Skip to content
A-779 · SEC. 2 · BLK D14 · C&M RR COA-83 · SEC. 1 · BLK D14 · C&M RR CO120119118122121123A-779SEC. 2 · BLK D14 · C&M RR COA-83SEC. 1 · BLK D14 · C&M RR COMALLET LAND & CATTLE CO. · 2,560 ACRESN500 m33.3807° N 102.5359° W · PHOTO: U.S. GEOLOGICAL SURVEY

Texas oil leaseRRC 8A-69399Producing

Mallet Land & Cattle Co.

One well on 2,560 acres in Terry County. The lease produced 1,494 barrels of oil in the last 12 months, through September 2026.

Is your family on this lease?

Email me when this lease changesI own here

County
Terry
On record since
January 2010
Newest report on file
September 2026
Unit on the newest permit
2,560 acres

Outline: the original land surveys this lease's wells sit in. The State publishes no lease outlines. RRC surveys, 2026-09-29.

What the checks found on this lease

  • 10 drops in production have no other record beside them in the same month, of 14 on record.
  • New operator, September 2025. Bce-Mach III LLC took over from Sabinal Energy Operating, LLC. A change of operator is when payments most often stop or go into suspense.
  • A lower tax rate. The State approved a lower severance tax on this lease's production within the last two years. The part below shows which wells and months it covers; the tax line on a statement should follow it.

Checked, nothing found: silent months, buyers, heat from space and new wells.

Royalty Watch tells you the month any of this changes on your own lease: a silent month, a drop, a new buyer or a well's next stage.Watch this lease

Eight things the public record says about this lease. Each one sets two records side by side, and one that finds nothing still shows and says so. Photo: U.S. Geological Survey.

The story, from 201 monthly reports

On record since January 2010

Oil sold each month since January 2010The numbers match the paragraphs below
201220142016201820202022202420261Jan 20102Mar 20123Oct 20174Sep 20255September 2026Jan 2010 onward

January 2010: the first month the lease sold oil on record, 480 barrels.

March 2012: four new wells were completed on the lease.

October 2017: Sabinal Energy Operating, LLC took over from Chevron U. S. A. Inc..

September 2025: Bce-Mach III LLC took over from Sabinal Energy Operating, LLC.

September 2026 is the newest monthly production report on file.

SourceRailroad Commission production reports, January 2010 through September 2026. Not a forecast, not reserves.

Checks stopped on this lease?

Operator

Operator changed: Bce-Mach III LLC took over from Sabinal Energy Operating, LLC in Sep 2025.

SourceRailroad Commission production, P-5 and P-4 records, data through September 2026.See why checks stop on this lease

201 months against 7 other recordsNew

Every month since January 2010, and what else happened that month

The lease is the line on top. Under it, on the same clock: the weather, the State, the price, the wells next door, who ran the lease, who bought from it and the rest of the field. Move across it.

May 2020
18 barrels · down 93.9% on the three months before
Oil averaged $28.56 a barrel · Sabinal Energy Operating, LLC
  • Field68 of 112 other producing leases in Terry County fell the same month.
SINCEJAN 20102010201220142016201820202022202420260125250375500BARRELS A MONTHLAST 12 MONTHS12345678WEATHERTHE STATEOIL PRICENEXT DOOROPERATORBUYERSTHE FIELDSabinal Energy Operating, LLCBce-Mach III2017201820192020202120222023202420252026
The eight largest of 14 drops

Move the pointer or drag across the chart. The numbered buttons jump to each drop.

Monthly oil sold from this lease since January 2010, with eight record tracks beneath it. Use the left and right arrow keys to move month by month.. 201 months from January 2010 to September 2026. The most in one month: 1,345 barrels, September 2012. The newest month: 159 barrels. 1 month with nothing reported. Moments marked: 1, May 2010; 2, Jun 2010; 3, Jul 2010; 4, Oct 2010; 5, Aug 2017; 6, Nov 2017; 7, Dec 2017; 8, May 2020.

