Skip to content
A-4809 · SEC. 24 · BLK G · GWT&P RR CO8A-4809SEC. 24 · BLK G · GWT&P RR COHUNT 24 · 721 ACRESN500 m30.3747° N 100.9700° W · PHOTO: U.S. GEOLOGICAL SURVEY

Texas gas wellRRC 7C-225084

Hunt 24

One well on 721 acres in Crockett County. The lease produced 2,356 thousand cubic feet of gas in its last 12 months on record, through August 2026. No report after August 2026 is on file; the State's newest month is September 2026.

Is your family on this lease?

Email me when this lease changesI own here

County
Crockett
On record since
August 2006
Newest report on file
August 2026
Unit on the newest permit
721 acres

Outline: the original land surveys this lease's wells sit in. The State publishes no lease outlines. RRC surveys, 2026-09-29.

What the checks found on this lease

  • 6 silent months. March to August 2026.
  • 3 drops in production have no other record beside them in the same month, of 5 on record.
  • The gas buyer and the operator share an officer. A price set between two companies with one owner is worth checking against the market.
  • A lower tax rate. The State approved a lower severance tax on this lease's production within the last two years. The part below shows which wells and months it covers; the tax line on a statement should follow it.

Checked, nothing found: operator changes, heat from space and new wells.

Royalty Watch tells you the month any of this changes on your own lease: a silent month, a drop, a new buyer or a well's next stage.Watch this lease

Eight things the public record says about this lease. Each one sets two records side by side, and one that finds nothing still shows and says so. Photo: U.S. Geological Survey.

The story, from 241 monthly reports

2006 to 2026: it sold the most in 2008

Gas sold each month since August 2006The numbers match the paragraphs below
20102015202020251Aug 2006220083Oct 20144Apr 20195August 2026Aug 2006 onward

August 2006: the first month the lease sold gas on record, 2,994 thousand cubic feet.

2008: the year the lease sold the most, $371,000 of oil and gas at public prices.

October 2014: Enervest Operating, L.L.C. took over.

April 2019: Upp Operating, LLC took over from Enervest Operating, L.L.C..

August 2026 is the newest monthly production report on file.

SourceRailroad Commission production reports, August 2006 through September 2026. Not a forecast, not reserves.

Checks stopped on this lease?

Sales

No sales reported for the last 7 months of state data (through Sep 2026).

SourceRailroad Commission production, P-5 and P-4 records, data through September 2026.See why checks stop on this lease

242 months against 7 other recordsNew

Every month since August 2006, and what else happened that month

The lease is the line on top. Under it, on the same clock: the weather, the State, the price, the wells next door, who ran the lease, who bought from it and the rest of the field. Move across it.

Mar 2019
525 mcf · down 59.1% on the three months before
Gas averaged $2.95 an mcf · Enervest Operating, L.L.C.
  • OperatorThe lease changed hands in April 2019, from Enervest Operating, L.L.C. to Upp Operating, LLC.
SINCEAUG 2006201020152020202504008001,2001,600MCF A MONTHLAST 12 MONTHS12345WEATHERTHE STATEGAS PRICENEXT DOOROPERATORBUYERSTHE FIELDEnervest Operating, L.L.C.Upp Operating, LLC2017201820192020202120222023202420252026
Five drops

Move the pointer or drag across the chart. The numbered buttons jump to each drop.

Monthly gas sold from this lease since August 2006, with seven record tracks beneath it. Use the left and right arrow keys to move month by month.. 242 months from August 2006 to September 2026. The most in one month: 8,457 mcf, September 2006. The newest month: 0 mcf. 7 months with nothing reported. Moments marked: 1, Dec 2006; 2, Mar 2007; 3, Aug 2010; 4, Feb 2019; 5, Mar 2019.

SourcesProduction, cut-offs, operators and buyers: Railroad Commission of Texas. Weather: NOAA. Prices: U.S. Energy Information Administration. Fracs: FracFocus. A record in the same month is not proof of a cause. Through September 2026. The newest report on file for this lease is for August 2026; no report after it is on file.

241 months, one line eachNew

No production was reported from March 2026 through August 2026

A gap is a month with no oil and no gas reported. Many leases end after 60 to 90 days without production unless the lease says otherwise.

6

months in a row with nothing reported, from March 2026 through August 2026. Reports are on file for all 6 months, with no oil and no gas.

303

thousand cubic feet of gas on the newest report on file with oil or gas, for February 2026. The 6 reports on file after it, the newest for August 2026, show no oil and no gas. No report after August 2026 is on file; the State's newest month is September 2026.

235

of 241 months with oil or gas reported since August 2006.

