Skip to content
A-261 · ELY, J NA-92 · BBB&C RR CO1RHA-261ELY, J NA-92BBB&C RR COLEONARD · 494 ACRESN500 m32.4561° N 97.1293° W · PHOTO: U.S. GEOLOGICAL SURVEY

Texas gas wellRRC 09-220001Producing

Leonard

One well on 494 acres in Johnson County. The lease produced 23,594 thousand cubic feet of gas in the last 12 months, through September 2026.

Is your family on this lease?

Email me when this lease changesI own here

County
Johnson
On record since
April 2006
Newest report on file
September 2026
Unit on the newest permit
494 acres

Outline: the original land surveys this lease's wells sit in. The State publishes no lease outlines. RRC surveys, 2026-09-29.

What the checks found on this lease

Checked, nothing found: silent months, operator changes, price and tax, heat from space and new wells.

Royalty Watch tells you the month any of this changes on your own lease: a silent month, a drop, a new buyer or a well's next stage.Watch this lease

Eight things the public record says about this lease. Each one sets two records side by side, and one that finds nothing still shows and says so. Photo: U.S. Geological Survey.

The story, from 246 monthly reports

On record since April 2006

Gas reported each month (sales where filed, otherwise production) since April 2006The numbers match the paragraphs below
20102015202020251Apr 20062Jan 20173Apr 20194September 2026Apr 2006 onward

April 2006: the first month the lease sold gas on record, 168 thousand cubic feet.

January 2017: Enervest Operating, L.L.C. took over from EOG Resources, Inc..

April 2019: Upp Operating, LLC took over from Enervest Operating, L.L.C..

September 2026 is the newest monthly production report on file.

SourceRailroad Commission production reports, April 2006 through September 2026. Not a forecast, not reserves.

246 months against 7 other recordsNew

Every month since April 2006, and what else happened that month

The lease is the line on top. Under it, on the same clock: the weather, the State, the price, the wells next door, who ran the lease, who bought from it and the rest of the field. Move across it.

Oct 2016
4,171 mcf · level with the three months before
Gas averaged $2.98 an mcf · EOG Resources, Inc.
  • Nothing else on record this month.
SINCEAPR 2006201020152020202501,2502,5003,7505,000MCF A MONTHLAST 12 MONTHS12345678WEATHERTHE STATEGAS PRICENEXT DOOROPERATORBUYERSTHE FIELDEnervest Operating, L.L.C.Upp Operating, LLC2017201820192020202120222023202420252026
The eight largest of 11 drops

Move the pointer or drag across the chart. The numbered buttons jump to each drop.

Monthly gas sold from this lease since April 2006, with seven record tracks beneath it. Use the left and right arrow keys to move month by month.. 246 months from April 2006 to September 2026. The most in one month: 93,336 mcf, May 2006. The newest month: 1,905 mcf. 2 months with nothing reported. Moments marked: 1, May 2008; 2, Jul 2008; 3, Sep 2008; 4, Dec 2008; 5, Feb 2010; 6, Mar 2010; 7, May 2010; 8, Feb 2014.

SourcesProduction, cut-offs, operators and buyers: Railroad Commission of Texas. Weather: NOAA. Prices: U.S. Energy Information Administration. Fracs: FracFocus. A record in the same month is not proof of a cause. Through September 2026.

243 months, one line eachNew

No consecutive silent months since April 2006

A gap is a month with no oil and no gas reported. Many leases end after 60 to 90 days without production unless the lease says otherwise.

0

runs of two or more months with nothing reported, since April 2006.

1,905

thousand cubic feet of gas on the newest report on file with oil or gas, for September 2026, the State's newest month.

241

of 243 months with oil or gas reported since April 2006.

64.6

thousand cubic feet of gas a day on average from October 2025 through September 2026, counting a month with no report on file as zero.

April 2006Taller line, more gas soldJune 2026
2010201520202025

A shut-in payment or work on the wells can keep a lease alive through a gap. Your own lease paper decides.

SourceRailroad Commission production reports, April 2006 through June 2026. The newest months, after June 2026, are left out of the count because reports arrive late.

21 years of state records, 2006 to 2026

Sold since April 2006

$9.03million

Only filed sales with a published price are included. Some sales figures or prices are unavailable.

