Skip to content
A-15 · ALSTON, W L1A-15ALSTON, W LMAPLES-BARRETT UNIT · 320 ACRESN500 m33.2590° N 97.5292° W · PHOTO: U.S. GEOLOGICAL SURVEY

Texas gas wellRRC 09-090202Producing

Maples-Barrett Unit

One well on 320 acres in Wise County. The lease produced 5,614 thousand cubic feet of gas in the last 12 months, through August 2026.

17 royalty accounts on the county roll

Is your family on this lease?

Email me when this lease changesI own here

County
Wise
On record since
January 1993
Newest report on file
August 2026
Unit on the newest permit
320 acres

Outline: the original land surveys this lease's wells sit in. The State publishes no lease outlines. RRC surveys, 2026-09-29.

What the checks found on this lease

  • 17 silent months. March 2020 to July 2021.
  • 5 drops in production have no other record beside them in the same month, of 7 on record.
  • A lower tax rate. The State approved a lower severance tax on this lease's production within the last two years. The part below shows which wells and months it covers; the tax line on a statement should follow it.

Checked, nothing found: operator changes, buyers, heat from space and new wells.

Royalty Watch tells you the month any of this changes on your own lease: a silent month, a drop, a new buyer or a well's next stage.Watch this lease

Eight things the public record says about this lease. Each one sets two records side by side, and one that finds nothing still shows and says so. Photo: U.S. Geological Survey.

The story, from 404 monthly reports

On record since January 1993

Gas reported each month (sales where filed, otherwise production) since January 1993The numbers match the paragraphs below
1995200020052010201520202025119932Aug 20133Mar 20204August 2026Jan 1993 onward

January 1993, where the State's monthly records start: the lease sold 2,643 thousand cubic feet of gas that month.

August 2013: Texxol Operating Company, Inc. took over from Richey, Ray Management Co., Inc..

March 2020 to July 2021: 17 months in a row with no oil and no gas reported.

August 2026 is the newest monthly production report on file.

SourceRailroad Commission production reports, January 1993 through August 2026. Not a forecast, not reserves.

404 months against 7 other recordsNew

Every month since January 1993, and what else happened that month

The lease is the line on top. Under it, on the same clock: the weather, the State, the price, the wells next door, who ran the lease, who bought from it and the rest of the field. Move across it.

Apr 2017
974 mcf · down 46.3% on the three months before
Gas averaged $3.10 an mcf · Texxol Operating Company, Inc.
  • WeatherFlood, April 17. Flood, April 17.
SINCEJAN 1993199520002005201020152020202501,0002,0003,0004,000MCF A MONTHLAST 12 MONTHS1234567WEATHERTHE STATEGAS PRICENEXT DOOROPERATORBUYERSTHE FIELDTexxol Operating Company, Inc.2017201820192020202120222023202420252026
Seven drops

Move the pointer or drag across the chart. The numbered buttons jump to each drop.

Monthly gas sold from this lease since January 1993, with eight record tracks beneath it. Use the left and right arrow keys to move month by month.. 404 months from January 1993 to August 2026. The most in one month: 4,322 mcf, June 1994. The newest month: 393 mcf. 21 months with nothing reported. Moments marked: 1, Oct 1999; 2, Jan 2001; 3, Aug 2002; 4, Feb 2009; 5, Sep 2011; 6, Dec 2016; 7, Apr 2017.

SourcesProduction, cut-offs, operators and buyers: Railroad Commission of Texas. Weather: NOAA. Prices: U.S. Energy Information Administration. Fracs: FracFocus. A record in the same month is not proof of a cause. Through August 2026.

401 months, one line eachNew

17 months of silence from 2020 to 2021

A gap is a month with no oil and no gas reported. Many leases end after 60 to 90 days without production unless the lease says otherwise.

17

months in a row with nothing reported, March 2020 to July 2021. Reports are on file for all 17 months, with no oil and no gas. The longest silence on record here.

393

thousand cubic feet of gas on the newest report on file with oil or gas, for August 2026, the State's newest month.