6.45

thousand cubic feet of gas a day on average from September 2025 through August 2026, counting a month with no report on file as zero.

August 2006Taller line, more gas soldAugust 2026
2010201520202025ENLARGED BELOW
2025 to 2026, enlarged
20252026MAMJJA6 months, nothing reported

A shut-in payment or work on the wells can keep a lease alive through a gap. Your own lease paper decides.

SourceRailroad Commission production reports, August 2006 through August 2026. The months after May 2026 are counted from this lease's own reports filed since. The newest months, after August 2026, are left out of the count because reports arrive late.

21 years of state records, 2006 to 2026

Sold since August 2006

$1.5million

Sales at public prices before tax and deductions. Multiply by your decimal interest to estimate your share.

Gas sold
304,962thousand cubic feet
Best year
2008$371,000 sold
Sold each year, at that month's pricesOilGas
What the oil and gas from this lease sold for each year, 2006 to 2026, at each month's public prices.
YearOil, dollarsGas, dollarsTotal
2006$0$166,000$166,000
2007$0$249,000$249,000
2008$0$371,000$371,000, sold the most
2009$0$127,000$127,000
2010$0$114,000$114,000
2011$0$92,900$92,900
2012$0$58,700$58,700
2013$0$47,300$47,300
2014$0$43,500$43,500
2015$0$22,600$22,600
2016$0$20,700$20,700
2017$0$22,900$22,900
2018$0$31,000$31,000
2019$0$19,500$19,500
2020$0$13,000$13,000
2021$0$24,800$24,800
2022$0$37,600$37,600
2023$0$13,600$13,600
2024$0$11,700$11,700
2025$0$14,300$14,300
2026, 2026 so far$0$3,880$3,880

Did a relative own a share of this lease?

The bars show every year. Pick one to add up what the lease has sold since.

SourcesRailroad Commission Production Data Query, every monthly report since August 2006. EIA monthly WTI and Henry Hub prices. 2026 is part of a year, drawn lighter. Not a forecast, not reserves.

Who has run this lease

The operator changed three times, most recently in April 2019

The company named on each monthly report to the State. The operator is not always the company that pays.

  1. Upp Operating, LLCApril 2019 to now
  2. Enervest Operating, L.L.C.October 2014 to March 2019
  3. Operator number 385842January 2008 to September 2014
  4. Operator number 222282August 2006 to December 2007

A new operator sets up every owner again before it pays, and often sends a new division order. See what you may sign

SourcesRailroad Commission production reports, the operator on each month’s report, August 2006 through September 2026.

The newest well, seen from the side

No well on the way. Well 8 was completed in August 2006.

ground2,000 ft4,000 ft6,000 ft8,000 ft89,650 ft deep
  1. Permit filedNot on file
  2. Drilling startedNot on file
  3. FrackedNot on file
  4. Completion filedAugust 24, 2006
  5. First production on the leaseNot on file
  6. First checkNot on file

SourcesRailroad Commission drilling permits and well records, and the FracFocus registry. Lease record built November 17, 2026.

About 6 miles across

Wells on this lease and around it

1this lease, ringed
38producing
0fracked and waiting
0permits, last 24 months
0plugged
42original land surveys

For a lawyer, a buyer or a probate file. Wells and permits within about 2 miles. Railroad Commission of Texas, FracFocus and USGS imagery.

Use this map on your site

You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.

Download the picture (WebP)
<a href="https://royaltyclerk.com/texas/leases/hunt-24-7c-225084-g"><img src="https://royaltyclerk.com/maps/lease-wells/hunt-24-7c-225084-g.svg" alt="Map of the Hunt 24 lease in Crockett County, Texas: its well ringed, among 65 wells and 0 recent drilling locations in a picture about 6 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/leases/hunt-24-7c-225084-g">Wells on the Hunt 24 lease, Crockett County, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>

From the State's well records

One well on this lease

Wells on Hunt 24
WellAPI numberCompletedDepthfeetToday
842-105-40018August 20069,650Shut in

SourceRailroad Commission wellbore and completion records.

What the drilling permits say

721acres on the newest permit

721 ACRES
  • 721 acres, on the 2006 permits
Check your decimal on this lease

Gas, August 2026, dollars per thousand cubic feet New

Four prices for the same gas

What the market paid, what the operator told its investors, what it told the tax office for this lease, and the one only you hold.

$2.78
The marketHenry Hub, August 2026
none on file
Told its investorsno public parent's filing on record
not on file yet
Told the tax officeTexas Comptroller, this lease
?
Your statementonly you hold this one
On recordA lower tax is on record

The State approved a lower tax for this lease

Kind
Low Producing Wells
Wells
The whole lease
Runs
November 2009 to no end date on file
Rate
Not given in the file

Look at the tax line on your statement for this lease. The record says which rate applies.