SourcesProduction, cut-offs, operators and buyers: Railroad Commission of Texas. Weather: NOAA. Prices: U.S. Energy Information Administration. Fracs: FracFocus. A record in the same month is not proof of a cause. Through September 2026.

197 months, one line eachNew

No consecutive silent months since January 2010

A gap is a month with no oil and no gas reported. Many leases end after 60 to 90 days without production unless the lease says otherwise.

0

runs of two or more months with nothing reported, since January 2010.

159

barrels of oil and 103 thousand cubic feet of gas on the newest report on file with oil or gas, for September 2026, the State's newest month.

196

of 197 months with oil or gas reported since January 2010.

3.93

barrels of oil a day on average from September 2025 through August 2026, counting a month with no report on file as zero.

January 2010Taller line, more oil soldMay 2026
20122014201620182020202220242026

A shut-in payment or work on the wells can keep a lease alive through a gap. Your own lease paper decides.

SourceRailroad Commission production reports, January 2010 through May 2026. The newest months, after May 2026, are left out of the count because reports arrive late.

17 years of state records, 2010 to 2026

Sold since January 2010

$6.69million

Only filed sales with a published price are included. Some sales figures or prices are unavailable.

Oil sold
80,991barrels
Gas sold
95,195thousand cubic feet
Sold each year, at that month's pricesOilGas
What the oil and gas from this lease sold for each year, 2010 to 2026, at each month's public prices.
YearOil, dollarsGas, dollarsTotal
2010$487,000$18,500$506,000
2011$807,000$33,000$840,000
2012$1.03 million$52,000$1.08 million
2013$1.03 million$81,400$1.11 million
2014$961,000$63,900$1.03 million
2015$301,000$31,300$333,000
2016$240,000$16,700$257,000
2017$146,000$6,990 in priced filings$153,000 in priced filings
2018$167,000$3,860$170,000
2019$129,000$4,090$133,000
2020$124,000$3,760$127,000
2021$205,000$6,600$211,000
2022$218,000$6,050$224,000
2023$171,000$145$171,000
2024$144,000$1,050$145,000
2025$100,000$2,180$102,000
2026, 2026 so far$99,700$2,040$102,000

Did a relative own a share of this lease?

The bars show every year. Pick one to add up what the lease has sold since.

SourcesRailroad Commission Production Data Query, every monthly report since January 2010. EIA monthly WTI and Henry Hub prices. 2026 is part of a year, drawn lighter. Not a forecast, not reserves.

Who has run this lease

The operator changed two times, most recently in September 2025

The company named on each monthly report to the State. The operator is not always the company that pays.

  1. Bce-Mach III LLCSeptember 2025 to now
  2. Sabinal Energy Operating, LLCOctober 2017 to August 2025
  3. Chevron U. S. A. Inc.January 2010 to September 2017

A new operator sets up every owner again before it pays, and often sends a new division order. See what you may sign

SourcesRailroad Commission production reports, the operator on each month’s report, January 2010 through September 2026.

The newest well, seen from the side

No well on the way. Well 123 was completed in March 2012.

ground2,000 ft4,000 ft1235,113 ft deep
  1. Permit filedNot on file
  2. Drilling startedNot on file
  3. FrackedNot on file
  4. Completion filedMarch 20, 2012
  5. First production on the leaseNot on file
  6. First checkNot on file

SourcesRailroad Commission drilling permits and well records, and the FracFocus registry. Lease record built November 17, 2026.

About 7 miles across

Wells on this lease and around it

6this lease, ringed
268producing
0fracked and waiting
1permits, last 24 months
128plugged
68original land surveys

For a lawyer, a buyer or a probate file. Wells and permits within about 2 miles. Railroad Commission of Texas, FracFocus and USGS imagery.

Use this map on your site

You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.