380

of 401 months with oil or gas reported since January 1993.

15.4

thousand cubic feet of gas a day on average from September 2025 through August 2026, counting a month with no report on file as zero.

January 1993Taller line, more gas soldMay 2026
1995200020052010201520202025ENLARGED BELOW
2019 to 2021, enlarged
2019SON2020MAMJJASONDJ2021FMAMJJ17 months, nothing reported

A shut-in payment or work on the wells can keep a lease alive through a gap. Your own lease paper decides.

SourceRailroad Commission production reports, January 1993 through May 2026. The newest months, after May 2026, are left out of the count because reports arrive late.

34 years of state records, 1993 to 2026

Sold since January 1993

$2.21million

Only filed sales with a published price are included. Some sales figures or prices are unavailable.

Oil sold
37barrels
Gas sold
567,746thousand cubic feet
Sold each year, at that month's pricesOilGas
What the oil and gas from this lease sold for each year, 1993 to 2026, at each month's public prices.
YearOil, dollarsGas, dollarsTotal
1993$0$59,400$59,400
1994$0$60,200$60,200
1995$0$43,500$43,500
1996$789$55,000$55,800
1997$0$57,700$57,700
1998$0$41,500$41,500
1999$0$57,600$57,600
2000$0$124,000$124,000
2001$0$77,000$77,000
2002$0$64,200$64,200
2003$0$140,000$140,000
2004$0$141,000$141,000
2005$0$192,000$192,000
2006$0$115,000$115,000
2007$0$121,000$121,000
2008$0$179,000$179,000
2009$0$79,400$79,400
2010$0$74,000$74,000
2011$0$46,500$46,500
2012$0$38,900$38,900
2013$0$60,900$60,900
2014$0$74,400$74,400
2015$0$48,600$48,600
2016$0$65,900$65,900
2017$0$40,100$40,100
2018$0$24,900$24,900
2019$0$11,400 in priced filings$11,400 in priced filings
2020$0$1,360$1,360
2021$0$31,700$31,700
2022$0$39,500$39,500
2023$0$10,500$10,500
2024$0$12,100$12,100
2025$0$9,650$9,650
2026, 2026 so far$0$16,500$16,500

Did a relative own a share of this lease?

The bars show every year. Pick one to add up what the lease has sold since.

SourcesRailroad Commission Production Data Query, every monthly report since January 1993. EIA monthly WTI and Henry Hub prices (before 1997, EIA's Texas wellhead gas price). 2026 is part of a year, drawn lighter. Not a forecast, not reserves.

Who has run this lease

The operator changed once, most recently in August 2013

The company named on each monthly report to the State. The operator is not always the company that pays.

  1. Texxol Operating Company, Inc.August 2013 to now
  2. Richey, Ray Management Co., Inc.January 1993 to July 2013

A new operator sets up every owner again before it pays, and often sends a new division order. See what you may sign

SourcesRailroad Commission production reports, the operator on each month’s report, January 1993 through August 2026.

The newest well, seen from the side

No well on the way. Well 1 was completed in August 1980.

ground2,000 ft4,000 ft6,000 ft16,600 ft deep
  1. Permit filedNot on file
  2. Drilling startedNot on file
  3. FrackedNot on file
  4. Completion filedAugust 1, 1980
  5. First production on the leaseNot on file
  6. First checkNot on file

SourcesRailroad Commission drilling permits and well records, and the FracFocus registry. Lease record built November 18, 2026.

About 6 miles across

Wells on this lease and around it

1this lease, ringed
63producing
0fracked and waiting
1permits, last 24 months
16plugged
63original land surveys

For a lawyer, a buyer or a probate file. Wells and permits within about 2 miles. Railroad Commission of Texas, FracFocus and USGS imagery.

Use this map on your site

You may show this map on any site, unchanged. Keep the credit line and its link to Royalty Clerk under the map. The picture updates by itself as the state records new wells and permits.

