Texas gas wellRRC 09-276222Producing
McCall B Unit
One well on 209 acres in Montague County. The lease produced 10,183 thousand cubic feet of gas in the last 12 months, through August 2026.
- Operator
- Eagleridge Operating, LLC
- County
- Montague
- On record since
- August 2014
- Newest report on file
- August 2026
- Unit on the newest permit
- 209 acres
Outline: the original land surveys this lease's wells sit in. The State publishes no lease outlines. RRC surveys, 2026-09-29.
What the checks found on this lease
- 5 silent months. April to August 2018.
- 6 drops in production have no other record beside them in the same month, of 8 on record.
- A lower tax rate. The State approved a lower severance tax on this lease's production within the last two years. The part below shows which wells and months it covers; the tax line on a statement should follow it.
Checked, nothing found: operator changes, buyers, heat from space and new wells.
Royalty Watch tells you the month any of this changes on your own lease: a silent month, a drop, a new buyer or a well's next stage.Watch this lease
The story, from 145 monthly reports
On record since August 2014
November 2014: the first month the lease sold gas on record, 3,349 thousand cubic feet.
March 2015: U.S. Energy Development Corp took over.
November 2017: Eagleridge Operating, LLC took over from U.S. Energy Development Corp.
April 2018 to August 2018: five months in a row with no oil and no gas reported.
August 2026 is the newest monthly production report on file.
SourceRailroad Commission production reports, August 2014 through August 2026. Not a forecast, not reserves.
145 months against 7 other recordsNew
Every month since August 2014, and what else happened that month
The lease is the line on top. Under it, on the same clock: the weather, the State, the price, the wells next door, who ran the lease, who bought from it and the rest of the field. Move across it.
Gas averaged $2.65 an mcf · Eagleridge Operating, LLC
- Nothing else on record this month.
Move the pointer or drag across the chart. The numbered buttons jump to each drop.
Monthly gas sold from this lease since August 2014, with eight record tracks beneath it. Use the left and right arrow keys to move month by month.. 145 months from August 2014 to August 2026. The most in one month: 20,489 mcf, August 2016. The newest month: 269 mcf. 95 months with nothing reported. Moments marked: 1, Jan 2015; 2, Jul 2015; 3, Aug 2015; 4, Nov 2015; 5, Feb 2018; 6, Mar 2018; 7, Sep 2018; 8, Apr 2019.
SourcesProduction, cut-offs, operators and buyers: Railroad Commission of Texas. Weather: NOAA. Prices: U.S. Energy Information Administration. Fracs: FracFocus. A record in the same month is not proof of a cause. Through August 2026.
144 months, one line eachNew
Five months of silence in 2018
A gap is a month with no oil and no gas reported. Many leases end after 60 to 90 days without production unless the lease says otherwise.
months in a row with nothing reported, April to August 2018. Reports are on file for all 5 months, with no oil and no gas. The only silence on record here.
thousand cubic feet of gas on the newest report on file with oil or gas, for August 2026, the State's newest month.
of 144 months with oil or gas reported since June 2014.
thousand cubic feet of gas a day on average from September 2025 through August 2026, counting a month with no report on file as zero.
A shut-in payment or work on the wells can keep a lease alive through a gap. Your own lease paper decides.
SourceRailroad Commission production reports, June 2014 through May 2026. The newest months, after May 2026, are left out of the count because reports arrive late.
13 years of state records, 2014 to 2026
Sold since August 2014
$1.57million
Only filed sales with a published price are included. Some sales figures or prices are unavailable.
- Oil sold
- 15,282barrels
- Gas sold
- 225,329thousand cubic feet
| Year | Oil, dollars | Gas, dollars | Total |
|---|---|---|---|
| 2014 | $419,000 | $35,300 | $455,000 |
| 2015 | $195,000 | $163,000 in priced filings | $357,000 in priced filings |
| 2016 | $88,700 | $184,000 | $273,000 |
| 2017 | $70,800 | $208,000 | $279,000 |
| 2018 | $14,600 | $38,500 in priced filings | $53,000 in priced filings |
| 2019 | $52,200 | $4,730 | $56,900 |
| 2020 | $19,700 | $0 | $19,700 |
| 2021 | $12,000 | $0 | $12,000 |
| 2022 | $26,800 | $0 | $26,800 |
| 2023 | $20,000 | $0 | $20,000 |
| 2024 | $10,500 | $906 | $11,400 |
| 2025 | $1,070 | $219 | $1,290 |
| 2026, 2026 so far | $0 | $774 | $774 |
Did a relative own a share of this lease?