Gas sold
1,727,683thousand cubic feet
Sold each year, at that month's pricesOilGas
What the oil and gas from this lease sold for each year, 2006 to 2026, at each month's public prices.
YearOil, dollarsGas, dollarsTotal
2006$0$2.92 million$2.92 million
2007$0$2.28 million$2.28 million
2008$0$948,000 in priced filings$948,000 in priced filings
2009$0$423,000$423,000
2010$0$372,000 in priced filings$372,000 in priced filings
2011$0$370,000$370,000
2012$0$201,000$201,000
2013$0$216,000$216,000
2014$0$70,800$70,800
2015$0$94,800$94,800
2016$0$128,000$128,000
2017$0$132,000$132,000
2018$0$131,000$131,000
2019$0$97,300$97,300
2020$0$66,200$66,200
2021$0$120,000$120,000
2022$0$188,000$188,000
2023$0$65,800$65,800
2024$0$55,800$55,800
2025$0$85,700$85,700
2026, 2026 so far$0$62,500$62,500

Did a relative own a share of this lease?

The bars show every year. Pick one to add up what the lease has sold since.

SourcesRailroad Commission Production Data Query, every monthly report since April 2006. EIA monthly WTI and Henry Hub prices. 2026 is part of a year, drawn lighter. Not a forecast, not reserves.

Who has run this lease

The operator changed two times, most recently in April 2019

The company named on each monthly report to the State. The operator is not always the company that pays.

  1. Upp Operating, LLCApril 2019 to now
  2. Enervest Operating, L.L.C.January 2017 to March 2019
  3. EOG Resources, Inc.April 2006 to December 2016

A new operator sets up every owner again before it pays, and often sends a new division order. See what you may sign

SourcesRailroad Commission production reports, the operator on each month’s report, April 2006 through September 2026.

The newest well, seen from the side

No well on the way. Well 1RH was completed in April 2006.

ground2,000 ft4,000 ft6,000 ft8,000 ft1RH8,275 ft deep2,103 ft sideways
  1. Permit filedNot on file
  2. Drilling startedNot on file
  3. FrackedNot on file
  4. Completion filedApril 28, 2006
  5. First production on the leaseNot on file
  6. First checkNot on file

SourcesRailroad Commission drilling permits and well records, and the FracFocus registry. Lease record built November 27, 2026.

About 6 miles across

Wells on this lease and around it

1this lease, ringed
105producing
0fracked and waiting
1permits, last 24 months
4plugged
35original land surveys

For a lawyer, a buyer or a probate file. Wells and permits within about 2 miles. Railroad Commission of Texas, FracFocus and USGS imagery.

Use this map on your site

You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.

Download the picture (WebP)
<a href="https://royaltyclerk.com/texas/leases/leonard-09-220001-g"><img src="https://royaltyclerk.com/maps/lease-wells/leonard-09-220001-g.svg" alt="Map of the Leonard lease in Johnson County, Texas: its well ringed, among 130 wells and 1 recent drilling location in a picture about 6 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/leases/leonard-09-220001-g">Wells on the Leonard lease, Johnson County, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>

From the State's well records

One well on this lease

Wells on Leonard
WellAPI numberCompletedSidewaysfeetDepthfeetToday
1RH42-251-30810April 20062,1038,275Active

SourceRailroad Commission wellbore and completion records.

What the drilling permits say

494acres on the newest permit

494 ACRES
  • 494 acres, on the 2006 permits
Check your decimal on this lease

Gas, September 2026, dollars per thousand cubic feet New

Four prices for the same gas

What the market paid, what the operator told its investors, what it told the tax office for this lease, and the one only you hold.

$2.95
The marketHenry Hub, September 2026
none on file
Told its investorsno public parent's filing on record
not on file yet
Told the tax officeTexas Comptroller, this lease
?
Your statementonly you hold this one
On recordNo lower tax on record

No lower tax approval on file

Usual gas rate
7.50%

No lower tax approval appears for this lease in the two years covered by the Comptroller’s list as of October 1, 2026.

Estimate your royalty

Type the decimal from your division order

The starting decimal is an example. Nothing you type here leaves this page.

$28a month

At these prices the whole lease’s reported sales were about $85,600 over 12 reported months. Your estimated share is $334 before taxes and deductions.