Download the picture (WebP)
<a href="https://royaltyclerk.com/texas/leases/maples-barrett-unit-09-090202-g"><img src="https://royaltyclerk.com/maps/lease-wells/maples-barrett-unit-09-090202-g.svg" alt="Map of the Maples-Barrett Unit lease in Wise County, Texas: its well ringed, among 110 wells and 1 recent drilling location in a picture about 6 miles across." width="1000" height="951" loading="lazy" style="max-width:100%;height:auto;border:0"></a>
<p style="margin:4px 0 0;font-size:14px">Map: <a href="https://royaltyclerk.com/texas/leases/maples-barrett-unit-09-090202-g">Wells on the Maples-Barrett Unit lease, Wise County, Texas</a> by Royalty Clerk, from Railroad Commission of Texas records</p>

From the State's well records

One well on this lease

Wells on Maples-Barrett Unit
WellAPI numberCompletedDepthfeetToday
142-497-31854August 19806,600Active

SourceRailroad Commission wellbore and completion records.

What the drilling permits say

320acres on the newest permit

320 ACRES
  • 320 acres, on the 1980 permits
Check your decimal on this lease

Gas, August 2026, dollars per thousand cubic feet New

Four prices for the same gas

What the market paid, what the operator told its investors, what it told the tax office for this lease, and the one only you hold.

$2.78
The marketHenry Hub, August 2026
none on file
Told its investorsno public parent's filing on record
not on file yet
Told the tax officeTexas Comptroller, this lease
?
Your statementonly you hold this one
On recordA lower tax is on record

The State approved a lower tax for this lease

Kind
Low Producing Wells
Wells
The whole lease
Runs
May 2009 to no end date on file
Rate
Not given in the file

Look at the tax line on your statement for this lease. The record says which rate applies.

Estimate your royalty

Type the decimal from your division order

The starting decimal is an example. Nothing you type here leaves this page.

$6.54a month

At these prices the whole lease’s reported sales were about $20,100 over 12 reported months. Your estimated share is $79 before taxes and deductions.

Monthly owner volumes and values
Estimated share before tax and deductions
MonthOil (bbl)Oil valueGas (mcf)Gas valueTotal
August 20260$0.001.5352$4.27$4.27
July 20260$0.001.9961$5.77$5.77
June 20260$0.002.5313$7.97$7.97
May 20260$0.003.1094$9.14$9.14
April 20260$0.002.1914$6.07$6.07
March 20260$0.001.9297$5.87$5.87
February 20260$0.002.7266$9.87$9.87
January 20260$0.002.0273$15.65$15.65
December 20250$0.001.1758$5.01$5.01
November 20250$0.000.7266$2.75$2.75
October 20250$0.000.9414$3.00$3.00
September 20250$0.001.0391$3.09$3.09

SourcesMarket: U.S. Energy Information Administration (Henry Hub for gas, taken per thousand cubic feet). Investors: no public parent's filing is on record for the operator. Tax office and tax approval: Texas Comptroller. The third price shows once the Comptroller's records for this lease have arrived. As of October 1, 2026.

Watch Plus sets these prices beside the price on each of your statements, every month.See Watch Plus

Who takes the oil and gasNew

No buyer shares an owner with the operator

The State lists who gathers and who buys from each lease. Company filings list who owns whom. Here they are on one drawing.

GAS
Runs the leaseTexxol Operating Company, Inc.since August 2013
Gathers and buys 100%TARGA MIDSTREAM SERVICES LLCsince August 2013

No shared owner, officer or address on record between the gas buyers and the operator.

OIL
Runs the leaseTexxol Operating Company, Inc.since August 2013
Gathers 100%PTT PREMIER TRADING AND TRAN LLCsince November 2023

No shared owner, officer or address on record between the oil buyers and the operator.