Estimate your royalty

Type the decimal from your division order

The starting decimal is an example. Nothing you type here leaves this page.

$2.89a month

At these prices the whole lease’s reported sales were about $8,890 over 12 reported months. Your estimated share is $35 before taxes and deductions.

Monthly owner volumes and values
Estimated share before tax and deductions
MonthOil (bbl)Oil valueGas (mcf)Gas valueTotal
August 20260$0.000$0.00$0.00
July 20260$0.000$0.00$0.00
June 20260$0.000$0.00$0.00
May 20260$0.000$0.00$0.00
April 20260$0.000$0.00$0.00
March 20260$0.000$0.00$0.00
February 20260$0.001.1836$4.28$4.28
January 20260$0.001.4063$10.86$10.86
December 20250$0.001.3438$5.72$5.72
November 20250$0.001.4102$5.34$5.34
October 20250$0.001.457$4.65$4.65
September 20250$0.001.3047$3.87$3.87

SourcesMarket: U.S. Energy Information Administration (Henry Hub for gas, taken per thousand cubic feet). Investors: no public parent's filing is on record for the operator. Tax office and tax approval: Texas Comptroller. The third price shows once the Comptroller's records for this lease have arrived. As of October 1, 2026.

Watch Plus sets these prices beside the price on each of your statements, every month.See Watch Plus

Who takes the oil and gasNew

The gas buyer and the operator share an officer

The State lists who gathers and who buys from each lease. Company filings list who owns whom. Here they are on one drawing.

GAS
ON RECORDThe companies list an officer in common
Runs the leaseUpp Operating, LLCsince April 2019
Gathers 100%STONEWATER PIPELINE COMPANY LLCsince February 2008
Buys 100%ENERVEST OPERATING, L.L.C.since September 2015

Selling to a related company is common and legal. It is also the first thing an auditor looks at, because the price between the two is set inside one company.

SourcesBuyers and gatherers: Railroad Commission Form P-4 records, as of October 24, 2026. Ownership: U.S. Securities and Exchange Commission filings.

Seen from space, 2025New

No satellite heat at this pad in 2025

Weather satellites pass over Texas every night and record heat on the ground. Drag the photo from day to night. Beside it, each night of 2025 next to what the operator reported burning.

A-4809 · SEC. 24 · BLK G · GWT&P RR COONE SATELLITE PIXEL, ABOUT 375 M
DAYNIGHT, 2025
Each dot is a nightFlaring reported
JAN0none
FEB0none
MAR0none
APR0none
MAY0none
JUN0none
JUL0none
AUG0none
SEP0none
OCT0none
NOV0none
DEC0none

A lit dot is a night a satellite recorded heat within 500 m of a well on this lease. The red bar is gas reported vented or flared that month.

0

nights with heat recorded at this pad, 2025.

0

months in which flaring was reported.

0

months with heat seen and no flaring reported.

Where the gas went in 2025, as the operator reported it

87.4%Sold4,094 thousand cubic feet
12.6%Used on the lease588 thousand cubic feet

SourcesHeat: NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data); the readings at this pad from NOAA-20, NOAA-21 and Suomi NPP, through November 23, 2026. Reported flaring and gas use: Railroad Commission production reports. Cloud hides heat, so the count of nights is a floor. The satellite records heat. It does not say what burned.

Watch Plus checks whether you were paid on gas in the months heat was seen.See Watch Plus

Where the gas went, month by month

88% of the gas went to a transmission line in the last 12 months

Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.

88% of the gas went to a transmission line in the last 12 monthsShare of Hunt 24 gas by disposition code each month, October 2023 to February 2026. 88% of the gas went to a transmission line in the last 12 months.Share of the lease’s gas by disposition code, per month0%50%100%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
88% of the gas went to a transmission line in the last 12 monthsShare of Hunt 24 gas by disposition code each month, October 2023 to February 2026. 88% of the gas went to a transmission line in the last 12 months.Share of gas by disposition code0%50%100%Jan 24JulJan 25JulJan 26Jul
  • Transmission line (2)88% · 3,992 mcf
  • Lease fuel (1)12% · 555 mcf

SourcesRailroad Commission production reports, gas disposition by code, October 2023 to February 2026.

The county appraisal roll

No public roll figures

County mineral roll

No public roll figures

There are no publishable figures for this lease from the 2026 county mineral roll.

Royalty Clerk has mineral rolls for 166 Texas counties.

Source County appraisal district mineral rolls.