Monthly owner volumes and values
Estimated share before tax and deductions
MonthOil (bbl)Oil valueGas (mcf)Gas valueTotal
September 20260$0.007.4414$21.95$21.95
August 20260$0.007.3906$20.55$20.55
July 20260$0.007.5313$21.77$21.77
June 20260$0.007.3477$23.15$23.15
May 20260$0.007.6953$22.62$22.62
April 20260$0.007.0547$19.54$19.54
March 20260$0.007.9688$24.23$24.23
February 20260$0.007.3945$26.77$26.77
January 20260$0.008.2422$63.63$63.63
December 20250$0.007.9961$34.06$34.06
November 20250$0.007.9141$29.99$29.99
October 20250$0.008.1875$26.12$26.12

SourcesMarket: U.S. Energy Information Administration (Henry Hub for gas, taken per thousand cubic feet). Investors: no public parent's filing is on record for the operator. Tax office and tax approval: Texas Comptroller. The third price shows once the Comptroller's records for this lease have arrived. As of October 1, 2026.

Watch Plus sets these prices beside the price on each of your statements, every month.See Watch Plus

Who takes the oil and gasNew

The gas gatherer and the operator share an officer

The State lists who gathers and who buys from each lease. Company filings list who owns whom. Here they are on one drawing.

GAS
ON RECORDThe companies list an officer in common
Runs the leaseUpp Operating, LLCsince April 2019
Gathers 100%ENERVEST OPERATING, L.L.C.since January 2017
Buys 100%ENERGY TRANSFER COMPANYsince October 2006
OIL
Runs the leaseUpp Operating, LLCsince April 2019
Gathers 100%SHELL TRADING (US) COMPANYsince October 2006

No shared owner, officer or address on record between the oil buyers and the operator.

Selling to a related company is common and legal. It is also the first thing an auditor looks at, because the price between the two is set inside one company.

SourcesBuyers and gatherers: Railroad Commission Form P-4 records, as of October 24, 2026. Ownership: U.S. Securities and Exchange Commission filings.

Seen from space, 2025New

No satellite heat at this pad in 2025

Weather satellites pass over Texas every night and record heat on the ground. Drag the photo from day to night. Beside it, each night of 2025 next to what the operator reported burning.

A-261 · ELY, J NA-92 · BBB&C RR COONE SATELLITE PIXEL, ABOUT 375 M
DAYNIGHT, 2025
Each dot is a nightFlaring reported
JAN0none
FEB0none
MAR0none
APR0none
MAY0none
JUN0none
JUL0none
AUG0none
SEP0none
OCT0none
NOV0none
DEC0none

A lit dot is a night a satellite recorded heat within 500 m of a well on this lease. The red bar is gas reported vented or flared that month.

0

nights with heat recorded at this pad, 2025.

0

months in which flaring was reported.

0

months with heat seen and no flaring reported.

Where the gas went in 2025, as the operator reported it

100%Sold24,330 thousand cubic feet

SourcesHeat: NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data); the readings at this pad from NOAA-20, NOAA-21 and Suomi NPP, through November 26, 2026. Reported flaring and gas use: Railroad Commission production reports. Cloud hides heat, so the count of nights is a floor. The satellite records heat. It does not say what burned.

Watch Plus checks whether you were paid on gas in the months heat was seen.See Watch Plus

Where the gas went, month by month

All of the gas went to a processing plant in the last 12 months

Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.

All of the gas went to a processing plant in the last 12 monthsShare of Leonard gas by disposition code each month, October 2023 to September 2026. All of the gas went to a processing plant in the last 12 months.Share of the lease’s gas by disposition code, per month0%50%100%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
All of the gas went to a processing plant in the last 12 monthsShare of Leonard gas by disposition code each month, October 2023 to September 2026. All of the gas went to a processing plant in the last 12 months.Share of gas by disposition code0%50%100%Jan 24JulJan 25JulJan 26Jul

SourcesRailroad Commission production reports, gas disposition by code, October 2023 to September 2026.

The county appraisal roll

Roll not on file

County mineral roll

Roll not on file

Johnson Appraisal District’s mineral roll has not been read here yet.

Royalty Clerk has mineral rolls for 166 Texas counties.

Source County appraisal district mineral rolls.

