,7101,6186936400$57.97$4.26
Nov 2025Vess Oil1,7261,7867246770$60.06$3.79
Oct 2025Vess Oil1,7491,7846255740$60.89$3.19
Sep 2025Vess Oil1,8301,7677487020$63.96$2.97
Aug 2025Vess Oil1,8241,7816245680$64.86$2.91
Jul 2025Vess Oil1,9281,9957246800$68.39$3.20
Jun 2025Vess Oil1,9771,9714774280$68.17$3.02
May 2025Vess Oil2,1152,1337817340$62.17$3.12
Apr 2025Vess Oil2,1962,1379548870$63.54$3.42
Mar 2025Vess Oil2,7512,7041,3751,2900$68.24$4.12
Feb 2025Vess Oil2,6692,6679177900$71.53$4.19
Jan 2025Vess Oil2,2262,0749085420$75.74$4.13
Dec 2024Vess Oil2,2222,3446154800$70.12$3.01
Nov 2024Vess Oil2,2922,1356384530$69.95$2.12
Oct 2024Vess Oil2,3082,3159944170$71.99$2.20
Sep 2024Vess Oil2,3832,3241,0966570$70.24$2.28
Aug 2024Vess Oil2,4332,3189727810$76.68$1.99
Jul 2024Vess Oil2,3812,3091,1471,0650$81.80$2.07
Jun 2024Vess Oil2,3892,4591,0009320$79.77$2.54
May 2024Vess Oil2,5582,4601,1141,0310$80.02$2.12
Apr 2024Vess Oil2,6442,5081,1298680$85.35$1.60
Mar 2024Vess Oil2,7312,6911,2401,1620$81.28$1.49
Feb 2024Vess Oil2,6462,7181,1401,0710$77.25$1.72
Jan 2024Vess Oil2,8942,8891,0969410$74.15$3.18
Dec 2023Vess Oil2,8652,7171,0419780$71.90$2.52
Nov 2023Vess Oil2,8732,8791,2601,1820$77.69$2.71
Oct 2023Vess Oil3,1903,2271,4131,3280$85.64$2.98
Sep 2023Vess Oil3,2083,0441,4341,3480$89.43$2.64
Aug 2023Vess Oil3,6033,5641,6881,5830$81.39$2.58

No report filed More than 3% of gas flared

SourceVolumes: Texas Railroad Commission Production Data Query, reported through Jul 2026. Prices: EIA WTI Cushing spot and Henry Hub spot, monthly, through Aug 2026. “Gas sold” is gas sent to a transmission line (code 2) or a plant (code 3).

Check your statements

Do your checks match this lease?

Upload your statements for HOWARD-MOORE UNIT. We compare volumes, prices, deductions and timing with the state record and give you the exact question to ask Vess Oil Corporation.

  • A month that was never paid
  • Your share of the barrels and mcf
  • The price against WTI and Henry Hub
  • Fees taken on gas
  • Late payment interest

Around this lease

Walk the neighborhood

Everything on this page connects to the operator, field and county records. Start from any of them.

Vess Oil Corporation in Madison County

All Vess Oil Corporation leases →

Madisonville, W. (Woodbine -A-) field

All leases in this field →

Leases within 10 km

Found by the location of their wells.

Drilling permits within 10 km

How to read this page

Questions owners ask

What is a decimal interest?

It is your share of the whole lease, written as a decimal. A 1/4 royalty on 5 net acres in a 1,280-acre unit is 1/4 × 5 ÷ 1,280 = 0.00097656. Your division order states yours.

How do I use this page to check a royalty check?

Take the “Oil sold” volume for the month the check covers and multiply it by your decimal. The answer should match the barrels on your statement. If it does not, upload the statement and we will show where the two differ.

Why is the newest month Jul 2026?

The Railroad Commission publishes production two to three months after the fact and revises recent months. We re-pull the latest three months on every update.

Does this page show what my check should be?

No. It shows what the state recorded. Prices, fees and taxes depend on your lease and on what your operator gets for the oil and gas. The estimator gives a ceiling to compare against.

Sources and method

Where these numbers come from

  • Production and disposition by month: Texas Railroad Commission Production Data Query, oil lease 28010, district 03, reported through Jul 2026.
  • Wells: Texas Railroad Commission Wellbore Query.
  • Prices: U.S. Energy Information Administration, WTI Cushing spot and Henry Hub spot, monthly.
  • Page updated Sep 28, 2026.

We show the state’s numbers as filed. Where the state has no report for a month, we say so instead of guessing.