SourcesRailroad Commission Production Data Query, every monthly report since August 2014. EIA monthly WTI and Henry Hub prices. 2026 is part of a year, drawn lighter. Not a forecast, not reserves.
Who has run this lease
The operator changed two times, most recently in November 2017
The company named on each monthly report to the State. The operator is not always the company that pays.
- Eagleridge Operating, LLCNovember 2017 to now
- U.S. Energy Development CorpMarch 2015 to October 2017
- Operator number 902622August 2014 to February 2015
A new operator sets up every owner again before it pays, and often sends a new division order. See what you may sign
SourcesRailroad Commission production reports, the operator on each month’s report, August 2014 through August 2026.
The newest well, seen from the side
No well on the way. Well 1 was completed in April 2014.
- Permit filedNot on file
- Drilling startedNot on file
- FrackedNot on file
- Completion filedApril 18, 2014
- First production on the leaseNot on file
- First checkNot on file
SourcesRailroad Commission drilling permits and well records, and the FracFocus registry. Lease record built November 17, 2026.
About 6 miles across
Wells on this lease and around it
For a lawyer, a buyer or a probate file. Wells and permits within about 2 miles. Railroad Commission of Texas, FracFocus and USGS imagery.
From the State's well records
One well on this lease
| Well | API number | Completed | Sidewaysfeet | Depthfeet | Today |
|---|---|---|---|---|---|
| 1 | 42-337-35088 | April 2014 | 5,611 | 7,266 | Active |
SourceRailroad Commission wellbore and completion records.
What the drilling permits say
209acres on the newest permit
- 209 acres, on the 2013 permits
A Rule 37 case is listed The RRC permit records list a Rule 37 case. This does not establish your royalty share. Ask for the permit and unit plat for your well.
Gas, August 2026, dollars per thousand cubic feet New
Four prices for the same gas
What the market paid, what the operator told its investors, what it told the tax office for this lease, and the one only you hold.
The State approved a lower tax for this lease
- Kind
- Low Producing Wells
- Wells
- The whole lease
- Runs
- April 2018 to no end date on file
- Rate
- Not given in the file
Look at the tax line on your statement for this lease. The record says which rate applies.
Estimate your royalty
Type the decimal from your division order
The starting decimal is an example. Nothing you type here leaves this page.
$0.27a month
At these prices the whole lease’s reported sales were about $832 over 12 reported months. Your estimated share is $3.25 before taxes and deductions.
Monthly owner volumes and values
| Month | Oil (bbl) | Oil value | Gas (mcf) | Gas value | Total |
|---|---|---|---|---|---|
| August 2026 | 0 | $0.00 | 1.0508 | $2.92 | $2.92 |
| July 2026 | 0 | $0.00 | 0.0352 | $0.10 | $0.10 |
| June 2026 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| May 2026 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| April 2026 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| March 2026 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| February 2026 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| January 2026 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| December 2025 | 0.0039 | $0.23 | 0 | $0.00 | $0.23 |
| November 2025 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| October 2025 | 0 | $0.00 | 0 | $0.00 | $0.00 |
| September 2025 | 0 | $0.00 | 0 | $0.00 | $0.00 |
SourcesMarket: U.S. Energy Information Administration (Henry Hub for gas, taken per thousand cubic feet; WTI Cushing for oil). Investors: no public parent's filing is on record for the operator. Tax office and tax approval: Texas Comptroller. The third price shows once the Comptroller's records for this lease have arrived. As of October 1, 2026.
Watch Plus sets these prices beside the price on each of your statements, every month.See Watch Plus
Who takes the oil and gasNew
No buyer shares an owner with the operator
The State lists who gathers and who buys from each lease. Company filings list who owns whom. Here they are on one drawing.
No shared owner, officer or address on record between the gas buyers and the operator.
No shared owner, officer or address on record between the oil buyers and the operator.
Earlier buyers and gatherers, back to 1993
| Company | Product | Role | From | Until |
|---|---|---|---|---|
| GULFMARK ENERGY, INC. | Oil | Gathers | Dec 2018 | Nov 2023 |
| TARGA MIDSTREAM SERVICES LLC | Gas | Buys | Apr 2014 | Nov 2023 |
Who buys my oilOil price check
SourcesBuyers and gatherers: Railroad Commission Form P-4 records, as of October 24, 2026. Ownership: U.S. Securities and Exchange Commission filings.