From the state record

What owners ask about Hunt 24

01When is the check for February 2026 due?
February 2026 is the newest month the state has posted for this lease. Texas law gives the payor until 60 days after the end of the sale month for oil and 90 for gas: the gas by May 29, 2026, unless the lease sets another time.
Source: Railroad Commission production reports; Texas Natural Resources Code §91.402.
See your next three checks
02Which Texas production tax rate applies?
The Texas Comptroller lists low producing wells for this lease, from Nov 1, 2009. Its file does not give the rate, so we compare your stub with the full 7.5%. That is for February 2026.
Source: Texas Comptroller, approved severance tax exemptions.
Check the tax on your stub
03Who buys the oil and gas?
GASEnervest Operating, L.l.c.100%
Gas from gas wells: Enervest Operating, L.l.c. buys it; Stonewater Pipeline Company LLC gathers it. The buyer's price is what a royalty check is figured on.
Source: Railroad Commission Form P-4, gatherers and purchasers.
See every buyer and past buyers
04How many 1099s should an owner expect for 2025?
1January to December 2025: one operator of record in all 12 months
One company, Upp Operating, LLC, filed this lease's reports behind every 2025 check, so most owners get one form. The operator is not always the company that pays, so go by the name on the stubs.
Source: Railroad Commission production reports, operator of record by month.
Check your 1099 against it

Every monthly report the State holds

242 months, newest first

Ledger for Hunt 24
MonthGas soldthousand cubic feetFlared or ventedthousand cubic feetSold forat public pricesOperator
SeptemberSep 2026No report on file–
AugustAug 2026No oil or gas reportedUpp Operating, LLC
JulyJul 2026No oil or gas reportedUpp Operating, LLC
JuneJun 2026No oil or gas reportedUpp Operating, LLC
MayMay 2026No oil or gas reportedUpp Operating, LLC
AprilApr 2026No oil or gas reportedUpp Operating, LLC
MarchMar 2026No oil or gas reportedUpp Operating, LLC
FebruaryFeb 20263030$1,100Upp Operating, LLC
JanuaryJan 20263600$2,780Upp Operating, LLC
DecemberDec 20253440$1,470Upp Operating, LLC
NovemberNov 20253610$1,370Upp Operating, LLC
OctoberOct 20253730$1,190Upp Operating, LLC
SeptemberSep 20253340$992Upp Operating, LLC
AugustAug 20253810$1,110Upp Operating, LLC
JulyJul 20254140$1,320Upp Operating, LLC
JuneJun 20254650$1,400Upp Operating, LLC
MayMay 20254640$1,450Upp Operating, LLC
AprilApr 202580$27Upp Operating, LLC

SourcesTexas Railroad Commission Production Data Query, through September 2026. Prices: EIA.

Do your checks match this lease?

Check my statement

Example

A whole month was never paid

The State shows 28,175 barrels of oil sold from the lease in the month its operator changed from Operator A to Operator B, so the owner's share is 27.51 barrels. No statement covers that month.

Ask Operator B's owner relations: is that month held in suspense after the change of operator?

$2,277oil and gas

A sample finding, from our example check.

Around this lease

Nearby

Upp Operating, LLC in Crockett County

All Upp Operating, LLC leases

Sawyer (Canyon) field

All leases in this field

Leases within 10 km

New drilling permits in Crockett County

  • UNIVERSITY 40 B #1603WCnew drill · horizontal · Sem Operating Company LLC · Oct 19, 2026
  • UNIVERSITY 40 B #1601WCnew drill · horizontal · Sem Operating Company LLC · Oct 19, 2026
  • HATTON, E.H. ESTATE '14' #4recompletion · Scout Energy Management LLC · Aug 21, 2026
  • HATTON, E.H. ESTATE '8D' #3recompletion · Scout Energy Management LLC · Aug 20, 2026
  • WARREN, W. K. FOUNDATION '24' #12recompletion · Scout Energy Management LLC · Aug 20, 2026

Same name in district 7C

Sister leases

Where it sits

This county

Crockett CountyCrockettIrionUptonReaganCrockett County
Crockett County

Where this page comes from

  • Railroad Commission of Texas production, Form P-4, permits, wells
  • Texas Comptroller tax approvals, lease values
  • U.S. Energy Information Administration prices
  • SEC EDGAR company filings
  • NOAA storms and cold
  • NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data) night heat
  • U.S. Geological Survey photos

How this page is made

Our software builds this page from the public records above. Every figure on it is computed from them, and the page is rebuilt when a source publishes a new month or a new roll. Where the page has a written summary, our software writes it from the page's own figures, and it is checked against them before it goes up. Royalty Clerk is run by AGI Solutions LLC; no operator pays for a page or sees one first.