Download the picture (WebP)
<a href="https://royaltyclerk.com/texas/leases/mallet-land-cattle-co-8a-69399"><img src="https://royaltyclerk.com/maps/lease-wells/mallet-land-cattle-co-8a-69399.svg" alt="Map of the Mallet Land &amp; Cattle Co. lease in Terry County, Texas: its 6 wells ringed, among 406 wells and 1 recent drilling location in a picture about 7 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/leases/mallet-land-cattle-co-8a-69399">Wells on the Mallet Land &amp; Cattle Co. lease, Terry County, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>

From the State's well records

Six wells on this lease, five plugged

Wells on Mallet Land & Cattle Co.
WellAPI numberCompletedDepthfeetToday
11842-445-32205July 20085,316Plugged
11942-445-32241January 20105,104Active
12042-445-32315March 20125,093Plugged
12142-445-32316March 20125,106Plugged
12242-445-32317March 20125,084Plugged
12342-445-32318March 20125,113Plugged

SourceRailroad Commission wellbore and completion records.

What the drilling permits say

2,560acres on the newest permit

2,560 ACRES
  • 2,560 acres, on the 2008 to 2011 permits
Check your decimal on this lease

Oil, August 2026, dollars per barrel New

Four prices for the same oil

What the market paid, what the operator told its investors, what it told the tax office for this lease, and the one only you hold.

$83.90
The marketWTI Cushing, August 2026
none on file
Told its investorsno public parent's filing on record
not on file yet
Told the tax officeTexas Comptroller, this lease
?
Your statementonly you hold this one
On recordA lower tax is on record

The State approved a lower tax for this lease

Kind
Low Producing Leases
Wells
The whole lease
Runs
February 2016 to no end date on file
Rate
Not given in the file

Look at the tax line on your statement for this lease. The record says which rate applies.

Estimate your royalty

Type the decimal from your division order

The starting decimal is an example. Nothing you type here leaves this page.

$37a month

At these prices the whole lease’s reported sales were about $115,000 over 12 reported months. Your estimated share is $448 before taxes and deductions.

Monthly owner volumes and values
Estimated share before tax and deductions
MonthOil (bbl)Oil valueGas (mcf)Gas valueTotal
September 20260.6211$60.440.4023$1.19$61.63
August 20260.4766$39.980.3984$1.11$41.09
July 20260.5781$46.520$0.00$46.52
June 20260.4336$36.770.293$0.92$37.70
May 20260.457$46.680.1797$0.53$47.20
April 20260.4961$49.770$0.00$49.77
March 20260.5508$50.330.3398$1.03$51.36
February 20260.4648$29.990.3008$1.09$31.08
January 20260.4844$29.080.2734$2.11$31.19
December 20250.5117$29.660.4648$1.98$31.64
November 20250.1484$8.920.1406$0.53$9.45
October 20250.1563$9.510.082$0.26$9.78

SourcesMarket: U.S. Energy Information Administration (WTI Cushing for oil; Henry Hub for gas, taken per thousand cubic feet). Investors: no public parent's filing is on record for the operator. Tax office and tax approval: Texas Comptroller. The third price shows once the Comptroller's records for this lease have arrived. As of October 1, 2026.

Watch Plus sets these prices beside the price on each of your statements, every month.See Watch Plus

Who takes the oil and gasNew

No buyer shares an owner with the operator

The State lists who gathers and who buys from each lease. Company filings list who owns whom. Here they are on one drawing.

OIL
Runs the leaseBce-Mach III LLCsince September 2025
Gathers 25%BRIDGER TRANSPORTATION, LLCsince February 2017

No shared owner, officer or address on record between the oil buyers and the operator.

Also on the P-4: PLAINS MARKETING, L.P. gathers 25%, PLAINS PIPELINE L.P. gathers 25% and SENTINEL TRANSPORTATION, LLC gathers 25%.

GAS
Runs the leaseBce-Mach III LLCsince September 2025
Gathers and buys 100%TARGA MIDSTREAM SERVICES LLCsince October 2011

No shared owner, officer or address on record between the gas buyers and the operator.

SourcesBuyers and gatherers: Railroad Commission Form P-4 records, as of October 24, 2026. Ownership: U.S. Securities and Exchange Commission filings.

Seen from space, 2025New

No satellite heat at this pad in 2025

Weather satellites pass over Texas every night and record heat on the ground. Drag the photo from day to night. Beside it, each night of 2025 next to what the operator reported burning.