Seen from space, 2025New
No satellite heat at this pad in 2025
Weather satellites pass over Texas every night and record heat on the ground. Drag the photo from day to night. Beside it, each night of 2025 next to what the operator reported burning.
A lit dot is a night a satellite recorded heat within 500 m of a well on this lease. The red bar is gas reported vented or flared that month.
nights with heat recorded at this pad, 2025.
months in which flaring was reported.
months with heat seen and no flaring reported.
Where the gas went in 2025, as the operator reported it
SourcesHeat: NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data); the readings at this pad from NOAA-20, NOAA-21 and Suomi NPP, through November 23, 2026. Reported flaring and gas use: Railroad Commission production reports. Cloud hides heat, so the count of nights is a floor. The satellite records heat. It does not say what burned.
Watch Plus checks whether you were paid on gas in the months heat was seen.See Watch Plus
Where the gas went, month by month
Since Feb 2024 the lease's gas goes to lease fuel instead of a transmission line
Where gas goes decides how it is paid: processed gas can carry plant products and processing fees, gas sold straight to a pipeline usually does not.
- Lease fuel (1)97% · 9,905 mcf
- Transmission line (2)2.7% · 278 mcf
SourcesRailroad Commission production reports, gas disposition by code, September 2023 to August 2026.
The county appraisal roll
No public roll figures
County mineral roll
No public roll figures
There are no publishable figures for this lease from the 2026 county mineral roll.
Royalty Clerk has mineral rolls for 165 Texas counties.
Source County appraisal district mineral rolls.
From the state record
What owners ask about McCall B Unit
- 01When is the check for August 2026 due?
- Aug 31sale month endsNov 29gas due
- August 2026 is the newest month the state has posted for this lease. Texas law gives the payor until 60 days after the end of the sale month for oil and 90 for gas: the gas by Nov 29, 2026, unless the lease sets another time.
- Source: Railroad Commission production reports; Texas Natural Resources Code §91.402.
- See your next three checks
- 02Which Texas production tax rate applies?
- Gas7.50%
- The Texas Comptroller lists low producing wells for this lease, from Apr 1, 2018. Its file does not give the rate, so we compare your stub with the full 7.5%. That is for August 2026.
- Source: Texas Comptroller, approved severance tax exemptions.
- Check the tax on your stub
- 03Who buys the oil and gas?
- CONDPtt Premier Trading and Tran LLC100%GASTarga Midstream Services LLC100%
- Condensate: Ptt Premier Trading and Tran LLC gathers it. Gas from gas wells: Targa Midstream Services LLC buys and gathers it. The buyer's price is what a royalty check is figured on.
- Source: Railroad Commission Form P-4, gatherers and purchasers.
- See every buyer and past buyers
- 04How many 1099s should an owner expect for 2025?
- 1January to December 2025: one operator of record in all 12 months
- One company, Eagleridge Operating, LLC, filed this lease's reports behind every 2025 check, so most owners get one form. The operator is not always the company that pays, so go by the name on the stubs.
- Source: Railroad Commission production reports, operator of record by month.
- Check your 1099 against it
Every monthly report the State holds
145 months, newest first
| Month | Oil soldbarrels | Gas soldthousand cubic feet | Flared or ventedthousand cubic feet | Sold forat public prices | Operator |
|---|---|---|---|---|---|
| AugustAug 2026 | 0 | 269 | 0 | $748 | Eagleridge Operating, LLC |
| JulyJul 2026 | 0 | 9 | 0 | $26 | Eagleridge Operating, LLC |
| JuneJun 2026 | No oil or gas reported | Eagleridge Operating, LLC | |||
| MayMay 2026 | No oil or gas reported | Eagleridge Operating, LLC | |||
| AprilApr 2026 | No oil or gas reported | Eagleridge Operating, LLC | |||
| MarchMar 2026 | No oil or gas reported | Eagleridge Operating, LLC | |||
| FebruaryFeb 2026 | No oil or gas reported | Eagleridge Operating, LLC | |||
| JanuaryJan 2026 | No oil or gas reported | Eagleridge Operating, LLC | |||
| DecemberDec 2025 | 1 | 0 | 0 | $58 | Eagleridge Operating, LLC |
| NovemberNov 2025 | No oil or gas reported | Eagleridge Operating, LLC | |||
| OctoberOct 2025 | No oil or gas reported | Eagleridge Operating, LLC | |||
| SeptemberSep 2025 | No oil or gas reported | Eagleridge Operating, LLC | |||
| AugustAug 2025 | No oil or gas reported | Eagleridge Operating, LLC | |||
| JulyJul 2025 | No oil or gas reported | Eagleridge Operating, LLC | |||
| JuneJun 2025 | 5 | 0 | 0 | $341 | Eagleridge Operating, LLC |
| MayMay 2025 | 5 | 0 | 0 | $311 | Eagleridge Operating, LLC |
| AprilApr 2025 | 0 | 64 | 0 | $219 | Eagleridge Operating, LLC |
| MarchMar 2025 | No oil or gas reported | Eagleridge Operating, LLC | |||
SourcesTexas Railroad Commission Production Data Query, through August 2026. Prices: EIA.