Earlier buyers and gatherers, back to 1993
Earlier companies named on the Form P-4
CompanyProductRoleFromUntil
GULFMARK ENERGY, INC.OilGathersSep 2020Nov 2023
SUNOCO PTNRS. MKTG.&TERMINALS LPOilGathersAug 2013Sep 2020

SourcesBuyers and gatherers: Railroad Commission Form P-4 records, as of October 24, 2026. Ownership: U.S. Securities and Exchange Commission filings.

Seen from space, 2025New

No satellite heat at this pad in 2025

Weather satellites pass over Texas every night and record heat on the ground. Drag the photo from day to night. Beside it, each night of 2025 next to what the operator reported burning.

A-15 · ALSTON, W LONE SATELLITE PIXEL, ABOUT 375 M
DAYNIGHT, 2025
Each dot is a nightFlaring reported
JAN0none
FEB0none
MAR0none
APR0none
MAY0none
JUN0none
JUL0none
AUG0none
SEP0none
OCT0none
NOV0none
DEC0none

A lit dot is a night a satellite recorded heat within 500 m of a well on this lease. The red bar is gas reported vented or flared that month.

0

nights with heat recorded at this pad, 2025.

0

months in which flaring was reported.

0

months with heat seen and no flaring reported.

Where the gas went in 2025, as the operator reported it

100%Sold2,717 thousand cubic feet

SourcesHeat: NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data); the readings at this pad from NOAA-20, NOAA-21 and Suomi NPP, through November 24, 2026. Reported flaring and gas use: Railroad Commission production reports. Cloud hides heat, so the count of nights is a floor. The satellite records heat. It does not say what burned.

Watch Plus checks whether you were paid on gas in the months heat was seen.See Watch Plus

Where the gas went, month by month

All of the gas went to a processing plant in the last 12 months

Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.

All of the gas went to a processing plant in the last 12 monthsShare of Maples-Barrett Unit gas by disposition code each month, September 2023 to August 2026. All of the gas went to a processing plant in the last 12 months.Share of the lease’s gas by disposition code, per month0%50%100%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
All of the gas went to a processing plant in the last 12 monthsShare of Maples-Barrett Unit gas by disposition code each month, September 2023 to August 2026. All of the gas went to a processing plant in the last 12 months.Share of gas by disposition code0%50%100%Jan 24JulJan 25JulJan 26Jul

SourcesRailroad Commission production reports, gas disposition by code, September 2023 to August 2026.

Wise County Appraisal District, 2026 mineral roll

17 royalty accounts on the county roll

Wise County Appraisal DistrictMineral roll 2026 · RRC 09-090202
ReadOct 7, 2026
Owners
29
Accounts
29
Appraised in all
$10,420

Is one of these yours?

Each square is one account

  • Royalty 17
  • Overriding royalty 11
  • Working interest 1

SourceWise County Appraisal District, 2026 mineral roll (source), read October 7, 2026. Accounts matched to this lease by RRC number or lease name.

From the state record

What owners ask about Maples-Barrett Unit

01When is the check for August 2026 due?
August 2026 is the newest month the state has posted for this lease. Texas law gives the payor until 60 days after the end of the sale month for oil and 90 for gas: the gas by Nov 29, 2026, unless the lease sets another time.
Source: Railroad Commission production reports; Texas Natural Resources Code §91.402.
See your next three checks
02Which Texas production tax rate applies?
The Texas Comptroller lists low producing wells for this lease, from May 1, 2009. Its file does not give the rate, so we compare your stub with the full 7.5%. That is for August 2026.
Source: Texas Comptroller, approved severance tax exemptions.
Check the tax on your stub
03Who buys the oil and gas?
CONDPtt Premier Trading and Tran LLC100%
GASTarga Midstream Services LLC100%
Condensate: Ptt Premier Trading and Tran LLC gathers it. Gas from gas wells: Targa Midstream Services LLC buys and gathers it. The buyer's price is what a royalty check is figured on.
Source: Railroad Commission Form P-4, gatherers and purchasers.
See every buyer and past buyers
04How many 1099s should an owner expect for 2025?
1January to December 2025: one operator of record in all 12 months
One company, Texxol Operating Company, Inc., filed this lease's reports behind every 2025 check, so most owners get one form. The operator is not always the company that pays, so go by the name on the stubs.
Source: Railroad Commission production reports, operator of record by month.
Check your 1099 against it