A-779 · SEC. 2 · BLK D14 · C&M RR COA-83 · SEC. 1 · BLK D14 · C&M RR COONE SATELLITE PIXEL, ABOUT 375 M
DAYNIGHT, 2025
Each dot is a nightFlaring reported
JAN01 mcf
FEB04 mcf
MAR01 mcf
APR0none
MAY08 mcf
JUN01 mcf
JUL0none
AUG04 mcf
SEP05 mcf
OCT01 mcf
NOV0none
DEC0none

A lit dot is a night a satellite recorded heat within 500 m of a well on this lease. The red bar is gas reported vented or flared that month.

0

nights with heat recorded at this pad, 2025.

8

months in which flaring was reported, 25 thousand cubic feet in all.

0

months with heat seen and no flaring reported.

Where the gas went in 2025, as the operator reported it

96.0%Sold599 thousand cubic feet
4.01%Flared or vented25 thousand cubic feet

SourcesHeat: NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data); the readings at this pad from NOAA-20, NOAA-21 and Suomi NPP, through November 23, 2026. Reported flaring and gas use: Railroad Commission production reports. Cloud hides heat, so the count of nights is a floor. The satellite records heat. It does not say what burned.

Watch Plus checks whether you were paid on gas in the months heat was seen.See Watch Plus

Where the gas went, month by month

97% of the gas went to a processing plant in the last 12 months

Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.

97% of the gas went to a processing plant in the last 12 monthsShare of Mallet Land & Cattle Co. gas by disposition code each month, October 2023 to September 2026. 97% of the gas went to a processing plant in the last 12 months. 2.8% of the gas was flared in the last 12 months. 17 months above 3%, the most 100.0% in October 2023.Share of the lease’s gas by disposition code, per month0%50%100%Flared 100.0%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
97% of the gas went to a processing plant in the last 12 monthsShare of Mallet Land & Cattle Co. gas by disposition code each month, October 2023 to September 2026. 97% of the gas went to a processing plant in the last 12 months. 2.8% of the gas was flared in the last 12 months. 17 months above 3%, the most 100.0% in October 2023.Share of gas by disposition code0%50%100%Flared 100.0%Jan 24JulJan 25JulJan 26Jul
  • Processing plant (3)97% · 736 mcf
  • Flared (4)2.8% · 21 mcf

2.8% of the gas was flared in the last 12 months. 17 months above 3%, the most 100.0% in October 2023.

SourcesRailroad Commission production reports, gas disposition by code, October 2023 to September 2026.

The county appraisal roll

Roll not on file

County mineral roll

Roll not on file

Terry Appraisal District’s mineral roll has not been read here yet.

Royalty Clerk has mineral rolls for 166 Texas counties.

Source County appraisal district mineral rolls.

From the state record

What owners ask about Mallet Land & Cattle Co.

01When is the check for September 2026 due?
September 2026 is the newest month the state has posted for this lease. Texas law gives the payor until 60 days after the end of the sale month for oil and 90 for gas: the oil by Nov 29, 2026 and the gas by Dec 29, 2026, unless the lease sets another time.
Source: Railroad Commission production reports; Texas Natural Resources Code §91.402.
See your next three checks
02Which Texas production tax rate applies?
The Texas Comptroller lists low producing leases for this lease, from Feb 1, 2016. Its file does not give the rate, so we compare your stub with the full 4.6%. That is for September 2026.
Source: Texas Comptroller, approved severance tax exemptions.
Check the tax on your stub
03Who buys the oil and gas?
OILBridger Transportation, LLC25%
GASTarga Midstream Services LLC100%
Oil: Bridger Transportation, LLC, Plains Marketing, L.p., Plains Pipeline L.p. and Sentinel Transportation, LLC gather it. Gas from oil wells: Targa Midstream Services LLC buys and gathers it. The buyer's price is what a royalty check is figured on.
Source: Railroad Commission Form P-4, gatherers and purchasers.
See every buyer and past buyers
04How many 1099s should an owner expect for 2025?
2January to December 2025: 2 operators of record
Two companies filed this lease's reports behind 2025 checks: Sabinal Energy Operating, LLC and Bce-Mach III LLC. An owner paid by more than one of them gets a form from each. The operator is not always the company that pays, so go by the names on the stubs.
Source: Railroad Commission production reports, operator of record by month.
Check your 1099 against it