Example
A whole month was never paid
The State shows 28,175 barrels of oil sold from the lease in the month its operator changed from Operator A to Operator B, so the owner's share is 27.51 barrels. No statement covers that month.
Ask Operator B's owner relations: is that month held in suspense after the change of operator?
$2,277oil and gas
A sample finding, from our example check.
Around this lease
Nearby
Eagleridge Operating, LLC in Montague County
- Lawler Unit12,494 mcf last 12 months
- Masengale32 bbl last 12 months
- Boedeker C Unit13,822 mcf last 12 months
- Caswell 106 bbl last 12 months
- Clark Unit8,816 mcf last 12 months
- McLaughlin405 bbl last 12 months
- Bowie-Wingate (Sa)6,295 mcf last 12 months
- Eanes South Viola211 bbl last 12 months
- Eanes South Unit103 bbl last 12 months
- Lewis-Stuart F4 Unit205 mcf last 12 months
Newark, East (Barnett Shale) field
- Askey, W. A. "B"10,595 mcf last 12 months
- Mackey, W. L. Gu 310,579 mcf last 12 months
- Miller, Jana Unit8,869 mcf last 12 months
- Brown10,570 mcf last 12 months
- Clough, Adele Gu 110,563 mcf last 12 months
- D.c.c.10,559 mcf last 12 months
- Kennon, Alfred10,559 mcf last 12 months
- Wcco 110,558 mcf last 12 months
- Chism, Royce10,542 mcf last 12 months
- Huddleston "C-D" (Sa)10,541 mcf last 12 months
Leases within 10 km
- McCall A Unit55,002 mcf last 12 months · 0 km
- Collier991 bbl last 12 months · 1.2 km
- Meador, C. D.1,621 bbl last 12 months · 1.7 km
- Sadie Unit22,180 mcf last 12 months · 1.8 km
- Sadie Unit21,838 mcf last 12 months · 1.8 km
- Reimersno production in the last 12 months · 1.8 km
- Cooksey-Collier Unit4,872 bbl last 12 months · 2 km
- Collier B Unit4 bbl last 12 months · 2.1 km
- Collier A Unit219 bbl last 12 months · 2.2 km
- Collier A Unit68,217 mcf last 12 months · 2.2 km
New drilling permits in Montague County
- SALMON D & E #33Dnew drill · V & H Oil, L.P. · Sept 2, 2026
- SALMON D & E #54Enew drill · V & H Oil, L.P. · Aug 31, 2026
- SALMON D & E #53Enew drill · V & H Oil, L.P. · Aug 31, 2026
- HARDY #1new drill · Texxol Operating Company, Inc. · Aug 21, 2026
- STORY #2new drill · Kodiak Oil & Gas, Inc. · Aug 29, 2025
Sister leases
- McCall A Unit55,002 mcf last 12 months
Where it sits
This county
Where this page comes from
- Railroad Commission of Texas production, Form P-4, permits, wells
- Texas Comptroller tax approvals, lease values
- U.S. Energy Information Administration prices
- FracFocus frac dates
- NOAA storms and cold
- NOAA-20, NOAA-21 and Suomi NPP (to November 2, 2026) VIIRS active fire product, night readings (NOAA open data) night heat
- U.S. Geological Survey photos
How this page is made
Our software builds this page from the public records above. Every figure on it is computed from them, and the page is rebuilt when a source publishes a new month or a new roll. Where the page has a written summary, our software writes it from the page's own figures, and it is checked against them before it goes up. Royalty Clerk is run by AGI Solutions LLC; no operator pays for a page or sees one first.