From the state record

What owners ask about Leonard

01When is the check for September 2026 due?
September 2026 is the newest month the state has posted for this lease. Texas law gives the payor until 60 days after the end of the sale month for oil and 90 for gas: the gas by Dec 29, 2026, unless the lease sets another time.
Source: Railroad Commission production reports; Texas Natural Resources Code §91.402.
See your next three checks
02Which Texas production tax rate applies?
The Texas Comptroller lists no approved exemption or reduced rate for this lease for September 2026, so the full 7.5% on gas applies.
Source: Texas Comptroller, approved severance tax exemptions.
Check the tax on your stub
03Who buys the oil and gas?
CONDShell Trading (Us) Company100%
GASEnergy Transfer Company100%
Condensate: Shell Trading (Us) Company gathers it. Gas from gas wells: Energy Transfer Company buys it; Enervest Operating, L.l.c. gathers it. The buyer's price is what a royalty check is figured on.
Source: Railroad Commission Form P-4, gatherers and purchasers.
See every buyer and past buyers
04How many 1099s should an owner expect for 2025?
1January to December 2025: one operator of record in all 12 months
One company, Upp Operating, LLC, filed this lease's reports behind every 2025 check, so most owners get one form. The operator is not always the company that pays, so go by the name on the stubs.
Source: Railroad Commission production reports, operator of record by month.
Check your 1099 against it

Every monthly report the State holds

246 months, newest first

Ledger for Leonard
MonthGas soldthousand cubic feetFlared or ventedthousand cubic feetSold forat public pricesOperator
SeptemberSep 20261,9050$5,620Upp Operating, LLC
AugustAug 20261,8920$5,260Upp Operating, LLC
JulyJul 20261,9280$5,570Upp Operating, LLC
JuneJun 20261,8810$5,930Upp Operating, LLC
MayMay 20261,9700$5,790Upp Operating, LLC
AprilApr 20261,8060$5,000Upp Operating, LLC
MarchMar 20262,0400$6,200Upp Operating, LLC
FebruaryFeb 20261,8930$6,850Upp Operating, LLC
JanuaryJan 20262,1100$16,300Upp Operating, LLC
DecemberDec 20252,0470$8,720Upp Operating, LLC
NovemberNov 20252,0260$7,680Upp Operating, LLC
OctoberOct 20252,0960$6,690Upp Operating, LLC
SeptemberSep 20252,0010$5,940Upp Operating, LLC
AugustAug 20252,0340$5,920Upp Operating, LLC
JulyJul 20252,0490$6,560Upp Operating, LLC
JuneJun 20251,9750$5,960Upp Operating, LLC
MayMay 20252,1250$6,630Upp Operating, LLC
AprilApr 20252,0210$6,910Upp Operating, LLC

SourcesTexas Railroad Commission Production Data Query, through September 2026. Prices: EIA.

Do your checks match this lease?

Check my statement

Example

A whole month was never paid

The State shows 28,175 barrels of oil sold from the lease in the month its operator changed from Operator A to Operator B, so the owner's share is 27.51 barrels. No statement covers that month.

Ask Operator B's owner relations: is that month held in suspense after the change of operator?

$2,277oil and gas

A sample finding, from our example check.

Around this lease

Nearby

Upp Operating, LLC in Johnson County

All Upp Operating, LLC leases

Newark, East (Barnett Shale) field

All leases in this field

Leases within 10 km

  • Leonard17,563 mcf last 12 months · 0.2 km
  • Leonard35,392 mcf last 12 months · 0.2 km
  • Southern Baptistno production in the last 12 months · 0.5 km
  • Reynolds737 mcf last 12 months · 1 km
  • Reynolds61,296 mcf last 12 months · 1 km
  • Leonard7,766 mcf last 12 months · 1.1 km
  • Leonard45,169 mcf last 12 months · 1.1 km
  • Leonard14 mcf last 12 months · 1.1 km
  • Reynolds22,079 mcf last 12 months · 1.2 km
  • Reynolds34,209 mcf last 12 months · 1.2 km

Drilling permits within 10 km

  • FERGUSON FOUNDATION SWD #2new drill · Upp Operating, LLC · Dec 13, 2024 · 0.7 km

Same name in district 09

Where it sits

This county

Johnson CountyJohnsonHoodHillEllisTarrantDallasParkerSomervellJohnson County
Johnson County

Where this page comes from

  • Railroad Commission of Texas production, Form P-4, permits, wells
  • Texas Comptroller tax approvals, lease values
  • U.S. Energy Information Administration prices
  • SEC EDGAR company filings
  • NOAA storms and cold
  • NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data) night heat
  • U.S. Geological Survey photos

How this page is made

Our software builds this page from the public records above. Every figure on it is computed from them, and the page is rebuilt when a source publishes a new month or a new roll. Where the page has a written summary, our software writes it from the page's own figures, and it is checked against them before it goes up. Royalty Clerk is run by AGI Solutions LLC; no operator pays for a page or sees one first.