Every monthly report the State holds

201 months, newest first

Ledger for Mallet Land & Cattle Co.
MonthOil soldbarrelsGas soldthousand cubic feetFlared or ventedthousand cubic feetSold forat public pricesOperator
SeptemberSep 20261591032$15,800Bce-Mach III LLC
AugustAug 20261221023$10,500Bce-Mach III LLC
JulyJul 202614803$11,900Bce-Mach III LLC
JuneJun 2026111750$9,650Bce-Mach III LLC
MayMay 2026117460$12,100Bce-Mach III LLC
AprilApr 202612701$12,700Bce-Mach III LLC
MarchMar 20261418711 · 12.6%$13,100Bce-Mach III LLC
FebruaryFeb 2026119770$7,960Bce-Mach III LLC
JanuaryJan 2026124700$7,990Bce-Mach III LLC
DecemberDec 20251311190$8,100Bce-Mach III LLC
NovemberNov 202538360$2,420Bce-Mach III LLC
OctoberOct 202540211 · 4.76%$2,500Bce-Mach III LLC
SeptemberSep 2025113235 · 21.7%$7,300Bce-Mach III LLC
AugustAug 2025168584 · 6.90%$11,100Sabinal Energy Operating, LLC
JulyJul 2025163620$11,300Sabinal Energy Operating, LLC
JuneJun 2025141551$9,780Sabinal Energy Operating, LLC
MayMay 2025166428 · 19.0%$10,500Sabinal Energy Operating, LLC
AprilApr 2025138330$8,880Sabinal Energy Operating, LLC

SourcesTexas Railroad Commission Production Data Query, through September 2026. Prices: EIA.

Do your checks match this lease?

Check my statement

Example

A whole month was never paid

The State shows 28,175 barrels of oil sold from the lease in the month its operator changed from Operator A to Operator B, so the owner's share is 27.51 barrels. No statement covers that month.

Ask Operator B's owner relations: is that month held in suspense after the change of operator?

$2,277oil and gas

A sample finding, from our example check.

Around this lease

Nearby

Bce-Mach III LLC in Terry County

All Bce-Mach III LLC leases

Leases within 10 km

Drilling permits within 10 km

  • COONS, W. A. #80new drill · Hilcorp Energy Company · Oct 30, 2026 · 7.4 km
  • FRAZIER, W.G. #95recompletion · Occidental Permian EOR, LLC · Oct 14, 2026 · 6.9 km
  • FRAZIER, W.G. #110Wrecompletion · Occidental Permian EOR, LLC · Oct 14, 2026 · 7 km
  • SUNTURA (LOWER CLEAR FORK) UNIT #7RWnew drill · Basin Oil & Gas Operating, LLC · Sept 16, 2026 · 6.6 km
  • SUNTURA (LOWER CLEAR FORK) UNIT #12Wnew drill · Basin Oil & Gas Operating, LLC · Sept 15, 2026 · 6.2 km

Same name in district 8A

Where it sits

This county

Terry CountyTerryHockleyYoakumCochranLynnLubbockTerry County
Terry County

Where this page comes from

  • Railroad Commission of Texas production, Form P-4, permits, wells
  • Texas Comptroller tax approvals, lease values
  • U.S. Energy Information Administration prices
  • NOAA storms and cold
  • NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data) night heat
  • U.S. Geological Survey photos

How this page is made

Our software builds this page from the public records above. Every figure on it is computed from them, and the page is rebuilt when a source publishes a new month or a new roll. Where the page has a written summary, our software writes it from the page's own figures, and it is checked against them before it goes up. Royalty Clerk is run by AGI Solutions LLC; no operator pays for a page or sees one first.