Every monthly report the State holds

404 months, newest first

Ledger for Maples-Barrett Unit
MonthOil soldbarrelsGas soldthousand cubic feetFlared or ventedthousand cubic feetSold forat public pricesOperator
AugustAug 202603930$1,090Texxol Operating Company, Inc.
JulyJul 202605110$1,480Texxol Operating Company, Inc.
JuneJun 202606480$2,040Texxol Operating Company, Inc.
MayMay 202607960$2,340Texxol Operating Company, Inc.
AprilApr 202605610$1,550Texxol Operating Company, Inc.
MarchMar 202604940$1,500Texxol Operating Company, Inc.
FebruaryFeb 202606980$2,530Texxol Operating Company, Inc.
JanuaryJan 202605190$4,010Texxol Operating Company, Inc.
DecemberDec 202503010$1,280Texxol Operating Company, Inc.
NovemberNov 202501860$705Texxol Operating Company, Inc.
OctoberOct 202502410$769Texxol Operating Company, Inc.
SeptemberSep 202502660$790Texxol Operating Company, Inc.
AugustAug 202502700$786Texxol Operating Company, Inc.
JulyJul 202502590$829Texxol Operating Company, Inc.
JuneJun 202503210$969Texxol Operating Company, Inc.
MayMay 2025No oil or gas reportedTexxol Operating Company, Inc.
AprilApr 202501240$424Texxol Operating Company, Inc.
MarchMar 202501730$713Texxol Operating Company, Inc.

SourcesTexas Railroad Commission Production Data Query, through August 2026. Prices: EIA.

Do your checks match this lease?

Check my statement

Example

A whole month was never paid

The State shows 28,175 barrels of oil sold from the lease in the month its operator changed from Operator A to Operator B, so the owner's share is 27.51 barrels. No statement covers that month.

Ask Operator B's owner relations: is that month held in suspense after the change of operator?

$2,277oil and gas

A sample finding, from our example check.

Around this lease

Nearby

Texxol Operating Company, Inc. in Wise County

All Texxol Operating Company, Inc. leases

Boonsville (Bend Congl., Gas) field

All leases in this field

Leases within 10 km

Drilling permits within 10 km

  • DECATUR GU 3 1 (AW) #1Hrecompletion · horizontal · BKV Barnett, LLC · Sept 14, 2026 · 5.2 km
  • RUTHERFORD-GRIFFETH DEEP 4 (AW) #4Hnew drill · horizontal · BKV Barnett, LLC · May 6, 2026 · 9.1 km
  • RUTHERFORD-GRIFFETH DEEP 1 (AW) #1Hnew drill · horizontal · BKV Barnett, LLC · May 6, 2026 · 9.1 km
  • RUTHERFORD-GRIFFETH DEEP 2 (AW) #2Hnew drill · horizontal · BKV Barnett, LLC · May 6, 2026 · 9.1 km
  • RUTHERFORD-GRIFFETH DEEP 3 (AW) #3Hnew drill · horizontal · BKV Barnett, LLC · May 6, 2026 · 9.1 km

Where it sits

This county

Wise CountyWiseJackClayCookeMontagueDentonWise County
Wise County

Where this page comes from

  • Railroad Commission of Texas production, Form P-4, permits, wells
  • Texas Comptroller tax approvals, lease values
  • U.S. Energy Information Administration prices
  • NOAA storms and cold
  • NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data) night heat
  • Wise County Appraisal District mineral roll
  • U.S. Geological Survey photos

How this page is made

Our software builds this page from the public records above. Every figure on it is computed from them, and the page is rebuilt when a source publishes a new month or a new roll. Where the page has a written summary, our software writes it from the page's own figures, and it is checked against them before it goes up. Royalty Clerk is run by AGI Solutions LLC; no operator pays for a page or sees one first.